Donghe River2 ton lifting cargo elevatorGood service

announcer:hp779HP136589660 release time:2023-11-06 12:52:51

The brake operators of each mechanism on the equipment should regularly check and adjust the clearance of the brake shoe and brake wheel, ensuring flexibility and reliability. Long term improvement of the elevator factory, a 20 year old brand with competitive prices and guaranteed quality!

To ensure excellent power supply at the installation site, install a separate distribution box. When using the distribution box, the electrical leakage switch must meet the requirements for construction elevators. If the installed construction elevator is variable frequency, the selection of the leakage switch should be compatible with the frequency converter.

Donghe River.If the hydraulic valve is damaged, its effectiveness should be maintained. If it is damaged, it can be replaced in a timely manner.

In addition it is strictly prohibited to use a hammer during installation to prevent excessive axial or radial force from damaging the bearings or gears. Be sure to tighten the mounting bolts before tightening the tension bolts. Before installation, clean the anti rust oil on the motor input shaft, positioning boss, and to prevent unnecessary wear and tear.

.Regardless of whether it is used outdoors or indoors, it is inevitable that some small problems will occur after a long period of time. At this time, what we should do is to maintain and maintain the elevator. How to follow the steps correctly becomes a difficult problem. Let me explain it to you.

Large logistics warehousing equipment service company with guaranteed prices and guaranteed services, directly operated by the manufacturer. Because fixed elevators are mechanical equipment, the quality and performance of the product are good. Do not accept products from some manufacturers that do not meet the quality standards, in order to avoid some safety hazards in use.

Motor connection error. When the triangular connection motor is mistakenly connected into a star shape, the motor still operates with full load, and the current flowing through the stator winding exceeds the rated current, leading to the motor stopping itself. If the stopping time is slightly longer and the power supply is not cut off, the winding will not only be severely overheated, but also burned. When a star connected motor is mistakenly connected into a triangle, or when several coil groups are connected in series into a single branch, the motor is mistakenly connected into two branches in parallel, both the windings and the iron core will overheat, and in severe cases, the windings will be burned.


Donghe River2 ton lifting cargo elevatorGood service



After the goods are transported,Donghe RiverThe elevator is good, clean the platform.

Many times, when ordering a large lifting platform, after the customer has determined the parameters, the designer will first consider various factors before designing, including the size during transportation, it is necessary to consider separate assembly or table split to meet the requirements. At the same time during design and manufacturing, it is also necessary to consider the bearing capacity of the split,Donghe RiverTwo story cargo elevator, design and manufacture on the premise of ensuring the load capacity and stability, and ensure that the equipment can be easily transported, lifted, single-phase or three-phase power supply, diesel engine.

How much is it.Outriggers: mechanical outriggers, hydraulic outriggers, ordinary hand cranking outriggers, and pull-out outriggers.

The cleanliness of the hydraulic station is an important aspect of the elevator hydraulic station, so it should not be taken lightly. Moreover, from a professional perspective there are relevant rules and requirements. You should refer to the specification manual, so that you can have a correct understanding and know how to achieve better cleanliness.

The water cooling of hydraulic stations is generally tubular water cooling, and the type selection is based on the heat load to calculate the heat exchange area, while the air-cooled elevator is conducted using an air cooler, and the heat exchange capacity is calculated based on the heat load. Then, the type selection calculation is performed when the flow can be satisfied. Therefore, the two types of cooling are different, and there are significant differences. Long-term lifting and lowering of cargo elevator factory


Donghe River2 ton lifting cargo elevatorGood service



To ensure excellent power supply at the installation site, install a separate distribution box. When using the distribution box the electrical leakage switch must meet the requirements for construction elevators. If the installed construction elevator is variable frequency, the selection of the leakage switch should be compatible with the frequency converter.

Quotation sheet.When a cargo elevator fails, the four legs should be firmly supported on a solid ground (subject to the fact that the walking wheel is about to leave the ground). Sleepers can be used when necessary.

Is the water cooling and air cooling of the hydraulic station the same?

Donghe River.Several types: motor winding open circuit. When one phase of the motor winding is open circuit, or one of the parallel branches is open circuit, it will cause three-phase current imbalance and cause the motor to overheat.

After the goods are transported, clean the platform.

Safety performance: The lifting structure is made of high-strength manganese steel rectangular tubes, with a scissors type mechanical mechanism, easy to maintain, strong stability, and high bearing capacity. The lifting height is about 10 meters, and the load capacity is about 10 tons.