SasariSimple electric hoist cargo elevatorA brief introduction to the production process

announcer:hp935HP175192871 release time:2024-08-06 10:04:56

Implementing multiple shifts of homework should fill in and submit records according to regulations.

Setting requirements: The installation and dismantling workers, electricians, and other operators of construction electric elevators should have special construction operations.

Sasari.The movement of its related components is direct.

When the wall bracket cannot meet the requirements of the construction site,SasariFully automatic electric elevator, it should be designed and calculated separately.

.From the perspective of the safety performance of the machinery itself, those that have undergone national safety certification will not have significant safety issues. The main problem is that after using the electric elevator for a period of time, mechanical components may fall off or be damaged due to various factors. This problem depends on regular inspection and maintenance of the machinery

Braking. The brake limit switch for partial motion control of the electric hoist traction machine. Assembly that restricts the operation of the lift car when it is opened to a high or low position; If the limit switch controls the overtravel switch. When the car travels to a high or low position, it will take on the function of raising or lowering. In order to prevent the lift car from crashing or sinking, stage equipment should be dismantled with over travel switches that can cut off power and cannot be automatically reset, rather than in the shaft; A buffer should be installed that can absorb the energy of the moving mechanism and reduce impact.

Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends, it can automatically cut off the oil circuit and stop descent


SasariSimple electric hoist cargo elevatorA brief introduction to the production process



The scaffolding of the parking platform should be laid tightly and firmly.

The suspension cage movement can only be resumed after operator operation.

When the landing door is closed, the full width of the lifting passage opening should be covered.

Inspection standard.The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

Buffer. In order to increase the energy for the car to hit the top or sink to the bottom. Remove rubber or sponge from the buffer and cabin to increase their impact energy; Rope groove slipping and other accidents caused the car to suddenly fall, resulting in a safety clamp. To prevent breakage of the lifting wire rope. A safety clamp that can simultaneously cut off the power supply and stop the car from falling should be removed from the car. A car without safety tongs is not allowed to ride or carry people. If it is a simple electric elevator, there should be a safety device (such as a safety stop pin) to prevent people from suddenly falling when loading and unloading goods in the car; Electric elevators with three or more floors (including three floors) for passengers or passengers.

Setting requirements: The landing door should be standardized and tooled.


SasariSimple electric hoist cargo elevatorA brief introduction to the production process



During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed 50mm.

Energy costs.When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above, effective protective measures should be taken.

The shutdown device (emergency stop switch) should be non automatic reset type.

The quality of the standard section should comply with the product manual and specification requirements.

Sasari.The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station,SasariInstallation of electric elevators for fire protection, and the landing doors should function properly.

The pump body adopts an integrated pump station, all equipped with imported high-quality pump stations, which can also be selected according to customer requirements to meet customer ideal requirements.

Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, blow out the plunger with compressed air and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.