revivalCustomized electric elevatorHow to treat the construction of ecological civilization

announcer:hp935HP175192871 release time:2024-05-16 14:33:37

When the wall bracket cannot meet the requirements of the construction site, after the upper limit switch is triggered by the hanging cage, the upper small safety distance L should meet the following requirements: L=8+0.1V2, where L is the upper safety distance; V: Increase speed

Double layer steel mesh: The diameter of the steel bars is 12mm,revivalThree wheel electric elevator, with a spacing of 200mm.

.The counterweight guide rail should meet the specification requirements.

The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.

Setting requirements: The installation and dismantling workers, electricians, and other operators of construction electric elevators should have special construction operations.


revivalCustomized electric elevatorHow to treat the construction of ecological civilization



Before installation the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form,revivalElectric high-altitude elevator, and concrete strength report.

The usual operation of landing and docking. The installation position of the upper limit switch should comply with the following: when the lifting speed is less than 0.8m/s, the upper safety distance L left after the upper limit switch is triggered by the hanging cage should not be less than

Flat screw mechanical electric lifting mechanism: The lifting platform of this structure has the advantages of small civil engineering coordination, shallow foundation pit required,revivalElectric brick elevator, large stroke stable operation, low noise, accurate positioning, and low cost. Adopting a horizontal screw drive and a scissor fork structure to achieve the lifting motion of the table, it can be stopped arbitrarily within the range of travel.

Lets see.The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.

Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position

Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.


revivalCustomized electric elevatorHow to treat the construction of ecological civilization



The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.

Management Department.The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.

Check whether the sealing of components such as the oil cylinder, and motor of the aluminum alloy electric elevator is good and whether there is any air leakage.

Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.

revival.Implementing multiple shifts of homework should fill in and submit records according to regulations.

The setting of the cable guide frame should comply with the user manual and regulatory requirements.

Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.