KiswaldaPortable electric elevatorPursue a diversified industry model

announcer:hp935HP175192871 release time:2024-06-30 12:35:29

Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.

Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends, it can automatically cut off the oil circuit and stop descent

Kiswalda.Check whether the sealing of components such as the oil cylinder, oil pipe, and motor of the aluminum alloy electric elevator is good and whether there is any air leakage.

Setting requirements: The landing door should be standardized and tooled.

.Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.

The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.


KiswaldaPortable electric elevatorPursue a diversified industry model



Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.

A lifting platform with specifications ranging in height from 1 meter to 20 meters.

The quality of the standard section should comply with the product manual and specification requirements.

Industry management.The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station,KiswaldaTen meter electric elevator, and the landing doors should function properly.

Then, the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, and the lifting of goods should try to maintain a stable and uniform speed.

From the above comparison, it can be seen that hydraulic electric lifting mechanisms have stable lifting, low noise, long service life, and are relatively simple, making them suitable for use in stage equipment.


KiswaldaPortable electric elevatorPursue a diversified industry model



There is no need to set up a computer room above the shaft like an elevator and the top floor height can be installed at least 2.5 meters.

how.The pump body adopts an integrated pump station, which can also be selected according to customer requirements to meet customer ideal requirements.

Unloading platform and attached electric construction platform all equipped with imported high-quality pump stations, etc.

Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

Kiswalda.The scissor type electric elevator is a widely used high-altitude operation special equipment. Its scissor mechanical structure ensures high stability of the lifting platform, wide working platform, and high bearing capacity,KiswaldaZoomlion Electric Elevator,KiswaldaElectric elevator 8 meters, making the high-altitude operation range wider and suitable for multiple people to work simultaneously. It makes high-altitude operation more efficient and safer

Secondly, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.