After 5000 hours of operation of the elevator, repair the mechanical and electrical systems.

Delft.In this situation, it is necessary to regularly check all wires and cables used to ensure that there is no damage. When there is wrapping or damage, the parts should be replaced in a timely manner. I believe many people have encountered overheating in electric motors. In this case it is necessary to stop the motor in a timely manner, the motor shaft can be used and the effect is good.

Application and characteristics of stage elevators: Stage elevators also known as lifting stages, are specifically installed on the stage and used for lifting and rotating the stage. They are called stage elevators. It has multiple functions such as lifting, rotating, and tilting, and adopts protective measures such as self-locking, interlocking, travel switch,DelftHydraulic experimental platform for teaching, mechanical limit, hydraulic explosion-proof, etc.

.Troubleshooting: When the elevator power light is turned on, press the up button, the motor rotates, just change the two phase wires of the heavy machine.

Of course, when choosing a lift, it is also necessary to consider its production. If a manufacturer has a large production capacity, especially the construction lift has relatively high requirements for production technology. Therefore, when making a purchase, it is important to consider the factory building and process of its production, all of which are very important.

Using Help | Updating Logs | Original Software | Daily Software


DelftHydraulic fixed lifting platformWhat are the pre-assembly methods on site



The elevator has undergone strict testing before leaving the factory. If the pressure regulating valve is adjusted arbitrarily by non manufacturers, it may cause abnormal system operation. Non professionals should not adjust the pressure regulating valve arbitrarily!

To understand the operation of the mechanism, the main focus is on whether it is normal and whether there is noise during use. When faults are found, timely troubleshooting is necessary to ensure the normal operation and use of the machine. During installation, it is necessary to disassemble or adjust the rotating mechanism. In this case, it is necessary to ensure that the rotating mechanism can be parallel to the centerline of the reducer and the centerline of the gear, and of course, the meshing clearance should also be appropriate. If this is not appropriate, then the machinery cannot operate normally.

Check the rollers, intermediate shafts, and bearings; Oil cylinder pin and bearing; Equality and wear of the hinge shaft and bearings of the boom; Add oil to the above components for maintenance of outdoor elevators and factory elevators. Extend the service life of bearings.

Economic management.The lifting stage can achieve the lifting of a double-layer tabletop. It can also be pieced into a stepped multi scenic, and multi-level staircase as needed,

Update Log

When using the elevator, we should listen for any abnormal noise. If there is any abnormal noise, we should immediately stop using it to avoid serious damage to the elevator.


DelftHydraulic fixed lifting platformWhat are the pre-assembly methods on site



Tail signature:

device management.Due to the fact that the power unit of the hydraulic lifting platform requires an oil source, its structure is relatively complex, and it also has a certain degree of pollution and impact on the environment. The speed of the moving device is relatively fast making it difficult to meet the design requirements for speed. The structure of the electric rod is very simple, occupies small space,DelftPlatform hydraulic lifting platform, but does not have a price advantage. Therefore, a power source is used as the lifting power source, The DC motor is directly transmitted to other mechanical devices through a reducer for deceleration.

In this situation, it is necessary to regularly check all wires and cables used to ensure that there is no damage. When there is wrapping or damage, the parts should be replaced in a timely manner. I believe many people have encountered overheating in electric motors. In this case, it is necessary to stop the motor in a timely manner,DelftHydraulic lifting platform, and then troubleshoot the problem before continuing to use it. This way, the motor shaft can be used and the effect is good.

Convert to Simplified Chinese Convert to Traditional Chinese without converting the number of blank lines between paragraphs before and after:

Delft.Regularly check whether the operation of each mechanism is normal and whether there is any noise. If any faults are found, they must be promptly eliminated.

Check the rollers, intermediate shafts, and bearings; Oil cylinder pin and bearing; Equality and wear of the hinge shaft and bearings of the boom; Add oil to the above components for maintenance of outdoor elevators and factory elevators. Extend the service life of bearings.

The purpose of the stage elevator: The telescopic stage adopts an effective guidance system, which reduces the gap between the telescopic stage and the fixed stage during the translation process, ensures smooth operation, and continuously changes speed. The synchronous device adopts a low speed and large torque drive, making the stage parallel, free, and retractable in place during the stretching process, and can automatically achieve leveling. Suitable for cultural and entertainment venues such as halls, cinemas, multifunctional halls, cultural sports venues, hotels, etc.