EssenPlatform electric elevatorThree basic points of homework

announcer:hp935HP175192871 release time:2024-01-31 09:35:30

EssenElectric folding elevator,

When the landing door is closed, the full width of the lifting passage opening should be covered.

Human improper operation is the main factor causing malfunctions in scissor type electric elevators. When stacking goods, electric elevators should stack the goods neatly, which is better than stacking them in the center of the cargo stacking area of the cargo elevator to avoid imbalance between the two ends of the stacking area. Eventually during the operation of the electric elevator, it may cause the electric elevator to lose balance. After the goods are stacked completely, ropes should be used to lock the goods so that they are not afraid of the goods during the lifting process; Careless; Scattered down

Essen.When using lifting equipment, the workbench should be kept in a horizontal state.

Setting requirements: For construction electric elevators with foundations installed on roof slabs, or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.

.The pump body adopts an integrated pump station, all equipped with imported high-quality pump stations, which can also be selected according to customer requirements to meet customer ideal requirements.

The landing door should meet the requirements of the specifications and achieve standardization.

Before installation,EssenElectric elevator mechanism, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.


EssenPlatform electric elevatorThree basic points of homework



According to the needs of different performance genres, the form of the stage can be changed. For example, using an orchestra pit lift can combine a framed stage with a large lip or even an extended stage. In an experimental theater, using a lift can make the theater have various forms such as an end stage, an extended stage, an island stage, an intermediate stage, a T-shaped stage, or a hall.

There is a certain itinerary.

Protective measures should comply with regulatory requirements.

Production department.The advantages and disadvantages of several commonly used electric lifting mechanisms are as follows: hydraulic electric lifting mechanisms: using hydraulic technology, smooth lifting and low noise.

The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, soft scenery, etc. In some theaters, there is a soft scenery storage lifting platform located at an appropriate location on the stage for the storage of blankets, soft scenery, etc.


EssenPlatform electric elevatorThree basic points of homework



The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

For more,EssenElectric bed elevator, please check.The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

Lower limit switch: In normal working state, before the suspension cage touches the buffer, the lower limit switch first acts.

Implementing multiple shifts of homework should fill in and submit records according to regulations.

Essen.During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed 50mm.

The safety distance between the outer edge of the upper part of the landing door and the moving parts of the electric elevator during normal operation should not be less than 0.75m; If the rated speed is not greater than 0.7m/s, the safety distance can be 0.40m.

The foundation production and acceptance of electric elevators for foundation construction should comply with the user manual and regulatory requirements.