SilmhantanMobile hydraulic lifting platformMarket demand is hindered, price drop is limited

announcer:hp391HP142030639 release time:2024-02-27 12:41:13

The boarding bridge can be divided into two forms: a mobile boarding bridge and a fixed boarding bridge. A brief introduction to the application scope of a fixed boarding bridge and the use of a mobile boarding bridge: used in places without loading and unloading platforms or where mobile loading and unloading of goods are required. If there is no loading and unloading platform at the logistics site, as a remedial measure, a mobile boarding bridge is a very suitable solution. The mobile boarding bridge is equivalent to a moving steel structure slope, and forklifts can also directly drive into the truck carriages for batch loading and unloading operations. Fast loading and unloading of goods can be achieved with only one person operating and without the need for power supply.

Remove trailing spaces, remove first and last interfering characters, remove blank lines, remove non paragraph blank lines, punctuation correction: Leading space type: Number of spaces:

Silmhantan.To understand the operation of the mechanism, the main focus is on whether it is normal and whether there is noise during use. When faults are found, timely troubleshooting is necessary to ensure the normal operation and use of the machine. During installation, it is necessary to disassemble or adjust the rotating mechanism. In this case, it is necessary to ensure that the rotating mechanism can be parallel to the centerline of the reducer and the centerline of the gear, and of course, the meshing clearance should also be appropriate. If this is not appropriate then the machinery cannot operate normally.

Secondly, for the replacement of hydraulic oil on the lifting platform,SilmhantanUnloading hydraulic platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

.The boarding bridge can be divided into two forms: a mobile boarding bridge and a fixed boarding bridge. A brief introduction to the application scope of a fixed boarding bridge and the use of a mobile boarding bridge: used in places without loading and unloading platforms or where mobile loading and unloading of goods are required. If there is no loading and unloading platform at the logistics site, as a remedial measure, a mobile boarding bridge is a very suitable solution. The mobile boarding bridge is equivalent to a moving steel structure slope, and forklifts can also directly drive into the truck carriages for batch loading and unloading operations. Fast loading and unloading of goods can be achieved with only one person operating and without the need for power supply.

Fixed loading and unloading bridge: The fixed loading and unloading bridge is a specialized auxiliary equipment for achieving rapid loading and unloading of goods. Its height adjustment function uses a bridge between the truck and the cargo platform in the warehouse, and forklifts and other vehicles can move and load goods in batches inside the truck. Only one person can work to achieve rapid loading and unloading of goods. It enables enterprises to reduce a large amount of labor, improve work efficiency, and obtain greater economic benefits.

If there are problems inside the elevator and electrical professionals are present, any components of the hydraulic system should be disassembled and repaired in a completely depressurized condition.


SilmhantanMobile hydraulic lifting platformMarket demand is hindered, price drop is limited



Regularly check the connection of each part and tighten it if there is any looseness

Everyone knows that many industries use hydraulic elevators, and when using them, it is necessary to ensure the stability of the machine. If the machine is unstable, it will have a significant impact during use. So,SilmhantanElectric hydraulic unloading platform, what details cannot be ignored during the use of hydraulic elevators?

The seat belt needs to be inspected every six months, with a load of 225 kilograms. The test time is five minutes. After the test check whether the seat belt is broken or deformed, and keep records of the experiment. Any unqualified seat belts should be immediately stopped from use.

Job description.After working for 10000 hours, repair the mechanical and electrical systems of the elevator.

Secondly, the maintenance of the guide rail type hydraulic lifting platform is also very simple using oil cylinders and chain transmission, with very few moving components, this type of lifting cargo elevator has a very compact structure and uses fewer bearings, resulting in a longer service life.

In short, when using a fixed loading and unloading platform, there is basically no need to worry about stability, providing more guarantees, price drop is limited' >



Due to the fact that the power unit of the hydraulic lifting platform requires an oil source, its structure is relatively complex, and it also has a certain degree of pollution and impact on the environment. The speed of the moving device is relatively fast, making it difficult to meet the design requirements for speed. The structure of the electric rod is very simple, occupies small space but does not have a price advantage. Therefore, a power source is used as the lifting power source, The DC motor is directly transmitted to other mechanical devices through a reducer for deceleration.

How much is it.When we use hydraulic elevators in our daily lives, we need to regularly inspect and maintain them. This not only extends the lifespan of the hydraulic elevators, but also allows them to exert greater power in their work. For example, the transmission part requires sufficient oil, and consuming components must be regularly inspected, maintained, or replaced. Mechanical bolts, especially those that frequently vibrate, such as rotating supports and lifting arm connecting bolts, must be tightened or replaced immediately when they become loose. Next, the editor will introduce how hydraulic elevators should be maintained.

To understand the operation of the mechanism, the main focus is on whether it is normal and whether there is noise during use. When faults are found, timely troubleshooting is necessary to ensure the normal operation and use of the machine. During installation, it is necessary to disassemble or adjust the rotating mechanism. In this case, it is necessary to ensure that the rotating mechanism can be parallel to the centerline of the reducer and the centerline of the gear, and of course, the meshing clearance should also be appropriate. If this is not appropriate, then the machinery cannot operate normally.

Troubleshooting: When the elevator power light is turned on, press the up button, but the lifting platform does not rise. This may be due to the reversal of the motor after the three-phase power supply is connected, just change the two phase wires of the heavy machine.

Silmhantan.Remove trailing spaces, remove first and last interfering characters, remove blank lines, remove non paragraph blank lines, punctuation correction: Leading space type: Number of spaces:

If the elevator malfunctions, non electrical professionals are not allowed to disassemble and assemble electrical appliances at will to prevent accidental connection or electric shock!

Check the hydraulic oil quality and level. When the lifting platform is raised to a high position, the hydraulic oil level should be 40-50 millimeters higher than the bottom of the oil tank. When the color of the hydraulic oil darkens, the oil becomes sticky, or there are foreign objects such as gravel in the oil, the hydraulic oil should be replaced in a timely manner. The hydraulic system of the lifting platform should be checked for hydraulic and pipeline connections. If the pipeline is damaged, it should be replaced immediately; When there is looseness in the connection part, tighten the pipe joint.