PapenderchtElectric three wheel elevatorWhat is the main cause of surface rust

announcer:hp935HP175192871 release time:2024-05-08 09:35:25

PapenderchtElectric mobile elevator,

Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).

Papendercht.Mobile electric elevators are divided into: four wheel mobile lifting platform,PapenderchtIndoor small electric elevator, two wheel traction lifting platform, manual lifting platform, manual lifting platform, and AC/DC dual purpose lifting platform

Before operating the construction electric elevator, a hydraulic control one-way valve, also known as a hydraulic lock is added to ensure safe self-locking in the event of an accidental rupture of the hydraulic pipeline. An overload sound control alarm has been installed to distinguish between overload or equipment failure. Electrical system explosion-proof button SB1&flash; The rotation of the SB6 motor and the commutation of the explosion-proof electromagnetic directional valve are used to maintain load increase or decrease, and; Program adjustment time delay to avoid frequent movement of electric elevators that may affect their service life.


PapenderchtElectric three wheel elevatorWhat is the main cause of surface rust



Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

The water cooling of hydraulic stations is generally tubular water cooling. The selection is based on the heat load to calculate the heat exchange area, while the air-cooled electric elevator uses an air cooler to calculate the heat exchange capacity based on the heat load. Then, the selection calculation is carried out under the condition of satisfying the flow rate. So, it should be designed and calculated separately.

High value.Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.

News Abstract: The development of the lifting platform industry will continue to grow in recent years! With the continuous development of electric lifting machinery for high-altitude operations in recent years, the products of electric lifting platform vehicles have been continuously improved, and various new technologies and materials have emerged, making the further development of lifting platform vehicles possible.

Advantages of electric elevator rotary valve: Simplify the installation of electric elevator pipelines; The operation is more convenient, and the valve can be opened and closed at any time; The installation of a rotary valve reduces the friction of the sealing components; Compact structure, small size, and space saving; Increased the service life of electric elevator pipelines and solved the problem of easy oil leakage.


PapenderchtElectric three wheel elevatorWhat is the main cause of surface rust



Before operating the construction electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.

Free consultation.There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.

The down travel (limit) switch should be of the automatic reset type.

The net height of the landing door opening should not be less than 8m, and the difference between the net width and the outlet width of the cage door should not exceed 120mm. When the floor door is closed, except for the gap between the lower part of the door that should not exceed 35mm, the size of any through-hole and opening related to the distance between any door and adjacent moving parts, as well as the gap around the door or between parts, should comply with the provisions of Table 4 of 'Mechanical Safety - Safety Distance to Prevent Upper and Lower Limbs from Touching Dangerous Areas' GB23821-2009.

Papendercht.The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.

For customers to use and operate the lifting platform for a long time,PapenderchtElectric pillar elevator, the editor briefly introduces how to maintain and repair the lifting platform: First of all, normal maintenance is mainly focused on prevention, especially if any damage or malfunction is detected and corrected or repaired in a timely manner. Careful inspection and maintenance at this time can save costs and avoid larger problems, resulting in costly repairs.

Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends, it can automatically cut off the oil circuit and stop descent