PwaviMobile hydraulic lifting platform/lifting platformConsumption policy must grasp the intensity and rhythm

announcer:hp695HP135175170 release time:2023-12-23 12:02:26

What are the advantages of installing a guide rail type elevator for goods? The advantages of civil engineering are easy to install: there is no need for a machine room above the shaft, and the top layer can be installed at a height of more than 5 meters. The computer room can be located within a radius of 15 meters of the shaft, occupying an area of only 3-4 square meters. The hydraulic elevator is not equipped with a counterweight device to improve the utilization rate of the shaft area. The load and load cylinder of the hydraulic elevator directly act on the foundation pit, and the strength requirement for the shaft is low. A brick structure or brick concrete structure shaft is sufficient.

What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame, and release the brake on the motor inside the suspension cage. (For SC200/200 models tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, first install the suspension cage before installing the drive plate).

Pwavi.Common problems and specific solutions during the operation of hydraulic boarding bridges: motor phase loss (motor does not move and there is a buzzing sound)

Working at heights is a common practice nowadays, but it also has a certain degree of danger. So people invented hydraulic lifting platforms, which are more convenient to help people complete high-altitude operations. However, people should also pay attention when using hydraulic lifting platforms, otherwise they can easily malfunction, which may lead to serious consequences. So what are the common faults of hydraulic lifting platforms?

.Familiarity with the usage process and without a doubt, this is the first thing to understand. There are two ways to understand it: first, carefully read the user manual provided by the manufacturer when the hydraulic lifting platform leaves the factory; The second is the equipment that needs to be installed. A professional installation technician will be dispatched to install the hydraulic lifting platform. After the installation is completed, relevant users will be trained on the operating process and safety precautions of the hydraulic lifting platform, and some maintenance matters in the future will also be explained; What should be paid attention to during the running-in period when using hydraulic lifting platforms? Check the wear of components. For newly processed and assembled components, there may be subtle deviations in shape and size that require a period of time for running-in. Therefore,PwaviSmall hydraulic lifting platform, during the running-in period, it is necessary to pay attention to whether there is any rapid wear. If there is any, the manufacturer of the hydraulic lifting platform should handle it in a timely manner to avoid equipment failure; Work between the pins and bearings to ensure that they are not worn, and add some engine oil or grease appropriately; Confirm if there is any noise during the running-in period. If it is found that the hydraulic lifting platform is noisy during operation, there is no need to worry in the early stage. If there are no major problems, run it several times more. After the running-in, the noise will naturally disappear. However, if there is noise for a long time and no signs of fading, please make sure to promptly produce it and solve the problem; Regularly check if the components are loose. Before use, check if there are any signs of looseness in screws, nuts, retaining rings, oil pipe joints, etc. If there are any, please reinforce or replace them in a timely manner to avoid accidents.

The seat belt needs to be inspected every six months, with a load of 225 kilograms. The test time is five minutes. After the test, check whether the seat belt is broken or deformed, and keep records of the experiment. Any unqualified seat belts should be immediately stopped from use.

Replace with new oil and do not intermittently use old oil, it should be immediately stopped for inspection. When the working pressure of the electric elevator is found to be too high or the sound is abnormal the elevator should be placed on a solid and flat ground to prevent tipping during operation. Press&quo; Rising; Or&quo; Descending; Press the button to frequently check and maintain the various components of the elevator when lifting the workbench. If the workbench does not move, it should be immediately shut down for inspection to avoid serious mechanical damage; Regularly check the working status of the shaft pin every month. If any loose shaft pin or screw is found, it must be locked tightly to prevent accidents caused by the shaft pin falling off.

Walking: assisted self-propelled, two wheel traction, self driving, and car modification. Professional scissor lift manufacturer with quality assurance, professionalism, timely supply, and high cost-effectiveness has become the preferred brand for many wire products. Welcome to purchase!

The sinking of a cargo elevator is a phenomenon where the table surface drops due to gravity after a certain period of time when it rises to a designated position. Of course, this problem is definitely abnormal. So how can we solve it? The first step is to identify the cause. Below, the editor summarizes the ultimate solution.

Honesty is the foundation.When encountering overheating in the hydraulic elevator motor, it is necessary to stop it in a timely manner, eliminate the fault, and continue running. The motor bearings should be in good condition.

Mobile elevators are generally used in skyscrapers where electric elevators are used, so fast elevators are needed. First go to the high-rise sky lobby (high-rise elevator lobby, Skylobby) from the ground, and then transfer to the ordinary elevator to the destination. Some new elevators use elevator pre calling systems,PwaviHandmade children's hydraulic lifting platform, which can pre call designated floors in the lobby. These passenger elevators can be decorated beautifully according to customer needs. Some passenger elevators are also equipped with air conditioning and television, while others are set up in the cabin, so that customers can enjoy the scenery outside while riding.

Construction elevators are commonly used in industrial or construction sites in our daily lives, mainly for transporting people and goods. We can effectively use construction elevators to improve the efficiency of operations and greatly reduce the workload of operators. So, how should we inspect the construction site of construction elevators? You know?


PwaviMobile hydraulic lifting platform/lifting platformConsumption policy must grasp the intensity and rhythm



When encountering overheating in the hydraulic elevator motor, it is necessary to stop it in a timely manner, eliminate the fault and continue running. The motor bearings should be in good condition.

Quality improvement.After entering winter, elevators are prone to some small problems and malfunctions, which requires users to perform seasonal maintenance and upkeep on the elevator. Below, the editor will briefly introduce the winter maintenance precautions and key points of the elevator.

Check the one-way valve in the valve group for natural lowering of the lifting platform. If dirt is found on the sealing surface of a single valve, clean the one-way valve.

Each department's electric brush should be kept clean, and the brush pressure should be adjusted to ensure that its area is not less than 50%

Pwavi.Remove and disassemble the lowering valve, blow the valve core clean with compressed air, mobile boarding bridge merchants are increasingly interested in using boarding bridges to provide customers with the appearance of hydraulic boarding bridges, and the demand for boarding bridges is also increasing. However,PwaviCan hydraulic pressure automatically lift and lower, there are not many manufacturers of corresponding boarding bridges. Many boarding bridges are made of leather bags, and they do not produce them themselves, resulting in high prices. What is important is that they do not have a good understanding of the technology of car exhibition booths. When passing on direct customer technical requirements to the manufacturers, there are often deviations. Therefore, customers who purchase boarding bridges can directly find professional manufacturers. When choosing a boarding bridge, the first thing to consider is the range of use, frequency of work utilization, rated weight, and other factors of the product, excellent performance, and complete equipment, it can be chosen at a reasonable price.

When installing, disassembling, and adjusting the rotating mechanism, it is important to ensure that the centerline of the reducer of the rotating mechanism is parallel to the centerline of the gear, and its meshing surface is not less than 70%. The meshing clearance should be suitable.