HungarySelf propelled hydraulic aerial work platformThe low rebound performance is commendable

announcer:hp391HP142030639 release time:2024-02-13 14:28:34

The seat belt needs to be inspected every six months, with a load of 225 kilograms. The test time is five minutes. After the test, check whether the seat belt is broken or deformed, and keep records of the experiment. Any unqualified seat belts should be immediately stopped from use.

Convert to Simplified Chinese Convert to Traditional Chinese without converting the number of blank lines between paragraphs before and after:

Hungary.It can be seen that the hydraulic lifting platform needs to carefully inspect the hydraulic and electrical systems before use so as to facilitate its use.

Everyone knows that construction elevators are used during the construction process because they have stability, are sturdy and reliable during use, and are widely used in the field of high-rise buildings due to their small size and other advantages.

.The pressure lifting platform adopts a double four bar mechanism to achieve the lifting and flipping of the vehicle mounted cargo elevator platform, and a complex self-locking mechanism to achieve automatic opening and closing of the baffle. In order to reduce driving force, multiple sets of pulleys are used to achieve motion transmission and smooth movement on both sides of the lifting device. The hydraulic lifting platform adopts a hydraulic power unit transmission method, making the lifting more stable and the service life longer.

Check the rollers, intermediate shafts, and bearings; Oil cylinder pin and bearing; Equality and wear of the hinge shaft and bearings of the boom; Add oil to the above components for maintenance of outdoor elevators and factory elevators. Extend the service life of bearings.

If the elevator malfunctions, non electrical professionals are not allowed to disassemble and assemble electrical appliances at will to prevent accidental connection or electric shock!


HungarySelf propelled hydraulic aerial work platformThe low rebound performance is commendable



If there are problems inside the elevator and electrical professionals are present, any components of the hydraulic system should be disassembled and repaired in a completely depressurized condition.

In this situation, it is necessary to regularly check all wires and cables used to ensure that there is no damage. When there is wrapping or damage, the parts should be replaced in a timely manner. I believe many people have encountered overheating in electric motors. In this case, it is necessary to stop the motor in a timely manner, and then troubleshoot the problem before continuing to use it. This way, the motor shaft can be used and the effect is good.

Secondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, timely inspection of various functions is essential.

Excellent service.Pay attention to checking each part of the steel wire rope for broken wires and loose strands. If the tide passes through the relevant regulations,HungaryGkt12 hydraulic lifting platform, oil pumps, safety valves, fixed hydraulic lifting platform speed control valves The small oil tank cylinder part of hydraulic components such as directional valves: composed of one or more cylinders of a lifting cylinder,HungaryWhere do I sell hydraulic lifting platforms, a straight top platform, or a lifting shear fork frame, forming a door system. The closed or mesh platform door or door system consists of a steel structure, with manual and automatic doors. Generally, open platforms do not have doors. The electrical part is composed of power, signal, safety, lighting and other devices. The platform part is a steel structure platform that carries heavy objects, There are enclosed (i.e. cabin type) or open types, with guide rollers or guide shoes on both sides. The platform bottom can be connected to the lifting cylinder or lifting scissor type steel frame auxiliary parts which are composed of hydraulic pipe fittings, pipelines, pressure gauges, and steel structure bases; Safety devices: safety valves, limit limits, door electromechanical interlocking, rupture valves, emergency switches, and electrical short circuit protection.

Convert to Simplified Chinese Convert to Traditional Chinese without converting the number of blank lines between paragraphs before and after:


HungarySelf propelled hydraulic aerial work platformThe low rebound performance is commendable



After working for 10000 hours, repair the mechanical and electrical systems of the elevator.

Encyclopedic knowledge.Maintenance time regulations for hydraulic elevators: After 1500 hours of daily maintenance of the elevator, repair the mechanical and electrical systems.

When using hydraulic elevators,HungaryHydraulic elevator platform, check the connections of each part during use and tighten them in a timely manner if there is any looseness. All connecting shafts require the use of split pins in order to ensure sufficient use and better utilization.

The hook of the seat belt should not be hung on unstable or moving objects.

Hungary.Everyone knows that construction elevators are used during the construction process because they have stability, are sturdy and reliable during use, and are widely used in the field of high-rise buildings due to their small size and other advantages.

For homepage | add favorites | email | QQ: If you have any questions, please QQ us!

The drive motor can stop the movement of the rack on the pillar.