Roermond Scissor fork hydraulic lifting tableIncrease in market inventory

announcer:hp695HP135175170 release time:2024-05-21 14:52:13

Construction elevators are commonly used in industrial or construction sites in our daily lives, mainly for transporting people and goods. We can effectively use construction elevators to improve the efficiency of operations and greatly reduce the workload of operators. So, how should we inspect the construction site of construction elevators? You know?

Today, the sudden cooling in Shandong has caught office workers and people off guard. Friends, be sure to add more clothes when going out. Shandong as the hometown of elevators in China. There are countless manufacturers of all sizes. So, how to maintain and maintain the lifting stage and elevator after entering winter. Below is a detailed introduction from the editor.

Roermond .A sign of slowing down has occurred. After the speed slows down, consider the hydraulic oil flow rate first. The factors that affect hydraulic oil flow include: hydraulic pipelines, hydraulic valves, hydraulic oil pumps, motor speed control assembly, etc. The following editor will introduce to you the four reasons for the slower speed and the mediation methods.

The daily maintenance of guide rail type cargo elevators should ensure that the transmission position where the grease nipple is located needs to be lubricated twice a month. For areas where grease cannot be added, it is necessary to clear the oil circuit or replace the grease nipple until butter can be added. Otherwise, it is prohibited to use the equipment.

.Maintain a smooth access road for external construction elevators and sufficient parking space for equipment. When using a crane for auxiliary installation, full consideration should be given to whether the on-site environment meets the operating conditions of the crane.

Good stability: The overflow valve can prevent excessive system pressure during upward movement. Emergency manual valve: In case of power failure, it can cause the elevator car to descend to the nearest floor position and open the door. Manual pump: When the system malfunctions, the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature drops.

Carefully prepare a special construction plan for installation and provide technical disclosure to the installation personnel. I have been engaged in various types of scissor lift manufacturers and other materials for many years, and operate with integrity. Welcome to call!


Roermond Scissor fork hydraulic lifting tableIncrease in market inventory



The hook of the seat belt should not be hung on unstable or moving objects. High priced and various specifications of scissor lift manufacturers provide timely supply, with high cost-effectiveness, and have become the preferred brand for many wire products. Welcome to purchase!

How should we extend the service life of hydraulic lifting platforms? In order to prolong the service life of such machinery and equipment, it is necessary to regularly inspect and maintain the equipment during use. For example, it is necessary to regularly check whether these switches can be used normally and whether the switch points are in good condition during use. There will be an electrical box and distribution box inside the elevator and these devices are prone to dust accumulation outside. If the dust accumulates too much, it may cause rust on the outside of the electrical box. Therefore when using them, it is necessary to regularly remove the dust on the outside of various boxes. Generally, mainly for transporting people and goods. We can effectively use construction elevators to improve the efficiency of operations and greatly reduce the workload of operators. So, how should we inspect the construction site of construction elevators? You know?

management.When using the distribution box, the electric leakage switch meets the requirements for construction elevators. If the fixed elevator installed is variable frequency, the selection of the leakage switch should be compatible with the frequency converter.

Preparation before folding and installation of the elevator. Carefully prepare a special construction plan for installation and provide safety technical disclosure to the installation personnel.

Use a heavy crane to lift the cage and lift it from above the standard section


Roermond Scissor fork hydraulic lifting tableIncrease in market inventory



When working in a hot environment, pay attention to heat dissipation.

Analysis project.The boxes and distribution boxes of hydraulic elevators should be kept clean regularly, and dust on electrical equipment should be promptly cleaned.

System: Anti type electronic control system, remote control system, PIC system.

Avoid, especially during storage. Store in a cool and dry place, and avoid rainy and snowy weather during work.

Roermond .What are the advantages of installing a guide rail type elevator for goods? The advantages of civil engineering are easy to install: there is no need for a machine room above the shaft,Roermond Customized hydraulic lifting platform,Roermond Hydraulic lifting platform for loading,Roermond Customized hydraulic lifting platform, and the top layer can be installed at a height of more than 5 meters. The computer room can be located within a radius of 15 meters of the shaft, occupying an area of only 3-4 square meters. The hydraulic elevator is not equipped with a counterweight device to improve the utilization rate of the shaft area. The load and load cylinder of the hydraulic elevator directly act on the foundation pit, and the strength requirement for the shaft is low. A brick structure or brick concrete structure shaft is sufficient.

Are there any damages to the wires and cables of the department. We need to quickly bandage and replace the damaged department.

Firstly, it is necessary to use and operate the elevator correctly. The operators should receive systematic operation training: regular inspection of operating standards should be conducted, and any violations of the elevator operation should be punished immediately. In severe cases, they should be transferred from this position. Since the passing of