HuairenCustomized hydraulic lifting platformPermeability testing management

announcer:hp695HP135175170 release time:2024-06-16 15:41:14

Regularly check all wires and cables for damage. Timely bandage and replace damaged parts. Various scissor lift manufacturers have formal qualifications. Welcome to inquire by phone and sincerely invite cooperation!

The daily maintenance of guide rail type cargo elevators should ensure that the transmission position where the grease nipple is located needs to be lubricated twice a month. For areas where grease cannot be added, it is necessary to clear the oil circuit or replace the grease nipple until butter can be added. Otherwise, it is prohibited to use the equipment.

Huairen.Readjust the overflow valve when the pressure is low. Adjust the oil level to be too low at 100% rated load, fill the hydraulic oil with suction oil, filter the blockage, and clean the oil suction section of the filter for air leakage. Check the oil suction pipe and joints; Tighten the joint. Replace the connector if necessary.

The hook of the seat belt should not be hung on unstable or moving objects. High priced and various specifications of scissor lift manufacturers provide timely supply, with high cost-effectiveness, and have become the preferred brand for many wire products. Welcome to purchase!

.The application scenarios of mobile elevators may require several or even dozens of passenger elevators in some office buildings and hospitals. In order to increase the speed, efficiency, and usable area of electric elevators, most high-rise buildings will divide electric elevators into arrays,HuairenLifting platform hydraulic pressure, with each group responsible for a portion of the floors, and make different adjustments and scheduling based on the usage mode of different floors at different times.

After entering winter, elevators are prone to some small problems and malfunctions, which requires users to perform seasonal maintenance and upkeep on the elevator. Below, the editor will briefly introduce the winter maintenance precautions and key points of the elevator.

Do not adjust the solenoid valve on the motor arbitrarily. The solenoid valve is pre adjusted before leaving the factory, and random adjustment can easily cause internal pressure to increase or decrease. In severe cases, it is necessary to clear the oil circuit or replace the grease nipple until butter can be added. Otherwise, it is prohibited to use the equipment.

When using the hydraulic lifting platform, it is also necessary to check for overheating, as this equipment is equipped with a motor. If the motor is overheated, it may cause damage to the motor. However, replacing a motor is relatively expensive. Therefore, during driving or trial operation,HuairenFixed electric hydraulic lifting platform, if the motor is found to be overheated, it should be stopped immediately, and then the fault that caused the motor to overheat should be checked and eliminated, Only then can the machine continue to be used.

Remove and disassemble the hydraulic lift cargo elevator lowering valve, blow out the plunger with compressed air, then install it and reinstall it.

Superior quality.Elevators are now very popular among people and can easily transport goods to high-rise buildings. Among them, hydraulic elevators are more popular among people, and people can choose the one that suits them according to their actual situation. However, during normal work, and the brush pressure should be adjusted to ensure that its area is not less than 50%. Specializing in product and renewable resource business, including: scissor lift manufacturers

Regular inspection and maintenance, eliminating hidden dangers, extending equipment service life, and ensuring the safety performance of elevators.


HuairenCustomized hydraulic lifting platformPermeability testing management



Installing bearings for elevators may seem simple but it is also important to pay attention to some details, such as: it is actually difficult to thrust bearings into the shaft pins when excessively installing them. However, sometimes some people may think of using a hammer to hammer the bearings for convenience, directly hitting the bearings with a hammer can cause significant damage to the bearings and use brute force during installation. In fact, which is the main reason for bearing damage and reducing the service life of the bearings. So when installing bearings, we can place some soft cloth or cardboard on top of them before installing them.

demand.Pay attention to checking each steel wire rope for broken wires and loose strands. If it exceeds the relevant regulations, it must be replaced immediately. The maintenance and upkeep of steel wire ropes should strictly follow the 85 regulations.

System: Anti type electronic control system, remote control system, PIC system.

When personnel enter the interior of the lifting platform for maintenance of outdoor elevators, they must hang the elevator to prevent sudden lowering of the platform and causing casualties.

Huairen.Familiarity with the usage process and without a doubt, this is the first thing to understand. There are two ways to understand it: first, carefully read the user manual provided by the manufacturer when the hydraulic lifting platform leaves the factory; The second is the equipment that needs to be installed. A professional installation technician will be dispatched to install the hydraulic lifting platform. After the installation is completed, and some maintenance matters in the future will also be explained; What should be paid attention to during the running-in period when using hydraulic lifting platforms? Check the wear of components. For newly processed and assembled components, there may be subtle deviations in shape and size that require a period of time for running-in. Therefore, during the running-in period, it is necessary to pay attention to whether there is any rapid wear. If there is any, the manufacturer of the hydraulic lifting platform should handle it in a timely manner to avoid equipment failure; Work between the pins and bearings to ensure that they are not worn, and add some engine oil or grease appropriately; Confirm if there is any noise during the running-in period. If it is found that the hydraulic lifting platform is noisy during operation, there is no need to worry in the early stage. If there are no major problems, run it several times more. After the running-in the noise will naturally disappear. However, if there is noise for a long time and no signs of fading, please make sure to promptly produce it and solve the problem; Regularly check if the components are loose. Before use, check if there are any signs of looseness in screws, nuts, retaining rings, oil pipe joints, etc. If there are any, please reinforce or replace them in a timely manner to avoid accidents.

Operating cost advantage: Low failure rate. Due to the use of advanced hydraulic systems and good methods,HuairenHydraulic lifting platform, the failure rate of elevator operation can be minimized. Low power consumption: When the hydraulic elevator descends, it is driven by the pressure generated by its own weight, which greatly saves energy.

What are the pressures on lifting platforms? The movement of lifting platforms has always been a concern for us. Our usage scenarios are uncertain, and most of them are part-time workers. Therefore, in order to better attract customers, we are constantly researching mobile lifting platforms to meet different needs. However, for some large logistics or enterprise processing plants, we are still accustomed to using fixed elevators, He has a huge load capacity and strong stability, which can meet the needs of many customers, which is also the use of lifting platforms in China in recent years.