Hamburg HaburgBackground axis electric elevatorWhat are the production precautions for

announcer:hp935HP175192871 release time:2024-08-03 17:50:05

The safety distance between the outer edge of the upper part of the landing door and the moving parts of the electric elevator during normal operation should not be less than 0.75m; If the rated speed is not greater than 0.7m/s, the safety distance can be 0.40m.

Stage equipment safety door. To prevent personnel from extending their heads, hands, its cabin should be full of doors, and the height of the hoistway (hall door) should not be less than 8 meters; The electric door opening and closing switches should be removed from the vertical and passenger compartment doors. In order to prevent accidents caused by vertical,Hamburg HaburgElectric pull rod elevator, passenger car doors, and car roof doors not being closed.; Door interlocks should be installed on both the vertical and passenger compartment doors.

Hamburg Haburg.Requirements for the operation platform of the construction lowering machine and the setting of the brake reset emergency stop switch: The shutdown device (emergency stop switch) should be able to stop or maintain the electric elevator (including the power driven door) in a non working state

The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.

.Horizontal lead screw mechanical electricity

The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.

The safety distance between the outer edge of the upper part of the landing door and the moving parts of the electric elevator during normal operation should not be less than 0.75m; If the rated speed is not greater than 0.7m/s, the door should be able to withstand and have no deformation; - Deformation not exceeding 30mm; After the test, it worked normally.

Before operating the construction electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).


Hamburg HaburgBackground axis electric elevatorWhat are the production precautions for



Before installation, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.

Direct material.Double layer steel mesh: The diameter of the steel bars is 12mm with a spacing of 200mm.

Construction electric elevators should be equipped with travel limit switches, as follows: automatic reset type upper and lower limit switches should be installed on construction electric elevators, but the upper and lower limit switches should not be triggered as high

Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.

Hamburg Haburg.The hydraulic oil forms a certain pressure by the vane pump, and enters the lower end of the hydraulic cylinder through an oil filter, explosion-proof electromagnetic directional valve, throttle valve, hydraulic control one-way valve, and balance valve,Hamburg Haburg2 meter electric lifting platform, causing the hydraulic cylinder to move upwards and lift heavy objects. The return oil at the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve, and its rated pressure overflow valve is adjusted. The pressure gauge observes the reading value on the pressure gauge. The downward movement of the hydraulic cylinder (i.e. lowering of heavy objects).

The verticality of the guide rail frame should meet the requirements of the specifications.

Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.