GroningenElectric hydraulic elevator 15 metersRecognized by customers

announcer:hp935HP175192871 release time:2024-03-21 12:25:01

small size and the valve can be opened and closed at any time; The installation of a rotary valve reduces the friction of the sealing components; Compact structure, and space saving; Increased the service life of electric elevator pipelines and solved the problem of easy oil leakage.

Groningen.Correct use can also greatly improve work efficiency. So how should it be used?

The use of a lifting platform as a tool for storing performance blankets, soft scenery, etc. In some theaters, there is a soft scenery storage lifting platform located at an appropriate location on the stage for the storage of blankets, soft scenery, etc.

.Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.

Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.

Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.


GroningenElectric hydraulic elevator 15 metersRecognized by customers



To meet the needs of choreographers and choreographers in different plays, different heights of the lifting platform can be used to change the shape of the stage according to the requirements of the choreographers and choreographers, in order to adapt to the requirements of the plot for the scenery or venue,GroningenLEGO Electric Elevator, a better highlighting effect can be achieved in various performances. According to the needs of the plot,GroningenElectric hydraulic platform elevator, special atmosphere and effects can be created. Even simple stage machinery often participates in performance activities, creating unexpected atmosphere and effects according to the needs of the plot. For example, using the low-speed descent of the lifting platform to represent a sunken ship in the sea, using the valves on the lifting platform and the sudden disappearance and appearance of actors on the lifting platform.

After the limit switch is activated, only professional personnel can restore the movement of the suspension cage; Limit switches and travel switches should not share the same triggering element; Limit switches should be either suspended or

Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark sticky, or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.

superior quality.Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.

The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.

Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position


GroningenElectric hydraulic elevator 15 metersRecognized by customers



The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

Trustworthy.According to the needs of different performance genres, the form of the stage can be changed. For example using an orchestra pit lift can combine a framed stage with a large lip or even an extended stage. In an experimental theater, using a lift can make the theater have various forms such as an end stage, an extended stage, an island stage, an intermediate stage, a T-shaped stage, or a hall.

It is strictly prohibited to use travel limit switches as switches to stop operation.

When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above, effective protective measures should be taken.

Groningen.The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, and the return oil from the lower end of the hydraulic cylinder returns to the oil tank through the balance valve, hydraulic control one-way valve, throttle valve, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the descent speed does not change due to heavy objects. The throttle valve regulates the flow rate and the ascending and descending speed.

The counterweight guide rail should meet the specification requirements.

Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.