LeipzigSmall hydraulic lifting platformHow to perform maintenance during the season

announcer:hp695HP135175170 release time:2023-11-12 20:45:17

open the oil tank

Drain all the hydraulic oil in the oil tank, take out the oil suction filter, clean it, and return it to the oil tank. Install it in its original position. Fill the fuel tank with new oil.

The reduction gearbox, gearbox, external meshing gear and other parts, as well as the hydraulic oil, are all carried out according to the requirements in the table. Professional scissor lift manufacturer with high prices, on-site settlement, and honest operation!

Leipzig.Check the circuit breaker and motor wiring. Long term manufacturer of scissor fork lifts, a 20 year old brand with competitive prices and guaranteed quality!

Before installing the elevator bearings,Leipzig6-meter hydraulic lifting platform, do not open the packaging too early. This can easily lead to premature bearing contamination, which can lead to premature bearing damage. Additionally, ensure that the installation environment is clean and do not bring iron filings dust, Prolonged use can also affect the running in between bearings and other objects into the bearings. Even small dust particles can cause premature bearing damage, leading to a decrease in the lifespan of the elevator.

.Guide rail type cargo elevators are a type of equipment for transporting heavy objects up and down, and have great applications in factories, workshops, and other places. For this type of heavy machinery, its daily maintenance and upkeep are very important, because some small details can have a significant impact on the operation safety of the equipment if not paid attention to. Therefore, attention should be paid to the daily maintenance of cargo elevators.

It is strictly prohibited to connect the motor of the lifting platform to the wrong power supply. It should be ensured that the voltage is 380V or 220V, and daily cleaning work should be carried out. Dust and debris on the motor should be cleaned in a timely manner.

When using the distribution box, the electric leakage switch meets the requirements for construction elevators. If the fixed elevator installed is variable frequency, the selection of the leakage switch should be compatible with the frequency converter.


LeipzigSmall hydraulic lifting platformHow to perform maintenance during the season



The contact opening and closing of the travel switch of each safety device must be reliable,LeipzigHydraulic lifting table, and the contact crater should be polished in a timely manner.

The hydraulic pipeline is probably congested. The hydraulic pipeline is also a particularly important key, checking whether the hydraulic pipeline is smooth. Focus on checking whether there are signs of congestion or jamming in various hydraulic valves, including one-way stop valves, electromagnetic directional valves,LeipzigImported hydraulic lifting platform, proportional control valves, overflow valves, etc. If there are problems, the hydraulic valve should be cleaned or replaced in a timely manner, as the hydraulic oil may deteriorate or contain impurities. After the hydraulic oil is permanently used, there may be impurities or deterioration in the hydraulic oil. Take a sample for inspection to see if it contains fluid particles, discoloration, or odor. If necessary, replace the hydraulic oil.

High altitude work requires the use of tool bags, and heavier and larger high-altitude work tools should be hung on stable components and cannot be placed randomly to avoid the occurrence of high-altitude falling accidents.

High quality brand.When using the distribution box, the electric leakage switch meets the requirements for construction elevators. If the fixed elevator installed is variable frequency, the selection of the leakage switch should be compatible with the frequency converter.

Each box, distribution box, etc. is usually kept clean, and dust on electrical equipment should be quickly swept away.

What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).


LeipzigSmall hydraulic lifting platformHow to perform maintenance during the season



Regular inspection and maintenance, eliminating hidden dangers, and troubleshooting are beneficial for improving work efficiency, extending equipment service life, and ensuring the safety performance of elevators.

Focus on Development.During use, the elevator should be placed on a solid and flat ground to prevent tipping during operation. Press&quo; Rising; Or&quo; Descending; Press the button to frequently check and maintain the various components of the elevator when lifting the workbench. If the workbench does not move, it should be immediately stopped for inspection. When the working pressure of the electric elevator is found to be too high or the sound is abnormal, it should be immediately shut down for inspection to avoid serious mechanical damage; Regularly check the working status of the shaft pin every month. If any loose shaft pin or screw is found, the winding will not only overheat severely, but also burn out. When a star connected motor is mistakenly connected into a triangle, or a motor with multiple coil groups connected in series into a branch is mistakenly connected into two parallel branches, it will cause the winding and iron core to overheat, and in severe cases, the winding will be burned out.

Remove and disassemble the hydraulic lift cargo elevator lowering valve, blow out the plunger with compressed air, then install it and reinstall it.

Leipzig.The sinking of a cargo elevator is a phenomenon where the table surface drops due to gravity after a certain period of time when it rises to a designated position. Of course, this problem is definitely abnormal. So how can we solve it? The first step is to identify the cause. Below, the editor summarizes the ultimate solution.

Regularly check whether the operation of each mechanism is normal and whether there is any noise. If any faults are found, they must be promptly eliminated. For a long time, and the price is 20% higher than the market value! More than one ton is more expensive!

Drain and discard the hydraulic oil from the hydraulic lifting cargo elevator. For the outdoor guide rail elevator, tighten the joint and remove the oil filter. After cleaning, clean it with compressed air, and then return it to the oil tank and connect the pipeline.