OldenburgHydraulic electric lifting platformHow to choose

announcer:hp391HP142030639 release time:2023-12-05 13:13:51

Staying below high-altitude work sites is prohibited, and safety nets or other protective devices should be installed below the work site to avoid injury from falling objects.

The brakes of each mechanism should be regularly checked and adjusted for the clearance between the brake pads and brake wheels to ensure flexibility and reliability. There should be no dirt on the friction surface. If there is dirt, it must be cleaned with gasoline or rare materials.

Oldenburg.To understand the operation of the mechanism, the main focus is on whether it is normal and whether there is noise during use. When faults are found, timely troubleshooting is necessary to ensure the normal operation and use of the machine. During installation, it is necessary to disassemble or adjust the rotating mechanism. In this case, it is necessary to ensure that the rotating mechanism can be parallel to the centerline of the reducer and the centerline of the gear, and of course, the meshing clearance should also be appropriate. If this is not appropriate, then the machinery cannot operate normally.

Later, when there is a major malfunction of the lifting platform, it should not be used again to avoid accidents, personnel and property losses.

.The current fixed hydraulic elevators are mainly enclosed or meshed lifting channels surrounded by buildings and light steel structures, and use hydraulic cylinders to lift the platform. Its main components are as follows: the lifting passage part: a closed or mesh frame surrounded by buildings or light steel structures, a fixed hydraulic lifting platform with steel guide rails installed on both sides of the internal driving part: it is equipped with hydraulic driving motors, oil pumps, safety valves, fixed hydraulic lifting platform speed control valves The small oil tank cylinder part of hydraulic components such as directional valves: composed of one or more cylinders of a lifting cylinder a straight top platform, forming a door system. The closed or mesh platform door or door system consists of a steel structure or a lifting shear fork frame, with manual and automatic doors. Generally, open platforms do not have doors. The electrical part is composed of power, signal, safety, lighting, and other devices. The platform part is a steel structure platform that carries heavy objects, There are enclosed (i.e. cabin type) or open types, with guide rollers or guide shoes on both sides. The platform bottom can be connected to the lifting cylinder or lifting scissor type steel frame auxiliary parts, which are composed of hydraulic pipe fittings, pipelines pressure gauges, and steel structure bases; Safety devices: safety valves, limit limits, door electromechanical interlocking, rupture valves, emergency switches, and electrical short circuit protection.

Remove and disassemble the lowering valve, blow the valve core clean with compressed air, and then reinstall it.

High altitude work requires the use of tool bags, and heavier and larger high-altitude work tools should be hung on stable components and cannot be placed randomly to avoid the occurrence of high-altitude falling accidents.


OldenburgHydraulic electric lifting platformHow to choose



Troubleshooting: When the elevator power light is turned on, but the lifting platform does not rise. This may be due to the reversal of the motor after the three-phase power supply is connected, just change the two phase wires of the heavy machine.

Of course, the hydraulic lifting platform uses a dual protection structure, which can make the work relatively safer. When lifting, an appropriate working surface can be selected, so that the lifting platform will be safer during operation. The process of operating the hydraulic lifting platform should be standardized,OldenburgPlatform Hydraulic, so that maintenance and debugging can be carried out before leaving the factory. At the same time, it can also ensure that all technical indicators can meet the design requirements, but it is necessary to connect the ground wire during use. Of course, the hydraulic electrical system does not need to be adjusted in this situation.

Using Help

Quality inspection report.The boarding bridge can be divided into two forms: a mobile boarding bridge and a fixed boarding bridge. A brief introduction to the application scope of a fixed boarding bridge and the use of a mobile boarding bridge: used in places without loading and unloading platforms or where mobile loading and unloading of goods are required. If there is no loading and unloading platform at the logistics site, as a remedial measure,OldenburgHydraulic lifting platform for vehicles, and forklifts can also directly drive into the truck carriages for batch loading and unloading operations. Fast loading and unloading of goods can be achieved with only one person operating and without the need for power supply.

The above detailed introduction, I believe everyone has a certain understanding of elevator selection, so that they can have a clear goal when choosing, and then choose the elevator that is suitable for customers.

Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.


OldenburgHydraulic electric lifting platformHow to choose



For project engineering, if the selected construction elevator can ensure the safety of construction workers of course, it can also improve the overall work efficiency of the construction. Therefore, there are many manufacturers and types of construction elevators on the market, and facing the mixed situation of good and bad, many customers have no choice when choosing. In fact, when choosing elevators, the first thing to pay attention to is their quality, so that they can choose suitable elevators. But now many customers have high requirements for craftsmanship when choosing elevators.

quality.The purpose of the stage elevator: The telescopic stage adopts an effective guidance system, which reduces the gap between the telescopic stage and the fixed stage during the translation process, ensures smooth operation, and continuously changes speed. The synchronous device adopts a low speed and large torque drive, making the stage parallel, free, and can automatically achieve leveling. Suitable for cultural and entertainment venues such as halls, multifunctional halls, studios, cultural sports venues, hotels, etc.

To understand the operation of the mechanism, the main focus is on whether it is normal and whether there is noise during use. When faults are found, timely troubleshooting is necessary to ensure the normal operation and use of the machine. During installation, it is necessary to disassemble or adjust the rotating mechanism. In this case,OldenburgHydraulic loading platform, it is necessary to ensure that the rotating mechanism can be parallel to the centerline of the reducer and the centerline of the gear, and of course, the meshing clearance should also be appropriate. If this is not appropriate, then the machinery cannot operate normally.

The boarding bridge can be divided into two forms: a mobile boarding bridge and a fixed boarding bridge. A brief introduction to the application scope of a fixed boarding bridge and the use of a mobile boarding bridge: used in places without loading and unloading platforms or where mobile loading and unloading of goods are required. If there is no loading and unloading platform at the logistics site, as a remedial measure, a mobile boarding bridge is a very suitable solution. The mobile boarding bridge is equivalent to a moving steel structure slope, and forklifts can also directly drive into the truck carriages for batch loading and unloading operations. Fast loading and unloading of goods can be achieved with only one person operating and without the need for power supply.

Oldenburg.two

After working for 10000 hours repair the mechanical and electrical systems of the elevator.

When using the elevator, we should listen for any abnormal noise. If there is any abnormal noise, we should immediately stop using it to avoid serious damage to the elevator.