RotlingenScissor type elevatorWhat are the requirements of the project

announcer:hp323HP155335083 release time:2024-02-11 12:42:43

Fixed boarding bridge: A fixed boarding bridge is a specialized auxiliary equipment for achieving rapid loading and unloading of goods. Its height adjustment function uses a bridge between the truck and the cargo platform in the warehouse, and forklifts and other vehicles to move and batch goods inside the truck

The seat belt needs to be inspected every six months, with a load of 225 kilograms. The test time is five minutes. After the test, check whether the seat belt is broken or deformed, and keep records of the experiment. Any unqualified seat belts should be immediately stopped from use.

Rotlingen.Unique design; Work; The steel frame can withstand average pressure, effectively reducing the torsion of the frame, and has stronger durability.

This series of products has a load capacity of 0.1 to 0.8 tons, and can also be customized according to user requirements, with a load capacity of up to 10 tons.

.Curved arm elevator: a lifting device used for high-altitude operations, it can operate while walking, with a compact structure and flexible turning. The width of its site can ensure that the equipment enters narrow passages and crowded working areas. The backup power device can operate the work platform to reset, and is a convenient transportation method that can be towed to any place.

Teach you how to choose elevator cables. When choosing elevator cables,RotlingenElevating vegetable elevator, you should follow the following two principles: good electrical parameters; During the movement of the cable with the elevator there will be a section in the middle that undergoes bending deformation due to gravity, causing changes in electrical parameters such as impedance and distributed capacitance of the cable. Poor quality cables have significant parameter changes when subjected to force deformation,

A type of elevator equipment consisting of a walking mechanism, hydraulic mechanism, and support mechanism. The hydraulic oil forms a certain pressure by the vane pump, and enters the lower end of the hydraulic cylinder through an oil filter, explosion-proof electromagnetic directional valve, throttle valve, hydraulic control one-way valve, and balance valve, causing the hydraulic cylinder to move upwards and lift heavy objects. The return oil at the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve, and its rated pressure overflow valve is adjusted. The pressure gauge observes the reading value on the pressure gauge.


RotlingenScissor type elevatorWhat are the requirements of the project



Many people believe that the mechanical strength of the elevator itself is relatively high when using it, so during the installation process, there is no

The hydraulic system of the hydraulic boarding bridge has stable performance, high quality,RotlingenScissor lift, low maintenance rate, and is sturdy and durable.

The set pressure of the elevator price regulating valve is insufficient; The solution is to adjust the pressure valve. Professional elevator manufacturers have high pressure resistance, good waterproof performance, fire and high temperature resistance, strong overload capacity, corrosion resistance radiation resistance, and long service life

Installation materials.The elevator has a strong load-bearing capacity and is suitable for two people (who can carry a certain amount of weight tools and materials) to climb high at the same time; Various non-standard products can also be customized according to different environments to meet different needs.

Reset the brake; Installation and maintenance section. The maintenance section is generally installed in the fourth section. Long term promotion of downgrading manufacturers, 20 year old brand, with price advantages and guaranteed quality!

High altitude work requires the use of tool bags, and heavier and larger high-altitude work tools should be hung on stable components and cannot be placed randomly to avoid the occurrence of high-altitude falling accidents.


RotlingenScissor type elevatorWhat are the requirements of the project



Unscrew the screws on the dustproof hole on the outer side of the elevator flange, adjust the PCS system ring to align its side hole with the dustproof hole, and tighten the inner hexagon. Afterwards, it is easy for them to make mistakes and cause equipment malfunctions. Operators in this area need to patiently learn and pass training before they can operate and use them.

The boarding bridge can be divided into two forms: a mobile boarding bridge and a fixed boarding bridge. A brief introduction to the application scope of a fixed boarding bridge and the use of a mobile boarding bridge: used in places without loading and unloading platforms or where mobile loading and unloading of goods are required. If there is no loading and unloading platform at the logistics site, as a remedial measure, a mobile boarding bridge is a very suitable solution. The mobile boarding bridge is equivalent to a moving steel structure slope, and forklifts can also directly drive into the truck carriages for batch loading and unloading operations. Fast loading and unloading of goods can be achieved with only one person operating and without the need for power supply.

Rotlingen.Single column aluminum alloy elevator with easily recognizable operation panel, multiple mechanical, electrical, and hydraulic safety protection, and advanced integrated hydraulic electricity

Nowadays, elevators are widely used and are involved in many industries. The spiral elevator is no exception and has a very good effect. But sometimes the surface of the spiral elevator will rust, which has a certain impact on work efficiency and needs to be removed. So what is the solution to the surface rust of the spiral elevator?

In addition, it is strictly prohibited to use hammers or other tools during installation to prevent excessive axial or radial force from damaging bearings or gears. Be sure to tighten the installation bolts before tightening the tension bolts. Before installation, clean the anti rust oil on the motor input shaft, positioning boss, and elevator connection parts with gasoline or zinc sodium water. Its purpose is to ensure the tightness of the connection and the flexibility of operation and to prevent unnecessary wear and tear.