LecceLoading and unloading hydraulic platformWhat are the features

announcer:hp391HP142030639 release time:2024-01-13 09:07:16

and safety nets or other protective devices should be installed below the work site to avoid injury from falling objects.

For project engineering

Staying below high-altitude work sites is prohibited, if the selected construction elevator can ensure the safety of construction workers, of course, it can also improve the overall work efficiency of the construction. Therefore, there are many manufacturers and types of construction elevators on the market, and facing the mixed situation of good and bad many customers have no choice when choosing. In fact, when choosing elevators, the first thing to pay attention to is their quality, so that they can choose suitable elevators. But now many customers have high requirements for craftsmanship when choosing elevators.

Lecce.In this situation, the parts should be replaced in a timely manner. I believe many people have encountered overheating in electric motors. In this case, it is necessary to stop the motor in a timely manner, and then troubleshoot the problem before continuing to use it. This way, the motor shaft can be used and the effect is good.

Leading spaces in blank lines Full width: Font size: Replace: Replace

.Special manufacturing processes. Everyone knows that fixed loading and unloading platforms can have a good market performance, which is closely related to the advanced manufacturing technology of manufacturers. In fact, there are still many advanced processes that can be used nowadays. If used appropriately in daily production and manufacturing processes, it can still improve the quality and production efficiency of manufacturers' products to a certain extent. As for this type of loading and unloading platform, manufacturers use many special manufacturing processes during production which makes it highly stable in application.

The boarding bridge can be divided into two forms: a mobile boarding bridge and a fixed boarding bridge. A brief introduction to the application scope of a fixed boarding bridge and the use of a mobile boarding bridge: used in places without loading and unloading platforms or where mobile loading and unloading of goods are required. If there is no loading and unloading platform at the logistics site, as a remedial measure, a mobile boarding bridge is a very suitable solution. The mobile boarding bridge is equivalent to a moving steel structure slope, and forklifts can also directly drive into the truck carriages for batch loading and unloading operations. Fast loading and unloading of goods can be achieved with only one person operating and without the need for power supply.

When the motor overheats, it should be stopped immediately, and after troubleshooting, it should continue to operate. The motor bearings should be in good condition.


LecceLoading and unloading hydraulic platformWhat are the features



When working at heights exceeding 1.5 meters, safety nets or safety belts must be used.

For lifting platforms without manned protection, it is strictly prohibited to carry people during use. At the same time, attention should be paid during use to prevent damage to hands, feet, and clothing.

When using the elevator, we should listen for any abnormal noise. If there is any abnormal noise, we should immediately stop using it to avoid serious damage to the elevator.

packing.The drive motor can stop the movement of the rack on the pillar.

Using Help

Remove and disassemble the lowering valve, blow the valve core clean with compressed air, and then reinstall it.


LecceLoading and unloading hydraulic platformWhat are the features



Small typesetting Copyright Shu ICP Bei No. 11019783-1

Installation requirements.When working at heights exceeding 1.5 meters, safety nets or safety belts must be used.

The characteristics of hydraulic lifting platforms are obvious, allowing even a single person to operate, making them relatively suitable. The mast columns of its system are equipped with guide wheels, so its lifting and lowering are relatively stable during use. Of course, attention should also be paid to the structure of the hydraulic lifting platform to ensure its compact structure, so as to ensure its size during transportation. Only in this way can you enter the car of a general elevator, and then you can smoothly open the door. Of course, so we need to pay attention to this point.

Using Help | Updating Logs | Original Software | Daily Software

Lecce.Check the hydraulic oil quality and level. When the lifting platform is raised to a high position, the hydraulic oil level should be 40-50 millimeters higher than the bottom of the oil tank. When the color of the hydraulic oil darkens, the oil becomes sticky, or there are foreign objects such as gravel in the oil, the hydraulic oil should be replaced in a timely manner. The hydraulic system of the lifting platform should be checked for hydraulic and pipeline connections. If the pipeline is damaged, it should be replaced immediately; When there is looseness in the connection part, tighten the pipe joint.

When the motor overheats, it should be stopped immediately,LecceSix degrees of freedom hydraulic platform,LecceDouble layer hydraulic lifting platform, and after troubleshooting, it should continue to operate. The motor bearings should be in good condition.

Regularly check all wires and cables for damage, and promptly wrap and replace the damaged parts.