HeimElectric small mobile elevatorThe quality has increased and the price has also increased

announcer:hp935HP175192871 release time:2024-03-22 11:33:53

Heim6-meter electric elevator,

During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed 50mm.

Later, when there is a major malfunction of the lifting platform, it should be repaired by professional personnel as soon as possible. After the malfunction occurs, it should not be used again to avoid accidents, personnel and property losses.

Heim.Degrees, m/s.

Stage equipment safety door. To prevent personnel from extending their heads, hands, its cabin should be full of doors, and the height of the hoistway (hall door) should not be less than 8 meters; The electric door opening and closing switches should be removed from the vertical and passenger compartment doors. In order to prevent accidents caused by vertical, passenger car doors, and car roof doors not being closed.; Door interlocks should be installed on both the vertical and passenger compartment doors.

.To meet the needs of choreographers and choreographers in different plays, different heights of the lifting platform can be used to change the shape of the stage according to the requirements of the choreographers and choreographers in order to adapt to the requirements of the plot for the scenery or venue, a better highlighting effect can be achieved in various performances. According to the needs of the plot, special atmosphere and effects can be created. Even simple stage machinery often participates in performance activities, using the low-speed descent of the lifting platform to represent a sunken ship in the sea, using the valves on the lifting platform and the sudden disappearance and appearance of actors on the lifting platform.

Setting requirements: The landing door should be standardized and tooled.

The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements, otherwise protective measures shall be taken.


HeimElectric small mobile elevatorThe quality has increased and the price has also increased



Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.

The working principle of the aluminum alloy lifting platform is that hydraulic oil is composed of a vane pump to form a certain pressure, which enters the lower end of the hydraulic cylinder through an oil filter, explosion-proof electromagnetic directional valve, throttle valve, hydraulic control one-way valve, and balance valve

The landing door should meet the requirements of the specifications and achieve standardization.

target.Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil,HeimWalking electric elevator, tighten the joint, remove the oil filter, clean it with compressed air and then return it to the oil tank and connect the pipeline.

During normal operation, the horizontal distance between the closed cage door and the closed landing door should not exceed 150mm. Otherwise,HeimElectric brick elevator on construction site, measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed 150mm.

Drivers of construction electric elevators should hold special construction operations and are not allowed to operate without a certificate.


HeimElectric small mobile elevatorThe quality has increased and the price has also increased



Protective measures should comply with regulatory requirements.

index.News Abstract: The development of the lifting platform industry will continue to grow in recent years! With the continuous development of electric lifting machinery for high-altitude operations in recent years, the products of electric lifting platform vehicles have been continuously improved, and various new technologies and materials have emerged, making the further development of lifting platform vehicles possible.

Stop the suspension cage.

Work is essential, and the main protective accessories include safety belts, guardrails, protective covers, platforms and stairs, etc.

Heim.High lifting height, using side mounted oil cylinders, stable operation, noise free, easy maintenance, and longer service life.

Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.

The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.