Hague15 meter elevatorBasic terminology

announcer:hp323HP155335083 release time:2024-01-22 15:59:49

According to different needs, different power modes can be selected, such as three-phase AC power supply, single-phase AC power supply, DC power supply, and internal combustion power supply. With manual hydraulic equipment, lifting operations can be carried out in places with power outages or no power supply, and components can be added. When the platform length is insufficient, it can be extended to the required direction, and then the operating power can be increased. It is a must-have product of modern large-scale construction and equipment, and a necessity for high-altitude safety and civilized production.

Check the hydraulic oil quality and level. When the lifting platform is raised to a high position, the hydraulic oil level should be 40-50 millimeters higher than the bottom of the oil tank. When the color of the hydraulic oil darkens,Hague8 meter mobile elevator, or there are foreign objects such as gravel in the oil, the hydraulic oil should be replaced in a timely manner. The hydraulic system of the lifting platform should be checked for hydraulic and pipeline connections. If the pipeline is damaged, it should be replaced immediately; When there is looseness in the connection part, tighten the pipe joint.

Hague.What is the new price for fixed elevators? Professional elevator manufacturers are safe, environmentally friendly, and economical! Our products are exported to foreign countries and highly trusted

The set pressure of the elevator price regulating valve is insufficient; The solution is to adjust the pressure valve. Professional elevator manufacturers have high pressure resistance, fire and high temperature resistance, corrosion resistance, radiation resistance,HagueSingle column hydraulic elevator, and long service life

.The elevator has a strong load-bearing capacity and is suitable for two people (who can carry a certain amount of weight tools and materials) to climb high at the same time; Various non-standard products can also be customized according to different environments to meet different needs.

When conducting high-altitude operations on dangerous edges such as roofs, suspension bridges, or cliffs, guardrails or safety nets should be installed on the side facing the air, or safety belts or ropes should be used.

The set pressure of the elevator price regulating valve is insufficient; The solution is to adjust the pressure valve. Professional elevator manufacturers have high pressure resistance, good waterproof performance, fire and high temperature resistance, strong overload capacity, corrosion resistance, radiation resistance, and long service life


Hague15 meter elevatorBasic terminology



The advantages and application fields of elevators and lifting platforms. The lifting mechanism is made of high-strength manganese steel giant tubes. Equipped with safety maintenance equipment to avoid overloading of elevators. Equipped with a safety maintenance valve to prevent hydraulic pipeline cracking. Equipped with emergency lowering equipment in case of power outage. This product is suitable for mobile high-altitude operations such as high-altitude equipment and maintenance in various industries.

Prepare the foundation according to the basic plan, pay attention to finding, leveling,Hague2 ton electric elevator, and aligning points, and ensure the level of the foundation and various usage requirements.

The loading and unloading mobile boarding bridge has become a very common structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to quickly enter and exit transportation vehicles for loading and unloading operations.

Statistics.Before connecting the motor to the elevator, the elevator manufacturer should first make the motor shaft keyway perpendicular to the tightening bolt. To ensure uniform force, please first screw on the installation bolts at any diagonal position, but do not tighten them. Then, screw on the installation bolts at the other two diagonal positions and tighten the four installation bolts one by one. Afterwards, tighten the tightening bolts. All tightening bolts require torque wrenches to be fixed and inspected according to the indicated fixed torque data. Elevators and lifting platforms are widely used special equipment for high-altitude operations. Its scissor fork mechanical layout ensures high stability after the elevator is lifted, with a wide operating range and high load-bearing capacity, making high-altitude operations increasingly large-scale and supporting multiple people working together. It makes high-altitude operations more powerful and safe. It is a widely used specialized equipment for high-altitude operations.

Preparation before folding and installation of the elevator. Carefully prepare a special construction plan for installation and provide safety technical disclosure to the installation personnel.

What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).


Hague15 meter elevatorBasic terminology



Single column aluminum alloy elevator: This series of products is indoor and widely used for high-altitude operations in various industries such as star hotels and large supermarkets. It has lifting balance, easy operation, and can enter general lobbies. It can enter and exit the elevator at will with low power consumption, no pollution, and does not harm the ground during work. It can be used for wall work and exploration work, and there are no dead corners during work. The single column aluminum alloy electric elevator, equipped with gantry cross frame accessories, is very suitable for maintenance work in cinemas, easy operation etc.

Test method.Single column aluminum alloy elevator: This series of products is indoor and widely used for high-altitude operations in various industries such as star hotels and large supermarkets. It has lifting balance and can enter general lobbies. It can enter and exit the elevator at will with low power consumption, no pollution, and does not harm the ground during work. It can be used for wall work and exploration work, and there are no dead corners during work. The single column aluminum alloy electric elevator, equipped with gantry cross frame accessories, is very suitable for maintenance work in cinemas, auditoriums, etc.

How to use a hydraulic elevator and whether the emergency stop device is effective is very important during use. If special circumstances arise, the emergency stop can be used. Therefore, before use, it is necessary to carefully check whether all items are normal and ensure the effectiveness of the braking device.

Reset the brake; Installation and maintenance section. The maintenance section is generally installed in the fourth section. Long term promotion of downgrading manufacturers, 20 year old brand, with price advantages and guaranteed quality!

Hague.What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).

Preparation before folding and installation of the elevator. Carefully prepare a special construction plan for installation and provide safety technical disclosure to the installation personnel.

Check the hydraulic oil quality and level. When the lifting platform is raised to a high position, the hydraulic oil level should be 40-50 millimeters higher than the bottom of the oil tank. When the color of the hydraulic oil darkens, the oil becomes sticky, or there are foreign objects such as gravel in the oil the hydraulic oil should be replaced in a timely manner. The hydraulic system of the lifting platform should be checked for hydraulic and pipeline connections. If the pipeline is damaged, it should be replaced immediately; When there is looseness in the connection part, tighten the pipe joint.