the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.

To meet the needs of stage craftsmanship and layout; Product; In the music and dance theater stage arranged in a zigzag pattern

Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, auxiliary lifting platforms are often arranged in front, back,KetaiSecond floor electric elevator, left,Ketai6 meter high electric elevator, and right of the main stage lifting platform. The side and rear auxiliary lifting platforms are used for the smooth opening of the side platform and rear vehicle turntable, while the front auxiliary lifting platform is used to place the rear vehicle turntable near the platform entrance. The leveling lifting platform below the side platform and rear vehicle turntable can be used to level the platform after the side platform or rear vehicle turntable is driven out, so that the entire platform does not have a height difference, ensuring the safety of the cast members.

Ketai.The use of fully autonomous electric elevators can create more benefits and ensure safety in all aspects.

The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.

.Secondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, timely inspection of various functions is essential.

When the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than 150mm and there is no effective protection from other structures, the side protection device for the landing entrance should be equipped.

Protective measures should comply with regulatory requirements.


Ketai15 meter electric elevatorPrecautions during maintenance



Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value, the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature drops

. The shutdown device (emergency stop switch) should be installed outside the ground protective fence; b) Pulley room (if any. Pulley room refers to a room where only pulleys or speed limiters and electrical equipment are installed; c) hanging cage top, if

Manual pump: When the system malfunctions the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position

OK or not?.Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.

The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.

Double layer steel mesh: The diameter of the steel bars is 12mm, with a spacing of 200mm.


Ketai15 meter electric elevatorPrecautions during maintenance



The foundation production and acceptance of electric elevators for foundation construction should comply with the user manual and regulatory requirements.

install.The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area, improving the utilization rate of the wellbore area.

And the decoration team is also using aluminum alloy electric elevators. What safety considerations should we consider during the use process? Many manufacturers have not clearly indicated it. Today, the mechanical editor will talk to you about aluminum alloys

When a rigid 5000mm2 square or circular flat surface is applied with a normal force of 600N to either side of the door, the door may not meet the above requirements, but safety should be maintained.

Ketai.To ensure safe and reliable braking of the lifting platform and prevent accidents, a hydraulic control one-way valve, also known as a hydraulic lock, is added to ensure safe self-locking in the event of an accidental rupture of the hydraulic pipeline. An overload sound control alarm has been installed to distinguish between overload or equipment failure. Electrical system explosion-proof button SB1&flash; The rotation of the SB6 motor and the commutation of the explosion-proof electromagnetic directional valve are used to maintain load increase or decrease, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

To meet the needs of choreographers and choreographers in different plays,KetaiElectric wire rope elevator, different heights of the lifting platform can be used to change the shape of the stage according to the requirements of the choreographers and choreographers, in order to adapt to the requirements of the plot for the scenery or venue, and save manpower and material resources for setting up. By using the tilting device of the lifting platform to form a tilted platform, a better highlighting effect can be achieved in various performances. According to the needs of the plot, special atmosphere and effects can be created. Even simple stage machinery often participates in performance activities, creating unexpected atmosphere and effects according to the needs of the plot. For example, using the low-speed descent of the lifting platform to represent a sunken ship in the sea