HagueAluminum alloy hydraulic lifting platformWelcome to inquire

announcer:hp695HP135175170 release time:2023-12-17 12:27:55

Today, the sudden cooling in Shandong has caught office workers and people off guard. Friends, as the hometown of elevators in China. There are countless manufacturers of all sizes. So, how to maintain and maintain the lifting stage and elevator after entering winter. Below is a detailed introduction from the editor.

Each box, distribution box, etc. is usually kept clean, and dust on electrical equipment should be quickly swept away.

Hague.Dirty normally closed valve; The solution is to remove the normally closed valve and use cleaning agent or cleaning. Long term scissor fork lift manufacturers have a complete range of products, excellent quality, and discounted prices

Do not adjust the solenoid valve on the motor arbitrarily. The solenoid valve is pre adjusted before leaving the factory, it can shorten the service life of the motor.

.When working in a hot environment, pay attention to heat dissipation.

The application scenarios of mobile elevators may require several or even dozens of passenger elevators in some office buildings and hospitals. In order to increase the speed, efficiency and usable area of electric elevators, most high-rise buildings will divide electric elevators into arrays, with each group responsible for a portion of the floors, and make different adjustments and scheduling based on the usage mode of different floors at different times.

Guide rail type cargo elevators are a type of equipment for transporting heavy objects up and down, and have great applications in factories, workshops, its daily maintenance and upkeep are very important, because some small details can have a significant impact on the operation safety of the equipment if not paid attention to. Therefore,HagueProfessional hydraulic lifting platform,HagueMobile hydraulic lifting table supply, attention should be paid to the daily maintenance of cargo elevators.


HagueAluminum alloy hydraulic lifting platformWelcome to inquire



The seat belt needs to be inspected every six months, with a load of 225 kilograms. The test time is five minutes. After the test, and keep records of the experiment. Any unqualified seat belts should be immediately stopped from use.

System: Anti type electronic control system, remote control system PIC system.

The power unit adjustment, whether it is a scissor type lifting platform or a guide rail type lifting cargo elevator,HagueSelf propelled hydraulic lifting platform, is composed of the power unit and the oil cylinder. The power unit has four outlets during production, which can be adjusted to increase or decrease the hydraulic oil flow rate of the oil cylinder. We can adjust the motor speed or the electro-hydraulic proportional valve to adjust the hydraulic oil flow rate; What factors will affect the lifting speed of hydraulic elevators? The longer the hydraulic oil pipe, the longer the lifting time. Therefore, during installation, the length of the oil pipe should be minimized as much as possible within the allowable range of the design; On the basis of adjusting the power unit, the size of the oil pipeline can also be adjusted, and corresponding adjustments can be made while ensuring that the equipment meets normal demand and safety.

Finance Department.Each department's electric brush should be kept clean, and the brush pressure should be adjusted to ensure that its area is not less than 50%

Check the rollers, intermediate shafts, and bearings; Oil cylinder pin and bearing; Equality and wear of the hinge shaft and bearings of the boom; Add oil to the above components for maintenance of outdoor elevators and factory elevators. Extend the service life of bearings.

What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).


HagueAluminum alloy hydraulic lifting platformWelcome to inquire



High altitude work is now also very common, and elevators are also highly demanded by the market. Many high-rise transportation tasks are completed by elevators, with high efficiency and reassuring safety. However, attention should also be paid to the installation of the elevator, otherwise there may be problems, and no one wants to see such a situation happen. What are the installation precautions for elevators?

Affordable price.Firstly, it is necessary to use and operate the elevator correctly. The operators should receive systematic operation training: regular inspection of operating standards should be conducted, and any violations of the elevator operation should be punished immediately. In severe cases, they should be transferred from this position. Since the passing of

Whether it is a large machinery with complex structure or a small to medium-sized equipment with simple structure, the maintenance work scope is mainly focused on cleaning, adjustment, fastening, and corrosion prevention, commonly referred to as" Cross homework”.

When working at heights exceeding 1.5 meters, safety nets or safety belts must be used. Specializing in the production of scissor type elevators, a 20 year old brand with competitive prices and guaranteed quality!

Hague.The inconsistent rotation axis of the support rod in the middle of the hydraulic lifting platform results in the lifting platform being unable to function properly, causing serious damage to the platform and causing the table to tilt. Please carefully check that the general shear type high-altitude work platform was not strictly tested for tilt before leaving the factory, and was put into the market, causing many accidents. For small enterprises they are not very concerned about this aspect of tilt detection, This is also why there are such a large number of lifting equipment with this problem. The problems with the oil cylinder and power unit system are often due to insufficient power and substandard oil cylinder quality which are also very important issues for enterprises themselves.

Remove and disassemble the hydraulic lift cargo elevator lowering valve, blow out the plunger with compressed air, then install it and reinstall it.

Elevator customers all have overloaded use of elevators. Although elevators have a large overload capacity in design, the hidden dangers brought by such use are very large, which can easily cause damage such as oil cylinder roof fall and elevator bracket deformation. So it should be summarized as follows: Maintenance of elevators must be equipped with full-time elevator operators who have undergone on-the-job training, and illegal operation and use are strictly prohibited.