Setting requirements: Before starting work every day and changing shifts, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications, and report any problems found to the user unit.

The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.

Saint Etienne.Equal effect.

Setting requirements: Each landing entrance should be equipped with a landing door, which should cover the opening with its full width, and should not open towards the lifting passage.

.Human improper operation is the main factor causing malfunctions in scissor type electric elevators. When stacking goods, electric elevators should stack the goods neatly, which is better than stacking them in the center of the cargo stacking area of the cargo elevator to avoid imbalance between the two ends of the stacking area. Eventually, during the operation of the electric elevator, it may cause the electric elevator to lose balance. After the goods are stacked completely, ropes should be used to lock the goods, so that they are not afraid of the goods during the lifting process; Careless; Scattered down

Principle of electric elevator rotary valve: When the electric elevator rises,Saint EtienneElectric scissor lift, and then turn the transmission handwheel to lower the plug and achieve sealing.

Installation and dismantling personnel and drivers should hold certificates to work.


Saint EtienneHand push electric elevatorWhat are the main categories



The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances it is necessary to first turn the handle to turn the plug to a 90 degree position until it is closed, when the net height of the building entrance is less than 0m, it is allowed to lower the height of the lower door opening,Saint EtienneElectric vertical elevator, but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

Steel wire rope construction electric elevators and reusable steel wire ropes should be equipped with anti loosening rope devices, which should have compliant loosening rope switches and be able to interrupt any movement of the lifting cage until it is approved by a professional

The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of 8 meters by 2 meters.

Test method.Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.

When the landing door is closed, the full width of the lifting passage opening should be covered.

Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.


Saint EtienneHand push electric elevatorWhat are the main categories



The foundation production and acceptance of electric elevators for foundation construction should comply with the user manual and regulatory requirements.

OK or not?.Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.

Installation position of upper limit switch: Under normal working conditions, the distance between the upper limit switch and the upper limit switch is 0.15m for SC type construction electric elevators, and 0.15m for SS type construction electric elevators (person)

The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.

Saint Etienne.Setting requirements: Before starting work every day and changing shifts, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications, record the inspection results, and report any problems found to the user unit.

Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.

To meet the needs of stage craftsmanship and layout; Product; In the music and dance theater stage arranged in a zigzag pattern, auxiliary lifting platforms are often arranged in front, back, left,Saint EtienneElectric elevator factory, and right of the main stage lifting platform. The side and rear auxiliary lifting platforms are used for the smooth opening of the side platform and rear vehicle turntable, while the front auxiliary lifting platform is used to place the rear vehicle turntable near the platform entrance. The leveling lifting platform below the side platform and rear vehicle turntable can be used to level the platform after the side platform or rear vehicle turntable is driven out so that the entire platform does not have a height difference, ensuring the safety of the cast members.