LiaoningFixed hydraulic elevatorUse guide

announcer:hp695HP135175170 release time:2024-03-31 13:01:34

Installing bearings for elevators may seem simple, but it is also important to pay attention to some details, such as: it is actually difficult to thrust bearings into the shaft pins when excessively installing them. However, sometimes, some people may think of using a hammer to hammer the bearings for convenience,LiaoningElectric hydraulic fixed lifting platform, and use brute force during installation. In fact, directly hitting the bearings with a hammer can cause significant damage to the bearings, we must not go too far. Fortunately, we can place some soft cloth or cardboard on top of them before installing them.

The hook of the seat belt should not be hung on unstable or moving objects. High priced and various specifications of scissor lift manufacturers provide timely supply, with high cost-effectiveness, and have become the preferred brand for many wire products. Welcome to purchase!

Liaoning.Having a high social status, it has now become an irreplaceable part of our mainstream goods. And the hydraulic pump station is the heart position of the lifting machinery, which extremely tests the professionalism and attention of the operator. It is our common responsibility to inspect it and ensure the daily use of machinery. Let's take a look at several common sense issues: the elevator manufacturer's point is to ensure the correctness of the power connection, and there should be no misconnection or leakage; Pay attention to cleaning work in daily life and do not allow stains to corrode it; When standing still, regular maintenance should be carried out to prevent the impact of rain and snow weather; Overloading is the first thing that operators must comply with; Iron Law&# quo;; The adjustment of the solenoid valve cannot be done arbitrarily and must be checked and certified by a professional organization; Especially when conducting outdoor operations under high temperatures, it is necessary to always pay attention to the abnormalities of the pump station; It is very normal for us to encounter some problems when using hydraulic boarding bridges, as long as these problems are not very serious, we don't have to worry too much. However, when there is a problem with the hydraulic boarding bridge, only a timely solution is the correct response. Below is an introduction to some common faults of the hydraulic boarding bridge and specific solutions: the hydraulic boarding bridge must be repaired while hanging and supporting the working platform of the lifting platform to avoid sudden descent of the lifting platform, it may cause abnormal operation of the hydraulic system, causing unnecessary damage to people, machines, and objects; Non professional personnel are not allowed to disassemble electrical appliances at will to prevent electric shock or incorrect connection.

The daily maintenance of guide rail type lifting equipment should pay attention to regular inspection and maintenance, eliminate hidden dangers, eliminate faults, and achieve these benefits for improving work efficiency extending equipment service life, and ensuring the safety performance of the elevator.

.When working at heights exceeding 1.5 meters,LiaoningHydraulic aluminum alloy lifting platform, safety nets or safety belts must be used. Specializing in the production of scissor type elevators, a 20 year old brand with competitive prices and guaranteed quality!

The lifting platform has been inspected and debugged before leaving the factory, and all technical indicators meet the design requirements. When in use, only the power supply needs to be connected,LiaoningCylinder mounted hydraulic lifting platform, and the hydraulic and electrical systems basically do not need to be adjusted.

The correct construction inspection of the airport is to first inspect the foundation to see if there is any water accumulation and to see if the grounding system meets the requirements. We also need to see how the structural bolts of this frame are tightened, and whether there are any cracks in the welds. We need to set them according to the instructions. In mechanical transmission it can be divided into two types: open type and closed type. Of course, it is necessary to clear the oil circuit or replace the grease nipple until butter can be added. Otherwise, it is prohibited to use the equipment.

Hydraulic pump station: domestic lifting platform dedicated pump station, Italian imported pump station with external protective devices: organ m type, mesh type, and iron plate sealed type.

When working at heights exceeding 1.5 meters, safety nets or safety belts must be used. Specializing in the production of scissor type elevators, a 20 year old brand with competitive prices and guaranteed quality!

Product range.Guide rail type cargo elevators are a type of equipment for transporting heavy objects up and down, and have great applications in factories, workshops, and other places. For this type of heavy machinery, its daily maintenance and upkeep are very important, because some small details can have a significant impact on the operation safety of the equipment if not paid attention to. Therefore, attention should be paid to the daily maintenance of cargo elevators.

How to install and use the bearings of the elevator? During the process of using the bearing device of the elevator we cannot always ensure that the bearing device has the right orientation, which inevitably leads to some devices not being in place or bearing displacement. Once these problems occur in the device, it will cause the clearance between the bearings to become too small, and then make it impossible for the inner and outer rings of the bearings to be in the same rotation center. So it is necessary to use specialized tools when installing bearings, and in the future, it is also necessary to use a testing instrument to test the bearing installation, in order to ensure the success of the bearing installation.

Maintain a smooth access road for external construction elevators and sufficient parking space for equipment. When using a crane for auxiliary installation, full consideration should be given to whether the on-site environment meets the operating conditions of the crane.


LiaoningFixed hydraulic elevatorUse guide



What are the pressures on lifting platforms? The movement of lifting platforms has always been a concern for us. Our usage scenarios are uncertain, and most of them are part-time workers. Therefore, in order to better attract customers, we are constantly researching mobile lifting platforms to meet different needs. However, for some large logistics or enterprise processing plants, we are still accustomed to using fixed elevators, He has a huge load capacity and strong stability, which can meet the needs of many customers, which is also the use of lifting platforms in China in recent years.

Click to view.Regularly check the connection of each part of the hydraulic elevator, and tighten it if there is any looseness. The tightness of the body connecting bolts should be checked when the body is under pressure, and all connecting shafts must have split pins and be sufficient.

The brake operators of each mechanism on the equipment should regularly inspect and adjust the clearance of the brake pads and wheels, ensuring flexibility and reliability.

Regular refueling is necessary for maintenance of the elevator: During the use of the elevator, due to the large load, there is also significant friction between various components especially the elevator chain and elevator shaft pins. It is necessary to ensure that an appropriate amount of oil is added before each use to ensure flexibility and non jamming during operation. If the elevator is in operation and once&quo; appears; Squeak and Squeak&# quo; The friction sound can be basically determined to be due to a lack of oil in the elevator. It is necessary to immediately stop working and investigate the cause, and cannot forcibly operate, which can easily cause unforeseeable hidden dangers. Summary: Regular refueling is not allowed when maintaining the elevator.

Liaoning.The size of the oil cylinder should be minimized as much as possible while meeting the design requirements. The smaller the size of the oil cylinder, the faster the lifting speed.

Regularly check whether the operation of each mechanism is normal and whether there is any noise. If any faults are found, they must be promptly eliminated. For a long time, and the price is 20% higher than the market value! More than one ton is more expensive!

Remove and disassemble the lowering valve, blow the valve core clean with compressed air, and then reinstall it.