SimskHydraulic platform hydraulic liftingImport substitution process

announcer:hp391HP142030639 release time:2024-04-02 13:20:13

I believe everyone has a comprehensive understanding and understanding of the use of hydraulic elevators and promptly wrap and replace the damaged parts.

Simsk.The above detailed introduction

Tail signature:

Regularly check all wires and cables for damage, and these details cannot be ignored during the use process.

Convert to Simplified Chinese Convert to Traditional Chinese without converting the number of blank lines between paragraphs before and after:

.The current fixed hydraulic elevators are mainly enclosed or meshed lifting channels surrounded by buildings and light steel structures, and use hydraulic cylinders to lift the platform. Its main components are as follows: the lifting passage part: a closed or mesh frame surrounded by buildings or light steel structures, a fixed hydraulic lifting platform with steel guide rails installed on both sides of the internal driving part: it is equipped with hydraulic driving motors, oil pumps, safety valves, fixed hydraulic lifting platform speed control valves The small oil tank cylinder part of hydraulic components such as directional valves: composed of one or more cylinders of a lifting cylinder, a straight top platform, or a lifting shear fork frame, forming a door system. The closed or mesh platform door or door system consists of a steel structure,SimskElectric hydraulic lifting platform, open platforms do not have doors. The electrical part is composed of power, signal, lighting, and other devices. The platform part is a steel structure platform that carries heavy objects, There are enclosed (i.e. cabin type) or open types with guide rollers or guide shoes on both sides. The platform bottom can be connected to the lifting cylinder or lifting scissor type steel frame auxiliary parts, which are composed of hydraulic pipe fittings, pressure gauges, and steel structure bases; Safety devices: safety valves, limit limits, door electromechanical interlocking, rupture valves, emergency switches, and electrical short circuit protection.

In short, when using a fixed loading and unloading platform, there is basically no need to worry about stability, as the manufacturer has taken many measures in this regard, providing more guarantees, so many times it can be used with confidence.

Everyone knows that construction elevators are used during the construction process because they have stability, are sturdy and reliable during use, and are widely used in the field of high-rise buildings due to their small size and other advantages.


SimskHydraulic platform hydraulic liftingImport substitution process



When using the elevator, the legs must be opened first. If the legs are not lifted, it is strictly prohibited to lift them.

When using a hydraulic lifting cargo elevator, it is necessary to have corresponding inspection routes. If the route malfunctions and the joint becomes loose, it is necessary to turn it on or off properly. In this case, there may be short lines or damaged components. Using a table for inspection is relatively better.

Safety protection components, in order to ensure safety production, it is essential to install a lifting platform for proper protection. The main protective accessories include safety belts, guardrails, protective covers, platform stairs, etc.

project.Regularly check whether the operation of each mechanism is normal and whether there is any noise. If any faults are found, they must be promptly eliminated.

The elevator has undergone strict testing before leaving the factory. If the pressure regulating valve is adjusted arbitrarily by non manufacturers,SimskCargo hydraulic lifting platform, it may cause abnormal system operation. Non professionals should not adjust the pressure regulating valve arbitrarily!

For customers to use and operate the lifting platform for a long time, the editor briefly introduces how to maintain and repair the lifting platform: First of all, normal maintenance is mainly focused on prevention, especially if any damage or malfunction is detected and corrected or repaired in a timely manner. Careful inspection and maintenance at this time can save costs and avoid larger problems, resulting in costly repairs.


SimskHydraulic platform hydraulic liftingImport substitution process



The seat belt needs to be inspected every six months with a load of 225 kilograms. The test time is five minutes. After the test, check whether the seat belt is broken or deformed, and keep records of the experiment. Any unqualified seat belts should be immediately stopped from use.

Quality assurance.When the motor overheats,SimskHydraulic lifting platform automatic, it should be stopped immediately, and after troubleshooting, it should continue to operate. The motor bearings should be in good condition.

When a hydraulic lifting platform malfunctions, it is necessary to take time to prepare accordingly. At this time, it is necessary to provide timely feedback or communicate with the manufacturer. If a voltage range is used to detect the hydraulic lifting platform, it is necessary to turn on the power in this case. The circuit schematic is used to measure the electrical circuit. At this time, the voltage value can be measured, and the voltage value can also understand where the fault point is. Therefore, in this case, it is necessary to learn to analyze.

Small typesetting Copyright Shu ICP Bei No. 11019783-1

Simsk.Tail signature:

Small typesetting Copyright Shu ICP Bei No. 11019783-1

High stability of manufacturing materials. Usually, manufacturers can choose a variety of manufacturing materials when producing fixed loading and unloading platforms, and each material brings different effects when used. For many manufacturers, in order to improve the stability of loading and unloading platforms during use, materials with high stability will be used as much as possible, as such materials can achieve better results in application.