GleevecGuide rail type simple lifting cargo elevatorHow to play a practical role

announcer:hp779HP136589660 release time:2024-04-24 09:34:20

What is the new price of fixed elevators? Fixed elevators are currently very popular in the market. Due to different manufacturers, different materials, different load ratings, and different brand awareness, the prices also vary. Currently, the prices of fixed elevators produced in the domestic market are: rated load 1-5 tons, lifting height 7 meters, table size 2500 mm * 2000 mm, and the price is around 27000-45000 yuan; The rated load is 1-3 tons, the lifting height is 0 meters, the table size is 2300 mm * 2000 mm, and the price is around yuan. Rated load and lifting height of each fixed elevator,

Test the goods elevator every day to see if it can operate normally.

Gleevec.Small pneumatic or electric derusting, which uses the principle of friction generated by air compression or electromagnetic effects to polish and remove rust on the surface of a spiral elevator, can be used for precision instrument push rods or for enterprises that require micro operation of spiral elevators.

Before connecting the motor to the elevator, the elevator manufacturer should first make the motor shaft keyway perpendicular to the tightening bolt. To ensure uniform stress first screw on the mounting bolts at any diagonal position, but do not tighten them. Then screw on the other two mounting bolts at diagonal positions, tighten the tightening bolts. All tightening bolts shall be fixed with a torque wrench according to the indicated fixed torque data, and the use of elevators and lifting platforms shall be checked

.Motor connection error. When the triangular connection motor is mistakenly connected into a star shape, the motor still operates with full load, and the current flowing through the stator winding exceeds the rated current, leading to the motor stopping itself. If the stopping time is slightly longer and the power supply is not cut off, the winding will not only be severely overheated, but also burned. When a star connected motor is mistakenly connected into a triangle, or when several coil groups are connected in series into a single branch, the motor is mistakenly connected into two branches in parallel, both the windings and the iron core will overheat, and in severe cases, the windings will be burned.

When a cargo elevator fails, it should be repaired by professional personnel. It is not allowed to modify the cargo elevator without permission.

Safety performance: The lifting structure is made of high-strength manganese steel rectangular tubes, with a scissors type mechanical mechanism,Gleevec1 ton lifting 8-meter cargo elevator, easy to maintain, strong stability, and high bearing capacity. The lifting height is about 10 meters, and the load capacity is about 10 tons.


GleevecGuide rail type simple lifting cargo elevatorHow to play a practical role



Walking: assisted self-propelled two wheel traction, self driving, and car modification.

Small pneumatic or electric derusting, can be used for precision instrument push rods or for enterprises that require micro operation of spiral elevators.

Systems: explosion-proof electronic control system, remote control system, PIC system.

Design brand.To ensure excellent power supply at the installation site, install a separate distribution box. When using the distribution box the electrical leakage switch must meet the requirements for construction elevators. If the installed construction elevator is variable frequency, the selection of the leakage switch should be compatible with the frequency converter.

What types of elevators are there? There are many types of such equipment, such as fixed lifting devices and vehicular lifting devices, depending on the form of movement. The so-called fixed lifting is generally installed in one place and fixed, and then put them into production on the production line. A special lifting device needs to be fixed at a certain position on the production line.

Unscrew the screws on the dustproof hole on the outer side of the elevator flange and some large production lines need to lift the materials to a certain position when loading them, adjust the PCS system ring to align its side hole with the dustproof hole, and tighten with the hexagon socket. After that, remove the motor shaft key.


GleevecGuide rail type simple lifting cargo elevatorHow to play a practical role



Safety performance: The lifting structure is made of high-strength manganese steel rectangular tubes, with a scissors type mechanical mechanism, easy to maintain,GleevecCargo elevator, strong stability, and the load capacity is about 10 tons.

original.'Using the elevator is not about maintaining and overhauling the equipment after it has failed. It is important to maintain the equipment in accordance with the correct maintenance and overhaul. First,Gleevec2 ton cargo elevator, do the preparatory work to eliminate all possible fault problems and accidents. I hope that today's summary of knowledge points by the editor can help everyone.'.

The daily maintenance of guide rail type lifting equipment should pay attention to regular inspection and maintenance, eliminate hidden dangers, and eliminate faults. Doing so is beneficial to improving work efficiency, extending the service life of the equipment, and ensuring the safety performance of the elevator.

Outriggers: mechanical outriggers, hydraulic outriggers, ordinary hand cranking outriggers, and pull-out outriggers.

Gleevec.When a cargo elevator fails, it should be repaired by professional personnel. It is not allowed to modify the cargo elevator without permission.

Before installing the elevator, confirm whether the motor and the elevator are intact, and strictly check whether the dimensions of each part connecting the motor and the elevator match. Here are the dimensions and fit tolerances of the positioning boss, input shaft, and elevator groove of the motor.

The hydraulic lifting platform mainly uses hydraulic oil pressure transmission to achieve the lifting function. Its shear fork mechanical structure provides stability for the lift. The wide working platform and high bearing capacity make the high-altitude operation range wide and suitable for multiple people to work simultaneously. It makes aerial work efficient and guaranteed.