BaileAtha IElectric hoistGood prospects for application requirements

announcer:hp935HP175192871 release time:2024-07-28 20:01:37

it is driven by the pressure generated by its own weight, greatly saving energy and reducing consumption.

Setting requirements: Each landing entrance should be equipped with a landing door, which should cover the opening with its full width, and should not open towards the lifting passage.

BaileAtha I.Lower limit switch: In normal working state, before the suspension cage touches the buffer, shallow foundation pit required,BaileAtha IElectric elevator, large stroke, stable operation, low noise, accurate positioning and low cost. Adopting a horizontal screw drive and a scissor fork structure to achieve the lifting motion of the table, it can be stopped arbitrarily within the range of travel.

.Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements,BaileAtha IGuide rail electric elevator,BaileAtha IElectric elevator mobile type, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.

Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.

High lifting height, using side mounted oil cylinders, stable operation, noise free, easy maintenance, and longer service life.


BaileAtha IElectric hoistGood prospects for application requirements



Principle of electric elevator rotary valve: When the electric elevator rises, the rotary valve will automatically open. To close the plug valve, it is necessary to first turn the handle to turn the plug to a 90 degree position until it is closed and then turn the transmission handwheel to lower the plug and achieve sealing.

.

Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

analysis.Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).

High lifting height, using side mounted oil cylinders, stable operation, noise free, easy maintenance, and longer service life.

Chain type electric lifting mechanism: With a good guiding mechanism, it can ensure that the equipment does not tilt during operation. Gear and rack electric lifting mechanism: precise transmission and high cost.


BaileAtha IElectric hoistGood prospects for application requirements



Work is essential, and the main protective accessories include safety belts, guardrails, protective covers, platforms and stairs, etc.

Industry management.There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.

The stopper bearing of the mechanism is kept intact.

When the foundation is set on the roof or floor structure, the bearing capacity of its supporting structure should be checked.

BaileAtha I.The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of 8 meters by 2 meters.

The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.

Once again weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.