BaodingElectric banner elevatorControl operation

announcer:hp935HP175192871 release time:2024-04-16 09:09:13

Acceptance: Concrete strength grade C30, strength testing report.

Every theater is a public place with a large number of people, and safety considerations should be taken into account in stage design. According to relevant national regulations, in order to prevent accidents caused by the crushing of electric elevators or improper control by drivers. Electric elevators should be equipped with the following necessary safety devices to ensure that the car of the electric elevator stops rising or falling in a timely manner.

Baoding.The cleanliness of the hydraulic station is an important aspect of the electric elevator hydraulic station, so it should not be taken lightly. And from a professional perspective, there are relevant rules and requirements that should be referred to in the specification manual, so as to have a correct understanding and know how to achieve good cleanliness.

The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.

.Emergency manual valve: In case of power failure, it can cause the car to descend to the nearest floor position and open the door

Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, as specified in the above table.

Equal effect.

Later, when there is a major malfunction of the lifting platform, it should be repaired by professional personnel as soon as possible. After the malfunction occurs, it should not be used again to avoid accidents, personnel and property losses.

Latest quotation.Setting requirements: The wall bracket should use the manufacturer's matching standard products.

The foundation base or embedded parts should be fully embedded in the concrete foundation plate.

The use of standard section connecting bolts should comply with the user manual and specification requirements.


BaodingElectric banner elevatorControl operation



From the perspective of the safety performance of the machinery itself, those that have undergone national safety certification will not have significant safety issues. The main problem is that after using the electric elevator for a period of time mechanical components may fall off or be damaged due to various factors. This problem depends on regular inspection and maintenance of the machinery

Test conclusion.In addition to ground protective fences, low level doors can be used. Low level doors should meet the following requirements: the height of the door should be between 1m and 2m. And there should be at least protective railings,BaodingMobile small electric elevator, a half height middle crossbar, and a toe board at least 150mm above the ground.

Check whether the sealing of components such as the oil cylinder, oil pipe, and motor of the aluminum alloy electric elevator is good and whether there is any air leakage.

Steel wire ropes, pulleys, and counterweight steel wire ropes shall comply with the following regulations: the characteristics of steel wire ropes shall comply with the requirements of General Purpose Steel Wire Ropes GB/T20118; Maintenance, wear, deformation, and corrosion of steel wire ropes

Baoding.Secondly, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level,BaodingMobile electric elevator,BaodingElectric cargo elevator, timely inspection of various functions is essential.

Construction electric elevators outside the lightning protection range

Principle of electric elevator rotary valve: When the electric elevator rises, the rotary valve will automatically open. To close the plug valve, it is necessary to first turn the handle to turn the plug to a 90 degree position until it is closed and then turn the transmission handwheel to lower the plug and achieve sealing.