Nai meihengAluminum alloy lifting platform double columnsStandards implemented

announcer:hp275HP127226562 release time:2024-04-08 13:53:07

Thermal aging stress relief is generally suitable for small workpieces, so neither of these two methods is feasible. After research and understanding by the manufacturer, it was found that selecting appropriate support points for large welded structural components can perform vibration aging stress relief. Therefore,Nai meihengHydraulic aluminum alloy hydraulic lifting platform, the manufacturer has decided to use vibration aging for stress relief of the platform lifting foundation. Long term promotion of downgrading manufacturers, 20 year old brand, with price advantages and guaranteed quality!

The design of support points for selecting process parameters is to avoid energy consumption and noise generation due to collision between components and supports during vibration. The supports should be arranged near the nodal line, and the layout principle is: when the aspect ratio of the component is greater than 2 two point supports can be used; When the aspect ratio is close to 1, it is advisable to use or 4-point support.

Nai meiheng.Check the fastening status of the wall bracket, support rod, and bolts and retaining rings between the lifting cargo elevator and the bridge. If they are loose or displaced, they should be checked and tightened

The arrangement of vibration points should be based on the vibration aging process standard GB/T25712-20. The vibration aging exciter should be placed at a position with high rigidity and amplitude of the workpiece, and its rotating axis should be parallel to the plane where the effective zone of the vibration mode is located. The exciter should be fixed at the end angle or edge of the workpiece with high rigidity, so that small energy can be used to excite the component with large amplitude. Based on the structural shape of the foundation, we set the vibration points on the protruding plates on each side of the workpiece.

.The lifting foundation of the platform is a large structural component made of alloy steel plates with different thicknesses that are welded together. The welding amount is large, the structural shape is complex, and residual stress is inevitably generated during the manufacturing process. In order to prevent deformation of the components due to changes in residual stress during use, it is necessary to perform stress relief treatment on the completed components.

The vibration frequency should be set to obtain large dynamic stress with low energy consumption, and the resonance frequency should be used to handle time dependent vibration. However, and using resonance peaks with higher peaks and lower frequencies for aging can achieve optimal results. The resonance frequency needs to be determined by trial vibration,Nai meihengPrice of 10 ton mobile boarding bridge, which slowly increases the speed of the excitation motor from 0 and determines the relationship curve between the amplitude of the workpiece and the motor speed to determine the resonance point of the workpiece. According to the scanning curve, a large acceleration was obtained at 5366r/min, and then ring the bell to start. It is strictly prohibited to work with the movable doors of the protective fence open. In case of special circumstances during platform operation, the emergency stop switch can be used to stop the platform. However, during normal operation, the rocker will automatically prevent wheelchair platform.

Ensure that the small gear and pressure wheel are securely fastened on the drive base plate, and check the fixing condition of the drive base plate bolts

Jinchuang lifting platform product feature 01 is mainly used for high-altitude cargo transportation between floors. With a load capacity of 1-50 tons and a lifting height of 1-25 meters, a guide rail elevator, also known as a hydraulic elevator, can be installed indoors and outdoors. The lifting height is high and uses a side mounted oil cylinder, which runs smoothly, has low noise, is convenient for maintenance, and has a long service life. In case of a power outage, manual emergency descent can be used, which is safe, convenient, fast, and practical. The pit depth is generally 15cm-30cm, and the top layer height is not affected, The 04 pump station can be customized according to the on-site environment, suitable for 2-3 floors of steel structures or concrete factories. Both the internal and external parts can be used. The 05 pump station adopts a joint venture pump station and an imported pump station from Italy. If the speed requirement is too high, a joint venture customized pump station can be used to meet the ideal delivery requirements. The 06 oil cylinder and seals are made of imported components, solving the problem of unstable oil pressure for customers, The oil leakage problem of components 07. The oil cylinder is built into the platform 08. The heavy-duty steel wire rope wheel or weighted special chain ensures safety 09. The automatic insurance during the lifting process ensures vehicle safety 10. The synchronous device during the lifting process ensures that the vehicle may not overturn 11. The alarm setting before falling to the ground ensures the safety of the operator 12. The chain or steel wire rope fracture protection device 13. The hydraulic system pressure loss prevention protection device 14. The elevator special flat layer permanent magnet switch is selected, The leveling effect is good. 15. The distance between heavy and empty loads is small, and the leveling accuracy is high. 16. Standard elevator boards LCD display call boxes, relevant wiring harnesses, and connectors are selected. Beautiful appearance, easy operation, visual display of the position of the elevator car on the floor, wiring harness connected using connectors, with automatic and manual options.

Safety production.Vibration aging treatment and effect judgment: According to the aging process plan, after setting the support points and vibration pickup points of the workpiece, use a rigid fixture to fix the exciter on the workpiece, and use the manual function of the equipment to test the vibration. It is determined that around 5300 revolutions is the resonance frequency of the component. The amplitude generated by the eccentric gear of the exciter in the fourth gear can meet the vibration processing requirements of the foundation seat, so the excitation force is selected as the fourth gear.

Emergency stop: Press the emergency button switch to raise or lower the machine.

The driver shall close and lock the movable doors at both ends of the protective fence before work, and then ring the bell to start. It is strictly prohibited to work with the movable doors of the protective fence open. In case of special circumstances during platform operation, the emergency stop switch can be used to stop the platform. However, during normal operation,Nai meihengHydraulic aluminum alloy lifting platform, it is prohibited to use the emergency stop switch to stop the platform.


Nai meihengAluminum alloy lifting platform double columnsStandards implemented



Emergency stop: Press the emergency button switch to raise or lower the machine.

Credit guarantee.Applicable environment: Indoor or outdoor Applicable temperature: Safety device Safety rocker: When the equipment is running and rising, the rocker will automatically prevent wheelchair platform.

The frequency conversion system circuit of the construction elevator is mainly composed of two parts: the main circuit and the circuit. The main circuit mainly consists of a construction lifting cargo elevator (hereinafter referred to as the lifting cargo elevator) driven by a more complex rectifier. Before installation, all the eccentric roller shafts of the lifting cage and driving mechanism are loosened or adjusted to a large eccentricity, and the lifting cage and driving mechanism are installed in the guide rail frame respectively, and the two are connected. Starting from adjusting the driving mechanism, power on the suspension cage until it rises 1m above the ground or detaches from the ground buffer spring (or support), the adjustment and sequence are as follows: 1. Use a special wrench to rotate the lower double (single) pendulum eccentric shaft to adjust the eccentricity to maintain the installation surface of the mechanism perpendicular to the horizontal plane, and make the upper and lower pendulum wheels evenly guide the rails at the same time. Rotate each wheel body by hand to check if it evenly presses the rails; 2. Use a special wrench to rotate the eccentric shaft of the gear rack back pressure wheel to adjust the side clearance during gear rack meshing. When adjusting use a feeler gauge to measure the side clearance to 0.2; Between 0.5mm, each pressing wheel should evenly press on the back of the rack. Move each wheel body by hand to check if it evenly presses against the tooth back. Similarly adjust the guide rollers on both sides of the guide rail. The adjustment key is to adjust the guide wheel on one side of the guide rail to lightly press it onto the guide rail. When moving the wheel body by hand, the lifting cage should be adjusted according to the and sequence of adjusting the driving mechanism. Conduct a visual inspection of the operation of each roller, and use the lead pressing method and coloring method to check the meshing of the gear pair; Fine tune 6 pairs of unsatisfactory parts. The key point is to carefully adjust the meshing status of the gear pair: when the spots shown in 1 appear on the surface of the gear rack, it indicates that the driving mechanism is tilted towards the side of the guide rail. At this time, the lower swing wheel (single or double wheel) should be adjusted to move the lower part of the driving mechanism towards the direction of the guide rail until the area of the spots reaches more than 85% of the surface of the gear rack. The smaller the area, the easier it is to damage the gears and racks.

Power supply voltage: Motor power: Lifting: Rocker self reset switch operation Overload protection: Over current relay.

Nai meiheng.Vibration aging treatment and effect judgment: According to the aging process plan, after setting the support points and vibration pickup points of the workpiece, use a rigid fixture to fix the exciter on the workpiece, and use the manual function of the equipment to test the vibration. It is determined that around 5300 revolutions is the resonance frequency of the component. The amplitude generated by the eccentric gear of the exciter in the fourth gear can meet the vibration processing requirements of the foundation seat, so the excitation force is selected as the fourth gear.

Drivers should be responsible for supervising the uniform distribution of items transported by the platform on the platform as much as possible to prevent partial loading and prohibit overloading. flat

The driver shall close and lock the movable doors at both ends of the protective fence before work, and then ring the bell to start. It is strictly prohibited to work with the movable doors of the protective fence open. In case of special circumstances during platform operation, the emergency stop switch can be used to stop the platform. However, during normal operation, it is prohibited to use the emergency stop switch to stop the platform.