GaobeidianFixed electric elevatorHow to promote the development

announcer:hp935HP175192871 release time:2024-01-28 19:22:11

Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.

The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.

Gaobeidian.Precautions for safe use of electric elevators: Before use, remove any obstacles or debris near the electric elevator that may hinder operation, and check whether the operating handle can be used normally.

Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.

.Safety performance: Electric elevators not only have the safety device of traditional traction elevators, but also have an overflow valve to prevent excessive system pressure during upward movement

When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above, effective protective measures should be taken.

Once again,GaobeidianElectric elevator for balcony, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.


GaobeidianFixed electric elevatorHow to promote the development



Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.

In addition, when adding hydraulic oil, it is necessary to ensure the quality of the hydraulic oil, as some hydraulic oil manufacturers will choose hydraulic oil with poor quality. Hydraulic oil such as hydraulic lifting platforms not only cannot have any effect on folding arm elevators, but also affects the working efficiency of folding arm electric elevators due to deterioration issues.

The scissor type electric elevator is a widely used high-altitude operation special equipment. Its scissor mechanical structure ensures high stability of the lifting platform, wide working platform, and high bearing capacity, making the high-altitude operation range wider and suitable for multiple people to work simultaneously. It makes high-altitude operation more efficient and safer

Installation materials.Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts it is advisable to place the screw at the bottom and the nut at the top.

Horizontal lead screw mechanical electricity

In order to meet the needs of contemporary audiences and achieve perfect effects, stage machinery is particularly important on the stage. On the stage,Gaobeidian2 meter electric elevator, there are suspension rods, suspension points, lighting bridges, lighting suspension cages, and fire curtains. Under the stage, there are lifting platforms, car platforms, turntables, and lifting orchestras. Some lifting platforms are equipped with turntables, or there are lifting platforms in the turntables. Various types of lifting platforms are equipped in professional opera houses dance theaters, drama theaters, and many internationally renowned music halls. It has the functions of quickly changing scenery, meeting the needs of stage craft layout,GaobeidianElectric three wheel elevator, meeting the needs of stage design and choreographers, creating special atmosphere and effects, and changing the stage form according to the needs of the performance.


GaobeidianFixed electric elevatorHow to promote the development



The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.

Welcome calls .Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position

Correct use can also greatly improve work efficiency. So how should it be used?

Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, intermediate shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.

After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.