JiningHigh altitude electric elevatorHow to improve the pumping efficiency

announcer:hp935HP175192871 release time:2024-04-19 12:42:04

The counterweight guide rail should meet the specification requirements.

Protective measures should comply with regulatory requirements.

Jining.The downward movement of the hydraulic cylinder (i.e. heavy object lowering). The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, and the return oil from the lower end of the hydraulic cylinder passes through the balance valve, hydraulic control one-way valve, energy-saving valve, and explosion-proof electric valve

When the landing door is closed, the full width of the lifting passage opening should be covered.

.Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.

During normal operation, the horizontal distance between the closed cage door and the closed landing door should not exceed 150mm. Otherwise, measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed 150mm.

When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above, effective protective measures should be taken.


JiningHigh altitude electric elevatorHow to improve the pumping efficiency



Protective measures should comply with regulatory requirements.

Before each shift of work, the safety devices of the construction electric elevator should be inspected to ensure sensitivity and reliability.

Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.

superior quality.For customers to use and operate the lifting platform for a long time, the editor briefly introduces how to maintain and repair the lifting platform: First of all, normal maintenance is mainly focused on prevention, especially if any damage or malfunction is detected and corrected or repaired in a timely manner. Careful inspection and maintenance at this time can save costs and avoid larger problems, resulting in costly repairs.

Work is essential, and the main protective accessories include safety belts, guardrails,JiningElectric lifting scissor lift, protective covers platforms and stairs,Jining6-meter electric elevator, etc.

The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.


JiningHigh altitude electric elevatorHow to improve the pumping efficiency



To meet the needs of stage craftsmanship and layout; Product; In the music and dance theater stage arranged in a zigzag pattern, auxiliary lifting platforms are often arranged in front, back, left, and right of the main stage lifting platform. The side and rear auxiliary lifting platforms are used for the smooth opening of the side platform and rear vehicle turntable, while the front auxiliary lifting platform is used to place the rear vehicle turntable near the platform entrance. The leveling lifting platform below the side platform and rear vehicle turntable can be used to level the platform after the side platform or rear vehicle turntable is driven out, so that the entire platform does not have a height difference, ensuring the safety of the cast members.

Potential development.The use of standard section connecting bolts should comply with the user manual and specification requirements.

The use of fully autonomous electric elevators can create more benefits and ensure safety in all aspects.

Setting requirements: The wall bracket should use the manufacturer's matching standard products.

Jining.Secondly, for the replacement of hydraulic oil on the lifting platform it is recommended to replace it every three months. If the frequency of use is not high, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space and ensure that the lifting platform can be lifted to the rated lifting height.

To meet the needs of choreographers and choreographers in different plays, in order to adapt to the requirements of the plot for the scenery or venue,JiningElectric elevator battery, and save manpower and material resources for setting up. By using the tilting device of the lifting platform to form a tilted platform, special atmosphere and effects can be created. Even simple stage machinery often participates in performance activities, creating unexpected atmosphere and effects according to the needs of the plot. For example, using the low-speed descent of the lifting platform to represent a sunken ship in the sea, using the valves on the lifting platform and the sudden disappearance and appearance of actors on the lifting platform.

Drivers of construction electric elevators should hold special construction operations and are not allowed to operate without a certificate.