TruvaAluminum alloy electric elevatorThe performance of quality regulations has reached this year's good level

announcer:hp935HP175192871 release time:2024-07-13 18:23:04

Protective measures should comply with regulatory requirements.

It is understood that the scissor type lifting platform is a widely used specialized equipment for high-altitude operations. Its shear fork mechanical structure provides high stability for the lifting platform, wide working platform, and high load-bearing capacity, 220V or 380V power supplies, diesel engines, using Italian and domestic hydraulic pump stations and the table top is equipped with anti slip insulation buckle plates, insulation which have anti slip, and safety features. Please rest assured to use.

Truva.Platform.

The scissor type electric elevator is a widely used high-altitude operation special equipment. Its scissor mechanical structure ensures high stability of the lifting platform, wide working platform, and high bearing capacity, making the high-altitude operation range wider and suitable for multiple people to work simultaneously. It makes high-altitude operation more efficient and safer

.Buffer. In order to increase the energy for the car to hit the top or sink to the bottom. Remove rubber or sponge from the buffer and cabin to increase their impact energy; Rope groove slipping and other accidents caused the car to suddenly fall,Truva10 meter electric lifting platform, resulting in a safety clamp. To prevent breakage of the lifting wire rope. A safety clamp that can simultaneously cut off the power supply and stop the car from falling should be removed from the car. A car without safety tongs is not allowed to ride or carry people. If it is a simple electric elevator, there should be a safety device (such as a safety stop pin) to prevent people from suddenly falling when loading and unloading goods in the car; Electric elevators with three or more floors (including three floors) for passengers or passengers.

Then, the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, and the lifting of goods should try to maintain a stable and uniform speed.

The landing door should meet the requirements of the specifications and achieve standardization.


TruvaAluminum alloy electric elevatorThe performance of quality regulations has reached this year



The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances, when the net height of the building entrance is less than 0m, it is allowed to lower the height of the lower door opening, but in any case the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

That's all for a brief introduction to the common types of electric elevators. I hope everyone can have a better understanding of this product. Currently, this product is selling well in China, as many places need to use this type of product that has both lifting function and flexible movement. Companies specializing in producing this type of product are now promoting it on a large scale through the internet, performance, and price information of these products. They can purchase directly through the internet.

To meet the needs of choreographers and choreographers in different plays, different heights of the lifting platform can be used to change the shape of the stage according to the requirements of the choreographers and choreographers, in order to adapt to the requirements of the plot for the scenery or venue, and save manpower and material resources for setting up. By using the tilting device of the lifting platform to form a tilted platform, special atmosphere and effects can be created. Even simple stage machinery often participates in performance activities,TruvaCustomized electric elevator, creating unexpected atmosphere and effects according to the needs of the plot. For example, using the low-speed descent of the lifting platform to represent a sunken ship in the sea, using the valves on the lifting platform and the sudden disappearance and appearance of actors on the lifting platform.

property right.Use floor doors and cage door devices on construction sites where conditions permit.

Setting requirements: The wall bracket should use the manufacturer's matching standard products.

Before installation, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.


TruvaAluminum alloy electric elevatorThe performance of quality regulations has reached this year



The landing door should meet the requirements of the specifications and achieve standardization.

High quality and low price.Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

Only after the operation of professional personnel can the suspension cage movement be restored.

The function of the lifting platform in a theater is roughly as follows: the main lifting platform arranged in the main performance area of the stage is mainly used to quickly change the scenery. Typically, with&quo; Product; In the music and dance theater stage arranged in a zigzag pattern,TruvaElectric four-wheel elevator, the lifting platform, side car platform, and rear car turntable perform a rapid transformation of the entire or partial scene. This arrangement allows for rapid switching of three full sets.

Truva.Setting requirements: Each landing entrance should be equipped with a landing door, which should cover the opening with its full width, and should not open towards the lifting passage.

The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.

Protective measures should comply with regulatory requirements.