Trani Self propelled electric elevatorResponse to problems

announcer:hp935HP175192871 release time:2024-03-02 14:24:08

Trani Electric pulley elevator,

Before operating the construction electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.

Setting requirements: The wall bracket should use the manufacturer's matching standard products.

Trani .And prevent it from starting normally. There should be no device that allows users to cancel warning signals.

High lifting height,Trani Electric passenger lift, using side mounted oil cylinders, stable operation, noise free, easy maintenance, and longer service life.

.The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.

To meet the needs of choreographers and choreographers in different plays, different heights of the lifting platform can be used to change the shape of the stage according to the requirements of the choreographers and choreographers, in order to adapt to the requirements of the plot for the scenery or venue, and save manpower and material resources for setting up. By using the tilting device of the lifting platform to form a tilted platform, a better highlighting effect can be achieved in various performances. According to the needs of the plot, special atmosphere and effects can be created. Even simple stage machinery often participates in performance activities, creating unexpected atmosphere and effects according to the needs of the plot. For example, using the low-speed descent of the lifting platform to represent a sunken ship in the sea using the valves on the lifting platform and the sudden disappearance and appearance of actors on the lifting platform.

During normal operation, the horizontal distance between the closed cage door and the closed landing door should not exceed 150mm. Otherwise, measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed 150mm.


Trani Self propelled electric elevatorResponse to problems



High lifting height,Trani Platform electric elevator, using side mounted oil cylinders, stable operation, noise free, and longer service life.

When a suspension cage with a rated load capacity acts on the buffer at a speed greater than the rated speed of 0.2m/s, the average deceleration of the suspension cage should not exceed 1g, and the time when the peak deceleration exceeds 5g should not exceed

Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.

Customer first.From the above comparison, it can be seen that hydraulic electric lifting mechanisms have stable lifting low noise, long service life, large load bearing capacity, and are relatively simple, making them suitable for use in stage equipment.

The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of 8 meters by 2 meters.

To meet the needs of choreographers and choreographers in different plays, different heights of the lifting platform can be used to change the shape of the stage according to the requirements of the choreographers and choreographers, in order to adapt to the requirements of the plot for the scenery or venue, and save manpower and material resources for setting up. By using the tilting device of the lifting platform to form a tilted platform, creating unexpected atmosphere and effects according to the needs of the plot. For example special atmosphere and effects can be created. Even simple stage machinery often participates in performance activities, using the low-speed descent of the lifting platform to represent a sunken ship in the sea, using the valves on the lifting platform and the sudden disappearance and appearance of actors on the lifting platform.


Trani Self propelled electric elevatorResponse to problems



In addition to ground protective fences, low level doors can be used. Low level doors should meet the following requirements: the height of the door should be between 1m and 2m. And there should be at least protective railings, and a toe board at least 150mm above the ground.

system.Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

Greater than 0.04s; When the hydraulic buffer is used, the oil level shall be checked, and the action of the hydraulic buffer shall be monitored by the Electrical safety switch. When the hydraulic buffer is compressed, the cage shall not

Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.

Trani .Later, when there is a major malfunction of the lifting platform, it should be repaired by professional personnel as soon as possible. After the malfunction occurs, it should not be used again to avoid accidents, personnel and property losses.

The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.

Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.