HenanElectric background axis elevatorA brief introduction to the production process

announcer:hp935HP175192871 release time:2024-06-25 15:47:47

High lifting height, using side mounted oil cylinders, stable operation noise free,HenanFour wheel electric elevator,HenanHigh altitude electric elevator, easy maintenance, and longer service life.

Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness, strength, stability, etc., h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

.The verticality of the guide rail frame should meet the requirements of the specifications.

The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of 8 meters by 2 meters.

When the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than 150mm and there is no effective protection from other structures, the side protection device for the landing entrance should be equipped.


HenanElectric background axis elevatorA brief introduction to the production process



Then,Henan10 meter self-propelled elevator, the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform and the lifting of goods should try to maintain a stable and uniform speed.

Construction electric elevators should be equipped with lower limit switches that are sensitive and reliable.

Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, and the landing doors should function properly.

The downward movement of the hydraulic cylinder (i.e. heavy object lowering). The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, and the return oil from the lower end of the hydraulic cylinder passes through the balance valve, hydraulic control one-way valve, energy-saving valve, and explosion-proof electric valve

There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.

Henan.Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.

High lifting height, using side mounted oil cylinders, stable operation, easy maintenance, and longer service life.

High lifting height, using side mounted oil cylinders, stable operation, noise free, easy maintenance, and longer service life.