ChongqingMobile boarding bridgeHow to construct

announcer:hp275HP127226562 release time:2024-03-27 09:20:46

The vibration frequency should be set to obtain large dynamic stress with low energy consumption, there may be one or more resonance peaks in large components, and using resonance peaks with higher peaks and lower frequencies for aging can achieve optimal results. The resonance frequency needs to be determined by trial vibration, which slowly increases the speed of the excitation motor from 0, and determines the relationship curve between the amplitude of the workpiece and the motor speed to determine the resonance point of the workpiece. According to the scanning curve, a large acceleration was obtained at 5366r/min, so 5366r/min was determined as the aging frequency.

02 The lifting platform adopts a fully hydraulic lifting mechanism, which can be operated inside the platform bucket and on the elevator body. 03 The working arm of the lifting platform can rotate 360 degrees. 04 The hydraulic system is equipped with a safety valve to prevent the main arm oil cylinder oil pipe from cracking. 05 The hydraulic legs are equipped with a hydraulic locking device to prevent the leg oil cylinder from retracting. 06 The hydraulic system is equipped with an automatic platform overload protection device, In order to ensure the safety of operators, each section of the working arm on the platform 07 is equipped with safety limit devices. The hydraulic system seals on the platform 08 are all well-known domestic and foreign brands, and the power of the entire vehicle 09 is a diesel engine with its own power supply. The power supply can also be used. The hydraulic lifting platform is equipped with an emergency lowering device in case of power outage. The 11 folding arm lifting platform product can also use a 50Hz, 380V power motor, and diesel engine dual power.

Chongqing.There are many operational errors, and due to insufficient understanding of the structure and performance of the machine (especially for new operators), it is easy to cause malfunctions and even mechanical accidents due to operational errors. How to calculate the lifting cargo elevator? A lifting cargo elevator is a heavy lifting mechanical equipment that can manually operate the system's buttons to complete the transportation of goods up and down. The lifting height of the lifting cargo elevator varies from 1 meter to 20 meters and special specifications of lifting and lowering cargo elevators can be customized according to user requirements According to the type, mainly used for the transportation of goods between floors of workshops,ChongqingFully automatic scissor fork lifting platform, steel structure workshops, hotels, rooms, and warehouses without pits or machine rooms. Scissor fork type cargo elevators need to be prepared with pits before installation, and the elevator should be fixed and connected in the pit before being connected to the power supply The lifting cargo elevator utilizes hydraulic power units to generate pressure during operation, which drives the hydraulic oil cylinder as the main power to raise and lower the lifting cargo elevator platform. When a guide rail type hydraulic lifting cargo elevator malfunctions, it can immediately stop running, with high safety and stability. The driving of the hydraulic power unit makes it have strong load-bearing capacity and smooth lifting, which can achieve the transportation of large tonnage goods

When the lifting base plate descends, the safety net below immediately stops running and descends when encountering obstacles.

.According to calculations,ChongqingSelf leveling track scissor fork lifting platform, when the support points of the beam type components are located along the length of 1/9L on both sides, the vibration resistance is relatively small, making it easy to obtain resonance and vibration effects with larger amplitudes. The geometric shape of the structure on the lifting foundation is similar to a long beam type component, and the structure is complex. Therefore, two support points should be taken on each side for time treatment.

According to calculations when the support points of the beam type components are located along the length of 1/9L on both sides, the vibration resistance is relatively small, making it easy to obtain resonance and vibration effects with larger amplitudes. The geometric shape of the structure on the lifting foundation is similar to a long beam type component, and the structure is complex. Therefore, two support points should be taken on each side for time treatment.

Jinchuang lifting platform product feature 01 is mainly used for high-altitude cargo transportation between floors. With a load capacity of 1-50 tons and a lifting height of 1-25 meters, a guide rail elevator, can be installed indoors and outdoors. The lifting height is high and uses a side mounted oil cylinder, which runs smoothly, has low noise, is convenient for maintenance, and has a long service life. In case of a power outage, manual emergency descent can be used, which is safe, convenient, fast, and practical. The pit depth is generally 15cm-30cm, and the top layer height is not affected, The 04 pump station can be customized according to the on-site environment, a joint venture customized pump station can be used to meet the ideal delivery requirements. The 06 oil cylinder and seals are made of imported components, solving the problem of unstable oil pressure for customers, The oil leakage problem of components 07. The oil cylinder is built into the platform 08. The heavy-duty steel wire rope wheel or weighted special chain ensures safety 09. The automatic insurance during the lifting process ensures vehicle safety 10. The synchronous device during the lifting process ensures that the vehicle may not overturn 11. The alarm setting before falling to the ground ensures the safety of the operator 12. The chain or steel wire rope fracture protection device 13. The hydraulic system pressure loss prevention protection device 14. The elevator special flat layer permanent magnet switch is selected, The leveling effect is good. 15. The distance between heavy and empty loads is small, and the leveling accuracy is high. 16. Standard elevator boards, LCD display call boxes, relevant wiring harnesses, and connectors are selected. Beautiful appearance easy operation, visual display of the position of the elevator car on the floor, wiring harness connected using connectors, with automatic and manual options.


ChongqingMobile boarding bridgeHow to construct



Emergency stop: Press the emergency button switch to raise or lower the machine.

When loosening occurs, due to alternating loads such as impact and vibration, as well as factors such as heat and deformation, coupled with rapid wear and tear, it is easy to cause the previously fastened components to loosen.

The driver shall close and lock the movable doors at both ends of the protective fence before work, and then ring the bell to start. It is strictly prohibited to work with the movable doors of the protective fence open. In case of special circumstances during platform operation, the emergency stop switch can be used to stop the platform. However, during normal operation, it is prohibited to use the emergency stop switch to stop the platform.

quality.Whether the vibration aging treatment has achieved the results can be judged based on the parameter curve observation method.

The vibration frequency should be set to obtain large dynamic stress with low energy consumption, and the resonance frequency should be used to handle time dependent vibration. However, there may be one or more resonance peaks in large components and using resonance peaks with higher peaks and lower frequencies for aging can achieve optimal results. The resonance frequency needs to be determined by trial vibration, and determines the relationship curve between the amplitude of the workpiece and the motor speed to determine the resonance point of the workpiece. According to the scanning curve which slowly increases the speed of the excitation motor from 0, a large acceleration was obtained at 5366r/min, so 5366r/min was determined as the aging frequency.

According to GB/T25712-2010, when one of the following situations occurs in the curve related to the aging frequency, it can be determined that the area covered by the effective zone of the vibration mode at that frequency has reached the aging effect: the curve rises and flattens; The curve rises,ChongqingFixed guide rail lifting platform, then falls, and then flattens; The resonance frequency of the a-n curve after vibration is lower than that before vibration; The bandwidth of the a-n curve after vibration narrows compared to before vibration; The resonance peak of the a-n curve after vibration exhibits fission phenomenon; The curve flattens out after descent.


ChongqingMobile boarding bridgeHow to construct



According to GB/T25712-2010, when one of the following situations occurs in the curve related to the aging frequency, it can be determined that the area covered by the effective zone of the vibration mode at that frequency has reached the aging effect: the curve rises and flattens; The curve rises, then falls, and then flattens; The resonance frequency of the a-n curve after vibration is lower than that before vibration; The bandwidth of the a-n curve after vibration narrows compared to before vibration; The resonance peak of the a-n curve after vibration exhibits fission phenomenon; The curve flattens out after descent.

Sampling inspection.Low failure rate: Due to the use of advanced hydraulic systems and good methods, it is driven by the pressure generated by its own weight, which greatly saves energy.

Lifting and lowering

The vibration frequency should be set to obtain large dynamic stress with low energy consumption, and the resonance frequency should be used to handle time dependent vibration. However, there may be one or more resonance peaks in large components, and using resonance peaks with higher peaks and lower frequencies for aging can achieve optimal results. The resonance frequency needs to be determined by trial vibration, which slowly increases the speed of the excitation motor from 0, and determines the relationship curve between the amplitude of the workpiece and the motor speed to determine the resonance point of the workpiece. According to the scanning curve, a large acceleration was obtained at 5366r/min, so 5366r/min was determined as the aging frequency.

Chongqing.Emergency descent: Handle operation or use of manual pressure relief and activation of emergency battery system to implement emergency descent function safety net.

The design of support points for selecting process parameters is to avoid energy consumption and noise generation due to collision between components and supports during vibration. The supports should be arranged near the nodal line, and the layout principle is: when the aspect ratio of the component is greater than 2, two point supports can be used; When the aspect ratio is close to 1, it is advisable to use or 4-point support.

Emergency stop: Press the emergency button switch to raise or lower the machine.