Zaleg szegerUnloading hydraulic platformControl issues to consider

announcer:hp391HP142030639 release time:2024-03-19 13:55:10

For customers to use and operate the lifting platform for a long time, the editor briefly introduces how to maintain and repair the lifting platform: First of all,Zaleg szegerScissor type hydraulic platform, normal maintenance is mainly focused on prevention especially if any damage or malfunction is detected and corrected or repaired in a timely manner. Careful inspection and maintenance at this time can save costs and avoid larger problems, resulting in costly repairs.

Firstly, an obvious advantage is its high safety performance. The guide rail hydraulic lifting platform adopts heavy-duty chain transmission, hydraulic explosion-proof oil pipes, safety devices to prevent overloading, multiple limit switch protection, door and power outage protection, leakage protection and multi-layer building interaction. Therefore, the safety factor of the guide rail hydraulic lifting platform is still very high, much higher than that of ordinary platforms.

Zaleg szeger.When using a hydraulic lifting cargo elevator, it is necessary to have corresponding inspection routes. If the route malfunctions and the joint becomes loose, it is necessary to turn it on or off properly. In this case, there may be short lines or damaged components. Using a table for inspection is relatively better.

After 5000 hours of operation of the elevator, repair the mechanical and electrical systems.

.Small typesetting Copyright Shu ICP Bei No. 11019783-1

Remove and disassemble the lowering valve, and then reinstall it.

After 5000 hours of operation of the elevator, repair the mechanical and electrical systems.


Zaleg szegerUnloading hydraulic platformControl issues to consider



If there are problems inside the elevator and electrical professionals are present, any components of the hydraulic system should be disassembled and repaired in a completely depressurized condition.

It can be seen that the hydraulic lifting platform needs to carefully inspect the hydraulic and electrical systems before use, so as to facilitate its use.

Shafts must have split pins and be sufficient.

Finance Department.The loading and unloading mobile boarding bridge has become a very common structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain,Zaleg szegerSmall hydraulic platform loading and unloading truck, and a loading and unloading operation platform for enterprises to quickly and turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to quickly enter and exit transportation vehicles for loading and unloading operations.

Convert to Simplified Chinese Convert to Traditional Chinese without converting the number of blank lines between paragraphs before and after:

Remove trailing spaces, remove first and last interfering characters, remove blank lines, remove non paragraph blank lines, punctuation correction: Leading space type: Number of spaces:


Zaleg szegerUnloading hydraulic platformControl issues to consider



Check the rollers, intermediate shafts, it may harm people and objects!

Everyone knows that many industries use hydraulic elevators,Zaleg szegerHydraulic and electric lifting platform, and when using them, it is necessary to ensure the stability of the machine. If the machine is unstable, it will have a significant impact during use. So, what details cannot be ignored during the use of hydraulic elevators?

Leading spaces in blank lines Full width: Font size: Replace: Replace

Zaleg szeger.Staying below high-altitude work sites is prohibited, and safety nets or other protective devices should be installed below the work site to avoid injury from falling objects.

The drive motor can stop the movement of the rack on the pillar.

After 5000 hours of operation of the elevator, repair the mechanical and electrical systems.