PittsburghWarehouse elevatorGloss

announcer:hp779HP136589660 release time:2024-05-20 16:32:00

Before connecting the motor to the elevator, the elevator manufacturer should first make the motor shaft keyway perpendicular to the tightening bolt. To ensure uniform stress, first screw on the mounting bolts at any diagonal position, but do not tighten them. Then screw on the other two mounting bolts at diagonal positions, and then tighten the four mounting bolts one by one. After that, tighten the tightening bolts. All tightening bolts shall be fixed with a torque wrench according to the indicated fixed torque data, this product can be said to be sold well in China, because many places need to use this kind of product with lifting function and flexible movement. Now, companies specializing in producing this type of product combine with extensive external publicity on the Internet, Friends in need can directly find the corresponding company on the Internet, and then have a brief understanding of the model, performance, and price information of these products. They can purchase directly through the Internet.

Pittsburgh.Make sure to add butter twice a month to the transmission assembly where the grease fitting is located. For parts where butter cannot be added, it is necessary to dredge the oil circuit or replace the grease fitting until butter can be added, otherwise it is prohibited to use the equipment.

Goods should be stacked well on the platform, and should not be tilted. When the goods elevator is lifting or lowering beyond the scope of the platform, no one should stand around to watch.

.Secondly, there should be no dirt on the friction surface. If there is any dirt, it should be washed off with gasoline or thinner; The reduction gearbox, gearbox, external meshing gear, and other parts of the equipment, as well as the hydraulic oil, must be tested according to the requirements in the table; Correct maintenance of the hydraulic guide rail elevator: Regularly inspect the wire ropes at various parts for broken wires and looseness. If any such phenomenon is found, replace it in a timely manner. The maintenance of the wire ropes must be carried out in strict accordance with the specifications; Check the connection condition of each part according to the braking rules and regulations. If there is any looseness tighten it in a timely manner. Check the tightness of the connecting bolts of the equipment when the body is under pressure. All connecting shafts should be equipped with cotter pins; Check whether the operation of each mechanism is normal, whether there are noises and faults according to regulations, and promptly remove all faults; When installing,PittsburghGuide rail type lifting cargo elevator, disassembling, and adjusting the rotating mechanism of the equipment, it is important to note that the reducer and the gear center line should be parallel, and the meshing clearance should be appropriate; Regularly conduct a comprehensive inspection of the equipment to see if there is any damage to the wires and cables, and if there is overheating of the motor. Replace the motor in a timely manner and eliminate the fault before continuing operation; Ensure that the bearings, distribution boxes, and brushes of the motor are kept clean, and that the travel switch points of each safety device must be safe and reliable.

Several types: motor winding open circuit. When one phase of the motor winding is open circuit, or one of the parallel branches is open circuit, it will cause three-phase current imbalance and cause the motor to overheat.

Connect the motor to the elevator naturally. During connection, it must be ensured that the concentricity of the elevator output shaft and the motor input shaft is consistent, and that the outer flanges of the two are parallel. Inconsistent centering can cause the motor shaft to break or the elevator gear to wear.


PittsburghWarehouse elevatorGloss



In addition it is strictly prohibited to use a hammer during installation to prevent excessive axial or radial force from damaging the bearings or gears. Be sure to tighten the mounting bolts before tightening the tension bolts. Before installation, clean the anti rust oil on the motor input shaft, positioning boss, and elevator connection parts with gasoline or zinc sodium water. Its purpose is to ensure the tightness of the connection and the flexibility of operation, and to prevent unnecessary wear and tear.

Purpose of manual hydraulic platform: The manual hydraulic transportation platform has novel design, reasonable structure, and convenient use. Suitable for loading, unloading, transporting, and stacking barrels in factories, workshops,Pittsburgh2 ton cargo elevator, warehouses, stack them, and cooperate with hydraulic drum trucks. It can greatly improve work efficiency and reduce labor intensity. It can also be modified for loading and unloading and lifting heavy objects. It is a new and ideal multi-purpose lowering and unloading machine.

Low cost: Compared to the scissor type mobile lifting platform, the cost is much lower. Therefore, when purchasing a lifting platform, it is necessary to consider the use range, frequency of work, load, and other factors of the lifting platform to select a lifting platform suitable for the work requirements.

middleman.The cleanliness of the hydraulic station is an important aspect of the elevator hydraulic station, so it should not be taken lightly. Moreover, from a professional perspective, there are relevant rules and requirements. You should refer to the specification manual, so that you can have a correct understanding and know how to achieve better cleanliness.

Scissor type fixed lifting platform is a transportation and loading equipment that transports goods from one height to another. After operation, the platform is level with the ground, without occupying ground space and affecting passage passage.

The cleanliness of the hydraulic station is an important aspect of the elevator hydraulic station, so it should not be taken lightly. Moreover, from a professional perspective there are relevant rules and requirements. You should refer to the specification manual,Pittsburgh3 ton fixed lifting cargo elevator, so that you can have a correct understanding and know how to achieve better cleanliness.


PittsburghWarehouse elevatorGloss



Scissor type fixed lifting platform is a transportation and loading equipment that transports goods from one height to another. After operation, the platform is level with the ground, without occupying ground space and affecting passage passage.

Meticulous workmanship.Safety performance: The lifting structure is made of high-strength manganese steel rectangular tubes, with a scissors type mechanical mechanism, easy to maintain, strong stability, and high bearing capacity. The lifting height is about 10 meters, and the load capacity is about 10 tons.

How to install and use the bearings of the elevator During the process of installing the bearing device of the elevator, we cannot always ensure that the bearing device has the correct orientation, which inevitably leads to some devices not in place or bearing misalignment. Once these problems occur in the device, the clearance between the bearings becomes too small, when installing bearings, and in the future, it is also necessary to use a detector to test the bearing device, so as to ensure the success of the bearing device.

Precautions for elevator installation: Keep the access road of external construction elevators smooth and have sufficient space for parking equipment. When using a steam crane for auxiliary installation full consideration should be given to whether the on-site environment meets the operating conditions of the steam crane.

Pittsburgh.The water cooling of hydraulic stations is generally tubular water cooling, while the air-cooled elevator is conducted using an air cooler, and the heat exchange capacity is calculated based on the heat load. Then, the type selection calculation is performed when the flow can be satisfied. Therefore the two types of cooling are different, and there are significant differences. Long-term lifting and lowering of cargo elevator factory

'Using the elevator is not about maintaining and overhauling the equipment after it has failed. It is important to maintain the equipment in accordance with the correct maintenance and overhaul. First, do the preparatory work to eliminate all possible fault problems and accidents. I hope that today's summary of knowledge points by the editor can help everyone.'.

Prepare the foundation according to the foundation plan, pay attention to alignment, leveling, and alignment, and ensure the level of the foundation and various usage requirements.