Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.

The counterweight guide rail should meet the specification requirements.

Heidelberg.Before each shift of work, the safety devices of the construction electric elevator should be inspected to ensure sensitivity and reliability.

When the wall bracket adopts non matching standard products, design calculations should be carried out.

.Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value,HeidelbergElectric portable elevator, the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature drops

When the wall bracket adopts non matching standard products design calculations should be carried out.

The L distance depends on the selected wall mount model.


HeidelbergElectric elevator 6 metersHow to take measures for large-scale enterprises



The foundation base or embedded parts should be fully embedded in the concrete foundation plate.

The inner bearing of the roller in the device is in good condition, and a complete grease film surface is maintained between the curved surface of the roller and the main chord of the aluminum alloy electric elevator. A good grease film surface can reduce wear and noise

When the wall bracket adopts non matching standard products, it should be designed and calculated separately.

Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil,HeidelbergExternal wall electric elevator, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.

Setting requirements: The landing door should be standardized and tooled.


HeidelbergElectric elevator 6 metersHow to take measures for large-scale enterprises



When the foundation is set on the roof or floor structure,HeidelbergElectric light lift, the bearing capacity of its supporting structure should be checked.

Executive standard.The foundation production and acceptance of electric elevators for foundation construction should comply with the user manual and regulatory requirements.

Pole

Speed limiter. To prevent the driving speed from exceeding the normal speed. A speedometer should be installed (not required for floors below or including the second floor), which is an individual mechanism that is integrated with a safety clamp; The entrance and exit of the passenger compartment should be equipped with safety doors. Public places, family dormitories, and

Heidelberg.During normal operation, the horizontal distance between the closed cage door and the closed landing door should not exceed 150mm. Otherwise, measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed 150mm.

Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

Chain type electric lifting mechanism: With a good guiding mechanism, it can ensure that the equipment does not tilt during operation. Gear and rack electric lifting mechanism: precise transmission and high cost.