NejackMobile boarding bridgeNormalizing

announcer:hp275HP127226562 release time:2024-05-24 13:28:57

Drivers should be responsible for supervising the uniform distribution of items transported by the platform on the platform as much as possible to prevent partial loading and prohibit overloading. flat

The second method is the protective layer method,NejackSelf propelled curved arm lifting platform, which covers the metal surface of the aluminum alloy lifting platform with a protective layer to isolate the metal products from the surrounding corrosive medium and prevent corrosion. Apply engine oil, petroleum jelly, paint, or cover the surface of steel parts with corrosion-resistant non-metallic materials such as enamel and plastic; Using electroplating, hot plating, spray plating, etc., to coat the surface of steel with a layer that is not easily corroded

Nejack.Check the clearance of the ball bearing and the wear of the suspension wheel guide wheel. If the roller is worn, it is necessary to adjust or replace it. If the elevator bearing is worn, replace the guide wheel or bearing

The lifting foundation of the platform is a large structural component made of alloy steel plates with different thicknesses that are welded together. The welding amount is large, the structural shape is complex, and residual stress is inevitably generated during the manufacturing process. In order to prevent deformation of the components due to changes in residual stress during use, it is necessary to perform stress relief treatment on the completed components.

.Emergency descent: Handle operation or use of manual pressure relief and activation of emergency battery system to implement emergency descent function safety net.

Outbound call form: Outbound call boxes are pre embedded or installed in a column style on the wall or ground near the parking floor above and below the platform, and are linked to operate the platform up and down.

Jinchuang lifting platform product feature 01 is mainly used for high-altitude cargo transportation between floors. With a load capacity of 1-50 tons and a lifting height of 1-25 meters, a guide rail elevator, can be installed indoors and outdoors. The lifting height is high and uses a side mounted oil cylinder, which runs smoothly, has low noise, is convenient for maintenance, and has a long service life. In case of a power outage, manual emergency descent can be used, which is safe convenient, and practical. The pit depth is generally 15cm-30cm, and the top layer height is not affected, The 04 pump station can be customized according to the on-site environment, suitable for 2-3 floors of steel structures or concrete factories. Both the internal and external parts can be used. The 05 pump station adopts a joint venture pump station and an imported pump station from Italy. If the speed requirement is too high, a joint venture customized pump station can be used to meet the ideal delivery requirements. The 06 oil cylinder and seals are made of imported components, solving the problem of unstable oil pressure for customers The oil leakage problem of components 07. The oil cylinder is built into the platform 08. The heavy-duty steel wire rope wheel or weighted special chain ensures safety 09. The automatic insurance during the lifting process ensures vehicle safety 10. The synchronous device during the lifting process ensures that the vehicle may not overturn 11. The alarm setting before falling to the ground ensures the safety of the operator 12. The chain or steel wire rope fracture protection device 13. The hydraulic system pressure loss prevention protection device 14. The elevator special flat layer permanent magnet switch is selected, The leveling effect is good. 15. The distance between heavy and empty loads is small, and the leveling accuracy is high. 16. Standard elevator boards, LCD display call boxes, relevant wiring harnesses, and connectors are selected. Beautiful appearance, easy operation, wiring harness connected using connectors, with automatic and manual options.


NejackMobile boarding bridgeNormalizing



Outdoor guide rail lifting platform, mainly used for high-altitude cargo transportation between floors. With a load capacity of 1-50 tons and an elevation of 1-25 meters, guide rail elevators, also known as hydraulic elevators, can be installed indoors and outdoors. They have a high lifting height and use side mounted oil cylinders, ensuring smooth operation, low noise, convenient maintenance, and long service life. In case of power failure, manual emergency descent can be used which is safe, convenient, fast, and practical. The pit depth is generally 15cm-30cm. Professional elevator manufacturers have high pressure resistance, good waterproof performance, and fire and high temperature resistance, corrosion resistance, radiation resistance, long service life. The top layer height is not affected, and can be customized according to the on-site environment. It is suitable for 2-3 story steel structures or concrete factories, and can be used both internally and externally.

All connecting shafts must have split pins and be sufficient.

Whether the vibration aging treatment has achieved the results can be judged based on the parameter curve observation method.

Analysis project.The safety control voltage of 18 is selected with rolling guide shoes, high accuracy, wear resistance, and stable lifting. The characteristics of the Jinchuang lifting platform are as follows: 1. There is no need for a machine room above the shaft. 2. The hydraulic elevator is not equipped with a counterweight device to improve the utilization rate of the shaft area. 3. The load and load cylinder of the hydraulic elevator directly act on the foundation pit, and the strength requirements of the shaft are low, Brick or brick concrete structure hoistway can be used for Jinchuang lifting platform safety and stability advantages. Overflow valve: It can prevent system pressure from being too high during upward movement. Emergency manual valve: In case of power failure, it can make the elevator emergency descend to the nearest floor position and open the door.

Emergency descent: Handle operation or use of manual pressure relief and activation of emergency battery system to implement emergency descent function safety net.

Thermal aging stress relief is generally suitable for small workpieces, while the lifting foundation structure has a large volume and does not have a large enough annealing furnace. Using natural aging takes one year and the production cycle is too long, so neither of these two methods is feasible. After research and understanding by the manufacturer, it was found that selecting appropriate support points for large welded structural components can perform vibration aging stress relief. Therefore, the manufacturer has decided to use vibration aging for stress relief of the platform lifting foundation. Long term promotion of downgrading manufacturers, 20 year old brand, with price advantages and guaranteed quality!


NejackMobile boarding bridgeNormalizing



Firstly, it is necessary to start from the source. The current technology is relatively advanced. When manufacturing aluminum alloy lifting platforms, which steel should be chosen for production? Because there are many corrosion-resistant steel materials now, etc. to ordinary steel to make stainless steel nickel, changing the internal structure of the metal to prevent rust.

reform.During aging treatment, the equipment prints the vibration aging curve online. According to the curve,NejackSelf propelled scissor hydraulic lifting platform,NejackDouble column aluminum alloy lifting platform, the front end of the a-t curve shows an upward trend indicating that the damping inside the component decreases after vibration treatment, so the amplitude gradually increases; Since then, the amplitude change has been basically stable, indicating that the structure of molecules inside the component tends to be stable, thus it can be determined that the workpiece has reached the effect. The precautions for using an electric lifting platform are as follows: the user unit should arrange a dedicated person to operate the lifting platform and develop details and safety precautions for the use of the lifting platform based on their own unit's situation and hang it in a prominent position. When working on an electric lifting platform, professional drivers and operators must be equipped, and they must undergo specialized training and be qualified. They must hold relevant certificates and take on corresponding responsibilities according to the actual situation of the work. After the construction is completed, the lifting platform needs to be moved on the site and should be operated by a professional driver. Before daily work, zy12 drivers must carefully check the electrical, hydraulic, and mechanical systems of the platform, check the working range of the lifting platform truck, and remove obstacles that hinder the rotation and walking of the lifting platform truck. And empty the platform up and down several times to check for any faults or abnormal phenomena. It is also necessary to pay attention to the accuracy of the platform platform landing station for any obvious abnormal differences. Professional improvement of quality assurance for aircraft manufacturers. The promotional activity is ongoing, and new and old customers are welcome to come for consultation

Knowledge of pressure lifting platforms, boarding bridges, mobile elevators, and more is available in Jiuheng, Jinan. We sincerely welcome colleagues from all walks of life to visit and inspect the factory, cooperate and negotiate, and seek common development. The following maintenance and upkeep are required for the lifting cargo elevator: Maintenance and upkeep: Maintenance and upkeep should be carried out by the equipment operator or full-time personnel of the operating unit. The equipment maintenance and upkeep unit is responsible for supervising and reviewing the maintenance content. The main content of maintenance and upkeep is summarized as follows:; amp; quot; Cross operation method; amp; quot;: Clean, tighten, smooth, adjust, and prevent corrosion. Before and at the end of each shift, 10 to 30 minutes before and after each day, inspect all parts and components of the equipment to ensure they are normal. Apply oil smoothly according to rules, pay attention to the sound of mechanical operation and do a good job in cleaning and handover to achieve the goal of clean appearance and normal operation of the equipment. Maintenance and handover records should be made in a fixed form and used for management

The second method is the protective layer method, which covers the metal surface of the aluminum alloy lifting platform with a protective layer to isolate the metal products from the surrounding corrosive medium and prevent corrosion. Apply engine oil, petroleum jelly, paint, or cover the surface of steel parts with corrosion-resistant non-metallic materials such as enamel and plastic; Using electroplating, hot plating, etc., to coat the surface of steel with a layer that is not easily corroded

Nejack.The second method is the protective layer method, which covers the metal surface of the aluminum alloy lifting platform with a protective layer to isolate the metal products from the surrounding corrosive medium and prevent corrosion. Apply engine oil, petroleum jelly, paint, or cover the surface of steel parts with corrosion-resistant non-metallic materials such as enamel and plastic; Using electroplating, hot plating, spray plating, etc., to coat the surface of steel with a layer that is not easily corroded

Now with the arrival of summer, the aluminum alloy lifting platform will certainly suffer from high temperature and rainstorm in summer. It is easy to rust after a long time under this condition, which will seriously shorten the service life of the equipment and cause safety problems. So how should we prevent equipment rust?

Folding arm lifting platform product features 01 Folding arm lifting platform High altitude operation platform 360 degree rotation without external power supply, can work across obstacles, lifting smoothly and safely. The curved arm lifting platform adopts a curved arm working arm, and the scope and space of operation are not affected.