VasaElectric screw elevatorDebugging process and general requirements

announcer:hp935HP175192871 release time:2024-08-15 16:28:14

Setting requirements: Before starting work every day and changing shifts, record the inspection results, and report any problems found to the user unit.

The function of the lifting platform in a theater is roughly as follows: the main lifting platform arranged in the main performance area of the stage is mainly used to quickly change the scenery. Typically, with&quo; Product; In the music and dance theater stage arranged in a zigzag pattern, the lifting platform, side car platform, and rear car turntable perform a rapid transformation of the entire or partial scene. This arrangement allows for rapid switching of three full sets.

Vasa.Is there a relevant rule requirement for the cleanliness of hydraulic stations?

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).

.The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements, otherwise protective measures shall be taken.

The verticality of the guide rail frame should meet the requirements of the specifications.

The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.


VasaElectric screw elevatorDebugging process and general requirements



News Abstract: The development of the lifting platform industry will continue to grow in recent years! With the continuous development of electric lifting machinery for high-altitude operations in recent years, the products of electric lifting platform vehicles have been continuously improved, and various new technologies and materials have emerged, making the further development of lifting platform vehicles possible.

The down travel (limit) switch should be of the automatic reset type.

Spiral electric lifting mechanism: With all the functions of a regular lifting platform, the main feature is that the equipment occupies a small foundation pit and has a large stroke. The equipment has a height of only 200-500mm and a travel distance of up to 14m. It is particularly suitable for buildings with stages built on two or more floors due to space constraints.

Quality management.Human improper operation is the main factor causing malfunctions in scissor type electric elevators. When stacking goods, which is better than stacking them in the center of the cargo stacking area of the cargo elevator to avoid imbalance between the two ends of the stacking area. Eventually, during the operation of the electric elevator it may cause the electric elevator to lose balance. After the goods are stacked completely, ropes should be used to lock the goods, so that they are not afraid of the goods during the lifting process; Careless; Scattered down

Setting requirements: The landing door should be standardized and tooled.

High lifting height, using side mounted oil cylinders, stable operation, noise free,VasaElectric background axis elevator, easy maintenance and longer service life.


VasaElectric screw elevatorDebugging process and general requirements



Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.

Equipment maintenance.Construction electric elevators outside the lightning protection range

The usual operation of landing and docking.

After the electric elevator passes the inspection,VasaElectric portable elevator, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

Vasa.Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position

The use of a lifting platform as a tool for storing performance blankets, soft scenery, etc. In some theaters, there is a soft scenery storage lifting platform located at an appropriate location on the stage for the storage of blankets, soft scenery, etc.

The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of 8 meters by 2 meters.