Bogota2 meter high electric elevatorPoints to note during rough machining

announcer:hp935HP175192871 release time:2024-06-21 09:28:58

Emergency manual valve: In case of power failure, it can cause the car to descend to the nearest floor position and open the door

Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, all components should be inspected,BogotaFolding electric elevator, and standard sections and other components with severe wear and deformation should be replaced.

Bogota.When a single steel wire rope is excessively stretched, the Electrical safety device shall stop the operation of the electric lift.

Human improper operation is the main factor causing malfunctions in scissor type electric elevators. When stacking goods, electric elevators should stack the goods neatly, which is better than stacking them in the center of the cargo stacking area of the cargo elevator to avoid imbalance between the two ends of the stacking area. Eventually, during the operation of the electric elevator, it may cause the electric elevator to lose balance. After the goods are stacked completely, ropes should be used to lock the goods, so that they are not afraid of the goods during the lifting process; Careless; Scattered down

.Operating cost advantage and low failure rate: Due to the use of advanced hydraulic systems and good methods, the operating failure rate can be reduced to a low level.

The scaffolding of the parking platform should be laid tightly and firmly.

The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.


Bogota2 meter high electric elevatorPoints to note during rough machining



Protective measures should comply with regulatory requirements.

Lowering platform, vehicle mounted lifting platform, diesel engine curved arm self-propelled lifting platform folding arm lifting platform, aluminum alloy lifting platform, and special

The foundation base or embedded parts should be fully embedded in the concrete foundation plate.

Process inspection.Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.

The net height of the landing door opening should not be less than 8m, and the difference between the net width and the outlet width of the cage door should not exceed 120mm. When the floor door is closed, except for the gap between the lower part of the door that should not exceed 35mm the size of any through-hole and opening related to the distance between any door and adjacent moving parts, as well as the gap around the door or between parts, it can automatically cut off the oil circuit and stop descent

Honest service.Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

Electric lifting machinery, as an important product of social development in China, has a high social status and has now become an irreplaceable operational tool in our mainstream goods. The hydraulic pump station is the heart position of electric lifting machinery, which greatly tests the professionalism and attention of operators. It is our common responsibility to inspect it and ensure the daily use of machinery. Let's take a look at a few common sense issues: the manufacturer of electric elevators is to ensure the correctness of the power connection, and there should be no misconnection or leakage; Pay attention to cleaning work in daily life and do not allow stains to corrode it; When standing still, regular maintenance should be carried out to prevent the impact of rain and snow weather; Overloading is the first thing that operators must comply with; Iron Law&# quo;; The adjustment of the solenoid valve cannot be done arbitrarily and must be checked and certified by a professional organization; Especially when conducting outdoor operations under high temperatures, it is necessary to always pay attention to the abnormalities of the pump station; It is very normal for us to encounter some problems when using hydraulic boarding bridges, as long as these problems are not very serious, we don't have to worry too much. However, when there is a problem with the hydraulic boarding bridge, only a timely solution is the correct response. Below is an introduction to some common faults of the hydraulic boarding bridge and specific solutions: the hydraulic boarding bridge must be repaired while hanging and supporting the working platform of the lifting platform to avoid sudden descent of the lifting platform, causing unnecessary casualties; 2. Do not adjust the overflow valve arbitrarily. Because every component in the hydraulic system operates at a specified pressure, once the relief valve is adjusted, it may cause abnormal operation of the hydraulic system, causing unnecessary damage to people, machines and objects; Non professional personnel are not allowed to disassemble electrical appliances at will to prevent electric shock or incorrect connection.

Flat screw mechanical electric lifting mechanism: The lifting platform of this structure has the advantages of small civil engineering coordination, shallow foundation pit required, large stroke,BogotaElectric elevator small, stable operation, low noise, and low cost. Adopting a horizontal screw drive and a scissor fork structure to achieve the lifting motion of the table,BogotaElectric brick elevator, it can be stopped arbitrarily within the range of travel.

Bogota.Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.

Remind customers that there are still many areas to pay attention to when maintaining and maintaining the lifting platform. We also hope that customers and friends can pay more attention when using it to ensure the safety of personnel and property, regularly maintain and extend its service life, and create greater benefits for the enterprise. What is the matching degree of electric elevators? Everyone has always been confused. In short, the matching degree of electric elevators is how the height of the electric elevator can be combined with the operating height. Electric elevators are not used frequently, so we must make it clear based on the actual operating height and actual load capacity when using electric elevators. If the frequency is too high, We suggest considering purchasing a guide rail electric elevator or a scissor fork electric elevator. The scissor fork electric elevator can achieve a maximum load capacity of 100 tons, which effectively solves the problem of load capacity. If the frequency of use is too high and the height is relatively high, we recommend using a guide rail electric elevator. This type of electric elevator is not easy to malfunction under high-frequency operation, By solving the load capacity and frequency of use, the matching problem of electric elevators is effectively solved. Concept of electric elevator rotary valve: The electric elevator rotary valve is a type of valve that quickly opens and closes, and the rotary valve can reduce oil pipeline channels and optimize line settings.