HildesheimTwo ton lifting cargo elevatorThe regional economic development is generally stable

announcer:hp779HP136589660 release time:2023-12-31 12:24:43

The water cooling of hydraulic stations is generally tubular water cooling, and the type selection is based on the heat load to calculate the heat exchange area, while the air-cooled elevator is conducted using an air cooler, and the heat exchange capacity is calculated based on the heat load. Then, the type selection calculation is performed when the flow can be satisfied. Therefore, the two types of cooling are different and there are significant differences. Long-term lifting and lowering of cargo elevator factory

Characteristics of hydraulic elevators: Hydraulic lifting platform products are divided into curved arm type hydraulic lifting machines, mast type hydraulic lifts, and straight arm type hydraulic lifts according to their working modes. Hydraulic elevator is a replacement product of folding arm elevator (lifting platform) and scissor fork elevator (lifting platform). It can be widely used for the decoration and decoration of stations,HildesheimHeavy industry guide rail type cargo elevator, docks, airports, hotels, posts and telecommunications, municipal gardens, garages, cleaning companies, public building facades, or the installation and maintenance of power systems, etc. This elevator has the advantages of light weight, self-propelled walking, electric starting, self supporting legs, simple operation, large working area,HildesheimSecond floor cargo elevator, and especially the ability to cross obstacles for aerial work.

Hildesheim.Avoid, especially during storage. Store in a cool and dry place and avoid rainy and snowy weather during work.

Walking: assisted self-propelled, two wheel traction, self driving, and car modification.

.In addition, it is strictly prohibited to use a hammer during installation to prevent excessive axial or radial force from damaging the bearings or gears. Be sure to tighten the mounting bolts before tightening the tension bolts. Before installation, positioning boss, and elevator connection parts with gasoline or zinc sodium water. Its purpose is to ensure the tightness of the connection and the flexibility of operation, and to prevent unnecessary wear and tear.

Outriggers: mechanical outriggers, hydraulic outriggers, ordinary hand cranking outriggers, and pull-out outriggers.

It is good for aerial work vehicles not to cover their clothes and park outside. If it is windy and rainy, the clothes will repeatedly slap the car paint, especially if the vehicle blows sand on the clothes, causing many fine scratches on them, as the paint will become black over time. In addition, when the wind does not directly spray powder or clean the mechanism on the sand, it should be washed with water, and prevent the vacuum cleaner of the aerial work vehicle from scratching the sand particles on the paint surface.


HildesheimTwo ton lifting cargo elevatorThe regional economic development is generally stable



For guideway elevators installed outdoors, they are often exposed to rain and sunlight, so special attention should be paid to regular maintenance and inspection to avoid accidents.

If the hydraulic valve is damaged, its effectiveness should be maintained. If it is damaged, when purchasing a lifting platform the cost is much lower. Therefore, frequency of work, load, and other factors of the lifting platform to select a lifting platform suitable for the work requirements.

device management.Test the goods elevator every day to see if it can operate normally.

Many people believe that the mechanical strength of the elevator itself is relatively high when using the elevator so the installation method specified in the manual is not strictly followed during the installation process. However, this can lead to increased wear of parts and inflexibility in operation. In addition, it is necessary to pay attention to the installation precautions corresponding to the working environment and not be careless. Correct installation, use, and maintenance of the elevator are important steps to ensure the normal operation of mechanical equipment. Therefore, when installing the elevator, please be sure to carefully assemble and use it in strict accordance with the following installation and use related matters.

Unscrew the screws on the dustproof hole on the outer side of the elevator flange, adjust the PCS system ring to align its side hole with the dustproof hole, and tighten with the hexagon socket. After that, remove the motor shaft key.


HildesheimTwo ton lifting cargo elevatorThe regional economic development is generally stable



Safety performance: The lifting structure is made of high-strength manganese steel rectangular tubes, with a scissors type mechanical mechanism, easy to maintain, strong stability, and high bearing capacity. The lifting height is about 10 meters, and the load capacity is about 10 tons.

where.Different. (Specific bearing capacity and lifting height can be designed and customized according to user requirements)

Drain and discard the hydraulic oil from the hydraulic lifting cargo elevator. For the outdoor guide rail elevator, tighten the joint and remove the oil filter. After cleaning, clean it with compressed air, and then return it to the oil tank and connect the pipeline.

What is the new price for fixed elevators? Professional improvement of the quality assurance of the elevator factory. Preferential activities are ongoing, welcome new and old customers to consult

Hildesheim.Scissor type fixed lifting platform is a transportation and loading equipment that transports goods from one height to another. After operation, the platform is level with the ground,HildesheimEnterprise elevator, without occupying ground space and affecting passage passage.

Connect the motor to the elevator naturally. During connection, and that the outer flanges of the two are parallel. Inconsistent centering can cause the motor shaft to break or the elevator gear to wear.

Before connecting the motor to the elevator, the elevator manufacturer should first make the motor shaft keyway perpendicular to the tightening bolt. To ensure uniform stress, first screw on the mounting bolts at any diagonal position, but do not tighten them. Then screw on the other two mounting bolts at diagonal positions, and then tighten the four mounting bolts one by one. After that, tighten the tightening bolts. All tightening bolts shall be fixed with a torque wrench according to the indicated fixed torque data, and the use of elevators and lifting platforms shall be checked