BaileAtha IElevators on the construction siteWhat problems should be paid attention to during operation

announcer:hp323HP155335083 release time:2024-03-23 11:23:55

Check the rollers intermediate shafts, and bearings; Oil cylinder pin and bearing; Equality and wear of the hinge shaft and bearings of the boom; Add oil to the above components for maintenance of outdoor elevators and factory elevators. Extend the service life of bearings.

In addition, clean the anti rust oil on the motor input shaft positioning boss, and elevator connection parts with gasoline or zinc sodium water. Its purpose is to ensure the tightness of the connection and the flexibility of operation, and to prevent unnecessary wear and tear.

BaileAtha I.Novice operators should pay attention to which equipment wears quickly when operating mobile elevators: Due to factors such as the processing and installation of high-altitude work platform equipment components such as mobile elevators, the equipment surface is rough, the area is small, and the load bearing is uneven, which can cause equipment wear. During the operation of high-altitude work platform equipment such as mobile elevators, the concave and convex parts on the surface of the parts are embedded and friction with each other,BaileAtha I5 meter elevator, and metal debris undergoes secondary friction with the equipment, mobile elevators and other high-altitude work platform equipment are prone to wear and tear of components during the running-in period, with a fast wear rate.

When conducting high-altitude operations on dangerous edges such as roofs, suspension bridges, slopes, or cliffs, guardrails or safety nets should be installed on the side facing the air, two wheel traction, self driving, and car modification.

Three column aluminum alloy elevator: Three sets of masts support the synchronous lifting of the working platform, and the support structure is the same as that of a single masted platform, with super large load capacity and work stability. The overall lifting guardrail device has good strength and greatly reduces the height of the entire machine during transportation. It is very convenient for loading and unloading, and can be assembled or disassembled in one lift.

3: High pressure water abrasive rust removal. A type of spiral elevator that utilizes the impact of high-pressure water jet and abrasive to polish and remove rust, with the advantage of minimal material damage. However water can cause certain damage to electronic equipment, making it suitable for detachable types of spiral elevators.


BaileAtha IElevators on the construction siteWhat problems should be paid attention to during operation



Emergency bolts not tightened; The solution is to tighten the emergency valve.

Hydraulic boarding axle; Streamline” The open hinge joint design increases the welding area by more than three times compared to ordinary tubular joints, effectively extending the service life and simplifying maintenance.

The seat belt needs to be inspected every six months, with a load of 225 kilograms. The test time is five minutes. After the test, check whether the seat belt is broken or deformed, and keep records of the experiment. Any unqualified seat belts should be immediately stopped from use.

Market trend.1: The rust on the spiral elevator is caused by some manufacturers' materials not being stainless steel. If rust is not severe, sandpaper can be used to polish and remove the rust. Professional improvement of quality assurance for aircraft manufacturers. The promotional activity is ongoing,BaileAtha I2 ton electric elevator, and new and old customers are welcome to come for consultation

Emergency bolts not tightened; The solution is to tighten the emergency valve.

What kind of function can be achieved by installing the elevator? Before installation, confirm whether the motor and elevator are intact, and strictly check whether the dimensions of each part connected to the motor and elevator match. Here are the dimensions and fit tolerances of the positioning boss, input shaft, and elevator groove of the motor.


BaileAtha IElevators on the construction siteWhat problems should be paid attention to during operation



Use a heavy crane to lift the cage and accurately position it from above the standard section; Place the two suspension cages on the guide rail frame and slowly place them on the buffer spring. Prepare the drive frames of the two suspension cages and adjust each back wheel and roller to a position with a large gap to facilitate the installation of the drive frame. Install a standard section on the basic part of the elevator using heavy equipment and tighten the connecting bolts. Install two sets of drive frames above each suspension cage using heavy equipment and thread the connecting pins, and install the cage top guardrail.

production.The method is that it may cause increased wear and inflexibility of the parts, and it is also important to pay attention to the installation precautions corresponding to the working environment and not be careless. Proper installation, use, and maintenance of elevators are important steps to ensure the normal operation of mechanical equipment. Therefore, when installing the elevator, please be sure to strictly follow the installation and use related matters below, and carefully assemble and use it.

The equipment operation is very simple, just press the operation button, and the height adjustment board of the equipment will automatically rise; Release the button, adjust the weight of the plate to fall, and the tongue plate can be used by placing it on the truck.

The size of the oil cylinder should be minimized as much as possible while meeting the design requirements. The smaller the size of the oil cylinder, the faster the lifting speed.

BaileAtha I.Use a heavy crane to lift the cage and accurately position it from above the standard section; Place the two suspension cages on the guide rail frame and slowly place them on the buffer spring. Prepare the drive frames of the two suspension cages and adjust each back wheel and roller to a position with a large gap to facilitate the installation of the drive frame. Install a standard section on the basic part of the elevator using heavy equipment and tighten the connecting bolts. Install two sets of drive frames above each suspension cage using heavy equipment and thread the connecting pins, and install the cage top guardrail.

The purpose of the hydraulic lifting platform allows users to choose the power mode and configuration according to their own usage range: the power system includes: DC power supply, single-phase or three-phase power supply,BaileAtha I20 meter mobile elevator, diesel engine.

The seat belt needs to be inspected every six months, with a load of 225 kilograms. The test time is five minutes. After the test, check whether the seat belt is broken or deformed, and keep records of the experiment. Any unqualified seat belts should be immediately stopped from use.