FresnoElectric brick elevator on construction siteInternet marketing brings new opportunities for development

announcer:hp935HP175192871 release time:2024-04-19 10:30:13

Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.

It is reported that a fixed electric elevator has good lifting stability and can only be used for fixed operations, making high-altitude operations easier

Fresno.Installation position of upper limit switch: Under normal working conditions, the distance between the upper limit switch and the upper limit switch is 0.15m for SC type construction electric elevators, and 0.15m for SS type construction electric elevators (person)

There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.

.The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.

Setting requirements: The landing door should be standardized and tooled.

The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.


FresnoElectric brick elevator on construction siteInternet marketing brings new opportunities for development



Steel wire ropes, pulleys, and counterweight steel wire ropes shall comply with the following regulations: the characteristics of steel wire ropes shall comply with the requirements of General Purpose Steel Wire Ropes GB/T20118; Maintenance, wear, deformation, and corrosion of steel wire ropes

The body in the lateral adjustment device of the driving plate should ensure a compressed state, so that the gear has a certain radial constraint, and enters the lower end of the hydraulic cylinder through an oil filter, explosion-proof electromagnetic directional valve, throttle valve, hydraulic control one-way valve and balance valve, causing the hydraulic cylinder to move upwards and lift heavy objects. The return oil at the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve,FresnoUsed electric elevator, and its rated pressure overflow valve is adjusted. The pressure gauge observes the reading value on the pressure gauge. The downward movement of the hydraulic cylinder (i.e. lowering of heavy objects).

Analysis project.Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Terrace, Tower, Pavilion; Ideal props.

When the door is closed,FresnoElectric elevator 8 meters,FresnoElevator electric elevator, except for the gap between the lower part of the door that should not exceed 35mm any through-hole and opening size related to the distance between any door and adjacent moving parts, should comply with the provisions of Table 4 of GB 23821-2009.

Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value as well as the gap around the door or the gap between parts, the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature drops


FresnoElectric brick elevator on construction siteInternet marketing brings new opportunities for development



Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

Marketing Department.When the wall bracket cannot meet the requirements of the construction site, and a complete grease film surface is maintained between the curved surface of the roller and the main chord of the aluminum alloy electric elevator. A good grease film surface can reduce wear and noise

Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.

Fresno.The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances, when the net height of the building entrance is less than 0m, it is allowed to lower the height of the lower door opening, but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

To meet the needs of stage craftsmanship and layout; Product; In the music and dance theater stage arranged in a zigzag pattern, auxiliary lifting platforms are often arranged in front, back, left, and right of the main stage lifting platform. The side and rear auxiliary lifting platforms are used for the smooth opening of the side platform and rear vehicle turntable, while the front auxiliary lifting platform is used to place the rear vehicle turntable near the platform entrance. The leveling lifting platform below the side platform and rear vehicle turntable can be used to level the platform after the side platform or rear vehicle turntable is driven out, so that the entire platform does not have a height difference, ensuring the safety of the cast members.

Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.