TarantoElectric clothes drying elevatorStable price

announcer:hp935HP175192871 release time:2024-07-02 16:29:17

Steel wire ropes, pulleys, and counterweight steel wire ropes shall comply with the following regulations: the characteristics of steel wire ropes shall comply with the requirements of General Purpose Steel Wire Ropes GB/T20118; Maintenance wear, deformation, and corrosion of steel wire ropes

Every theater is a public place with a large number of people, and safety considerations should be taken into account in stage design. According to relevant national regulations in order to prevent accidents caused by the crushing of electric elevators or improper control by drivers. Electric elevators should be equipped with the following necessary safety devices to ensure that the car of the electric elevator stops rising or falling in a timely manner.

Taranto.The top of the hanging cage is accessible; d) During installation/disassembly/maintenance/inspection of the device; e) Inside the hanging cage.

Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

.The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.

When applying a normal force of 300N to any position on either side of the door using a rigid 5000mm2 square or circular flat surface in the locked position of the landing door, the door should be able to withstand and have no deformation; - Deformation not exceeding 30mm; After the test,TarantoSmall electric elevator, it worked normally.

The pump body adopts an integrated pump station, all equipped with imported high-quality pump stations, which can also be selected according to customer requirements to meet customer ideal requirements.


TarantoElectric clothes drying elevatorStable price



Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, it is also necessary to pay attention to the structure of the oil cylinder. Some oil cylinders are relatively complex internally, and how many lifting operations need to be carried out during filling to fully fill each position of the hydraulic oil. Therefore, when filling,TarantoElectric bed elevator, try to add as much as possible, and then test and run the machine empty to see if it reaches the rated position.

Human improper operation is the main factor causing malfunctions in scissor type electric elevators. When stacking goods, electric elevators should stack the goods neatly, which is better than stacking them in the center of the cargo stacking area of the cargo elevator to avoid imbalance between the two ends of the stacking area. Eventually, during the operation of the electric elevator, it may cause the electric elevator to lose balance. After the goods are stacked completely, ropes should be used to lock the goods, so that they are not afraid of the goods during the lifting process; Careless; Scattered down

Scheme customization.The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.

The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.

The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.


TarantoElectric clothes drying elevatorStable price



Setting requirements: For construction electric elevators that operate in multiple shifts,TarantoSmall mobile electric elevator, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

discount.Emergency manual valve: In case of power failure, it can cause the car to descend to the nearest floor position and open the door

Safety devices: Electric elevators for construction should be equipped with overload detection devices. When the load inside the cage exceeds 10% of the rated load capacity, the overload detection device will give a warning signal inside the cage,

Use floor doors and cage door devices on construction sites where conditions permit.

Taranto.The pump body adopts an integrated pump station, all equipped with imported high-quality pump stations, which can also be selected according to customer requirements to meet customer ideal requirements.

Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.

Spiral electric lifting mechanism: With all the functions of a regular lifting platform, the main feature is that the equipment occupies a small foundation pit and has a large stroke. The equipment has a height of only 200-500mm and a travel distance of up to 14m. It is particularly suitable for buildings with stages built on two or more floors due to space constraints.