ProvAluminum alloy double column lifting platformCapacity effectiveness

announcer:hp275HP127226562 release time:2024-04-15 10:26:44

When the lifting base plate descends, the safety net below immediately stops running and descends when encountering obstacles.

The lifting foundation of the platform is a large structural component made of alloy steel plates with different thicknesses that are welded together. The welding amount is large, the structural shape is complex, it is necessary to perform stress relief treatment on the completed components.

Prov.Ensure that power cables and electrical circuits are not damaged

02 The lifting platform adopts a fully hydraulic lifting mechanism, which can be operated inside the platform bucket and on the elevator body. 03 The working arm of the lifting platform can rotate 360 degrees. 04 The hydraulic system is equipped with a safety valve to prevent the main arm oil cylinder oil pipe from cracking. 05 The hydraulic legs are equipped with a hydraulic locking device to prevent the leg oil cylinder from retracting. 06 The hydraulic system is equipped with an automatic platform overload protection device, In order to ensure the safety of operators, each section of the working arm on the platform 07 is equipped with safety limit devices. The hydraulic system seals on the platform 08 are all well-known domestic and foreign brands, and the power of the entire vehicle 09 is a diesel engine with its own power supply. The power supply can also be used. The hydraulic lifting platform is equipped with an emergency lowering device in case of power outage. The 11 folding arm lifting platform product can also use a 50Hz, 380V power motor, and diesel engine dual power.

.Low failure rate: Due to the use of advanced hydraulic systems and good methods, the failure rate of elevator operation can be minimized. Low power consumption: When the hydraulic elevator descends, it is driven by the pressure generated by its own weight, which greatly saves energy.

According to GB/T25712-2010, when one of the following situations occurs in the curve related to the aging frequency it can be determined that the area covered by the effective zone of the vibration mode at that frequency has reached the aging effect: the curve rises and flattens; The curve rises, then falls, and then flattens; The resonance frequency of the a-n curve after vibration is lower than that before vibration; The bandwidth of the a-n curve after vibration narrows compared to before vibration; The resonance peak of the a-n curve after vibration exhibits fission phenomenon; The curve flattens out after descent.

The selection of vibration pickup points refers to the placement point of the sensor, which is used to measure the vibration amplitude of the workpiece. According to GB/T25712-2010, the acceleration sensor should be placed on the workpiece with a certain rigidity and a large amplitude, and its testing direction should be adjusted to be perpendicular to the plane where the effective zone of the vibration mode is located. Considering the complex structure of the lifting foundation workpiece and the uneven thickness of each component, the vibration pickup point is set in a thick area in the middle of the component.


ProvAluminum alloy double column lifting platformCapacity effectiveness



Drivers should be responsible for supervising the uniform distribution of items transported by the platform on the platform as much as possible to prevent partial loading and prohibit overloading. flat

Check the wear and clearance condition of the guide wheel of the cargo elevator

The selection of vibration pickup points refers to the placement point of the sensor, which is used to measure the vibration amplitude of the workpiece. According to GB/T25712-2010, the acceleration sensor should be placed on the workpiece with a certain rigidity and a large amplitude, and its testing direction should be adjusted to be perpendicular to the plane where the effective zone of the vibration mode is located. Considering the complex structure of the lifting foundation workpiece and the uneven thickness of each component, the vibration pickup point is set in a thick area in the middle of the component.

management.Firstly, it is necessary to start from the source. The current technology is relatively advanced. When manufacturing aluminum alloy lifting platforms, which steel should be chosen for production? Because there are many corrosion-resistant steel materials now, adding chromium, nickel, etc. to ordinary steel to make stainless steel changing the internal structure of the metal to prevent rust.

Heavy load capacity: protective plate form: 90° Or 180° Interchangeable configuration rocker working angle: 75° Drive method: hydraulic power unit drive or screw drive.

Vibration aging treatment and effect judgment: According to the aging process plan, after setting the support points and vibration pickup points of the workpiece, use a rigid fixture to fix the exciter on the workpiece, and use the manual function of the equipment to test the vibration. It is determined that around 5300 revolutions is the resonance frequency of the component. The amplitude generated by the eccentric gear of the exciter in the fourth gear can meet the vibration processing requirements of the foundation seat, and the layout principle is: when the aspect ratio of the component is greater than 2, it is advisable to use or 4-point support.

Sampling inspection.Drivers should be responsible for supervising the uniform distribution of items transported by the platform on the platform as much as possible to prevent partial loading and prohibit overloading. flat

The frequency conversion system circuit of the construction elevator is mainly composed of two parts: the main circuit and the circuit. The main circuit mainly consists of a construction lifting cargo elevator (hereinafter referred to as the lifting cargo elevator) driven by a more complex rectifier. Before installation, all the eccentric roller shafts of the lifting cage and driving mechanism are loosened or adjusted to a large eccentricity, and the lifting cage and driving mechanism are installed in the guide rail frame respectively, power on the suspension cage until it rises 1m above the ground or detaches from the ground buffer spring (or support), the adjustment and sequence are as follows: 1. Use a special wrench to rotate the lower double (single) pendulum eccentric shaft to adjust the eccentricity to maintain the installation surface of the mechanism perpendicular to the horizontal plane,ProvPrice of 10 ton mobile boarding bridge, and make the upper and lower pendulum wheels evenly guide the rails at the same time. Rotate each wheel body by hand to check if it evenly presses the rails; 2. Use a special wrench to rotate the eccentric shaft of the gear rack back pressure wheel to adjust the side clearance during gear rack meshing. When adjusting, use a feeler gauge to measure the side clearance to 0.2; Between 0.5mm, each pressing wheel should evenly press on the back of the rack. Move each wheel body by hand to check if it evenly presses against the tooth back. Similarly, adjust the guide rollers on both sides of the guide rail. The adjustment key is to adjust the guide wheel on one side of the guide rail to lightly press it onto the guide rail. When moving the wheel body by hand, it should be possible to rotate but there should be obvious obstruction; The roller on the other side should maintain a clearance of 0.2-0.5 ram with the guide rail; 4. Adjust the lifting cage according to the above and sequence. If the driving mechanism and the lifting cage are integrated into the lifting cargo elevator, the lifting cage should be adjusted according to the and sequence of adjusting the driving mechanism. Conduct a visual inspection of the operation of each roller, and use the lead pressing method and coloring method to check the meshing of the gear pair; Fine tune 6 pairs of unsatisfactory parts. The key point is to carefully adjust the meshing status of the gear pair: when the spots shown in 1 appear on the surface of the gear rack, it indicates that the driving mechanism is tilted towards the side of the guide rail. At this time, the lower swing wheel (single or double wheel) should be adjusted to move the lower part of the driving mechanism towards the direction of the guide rail until the area of the spots reaches more than 85% of the surface of the gear rack. The smaller the area, the easier it is to damage the gears and racks.

The vibration frequency should be set to obtain large dynamic stress with low energy consumption and the resonance frequency should be used to handle time dependent vibration. However, there may be one or more resonance peaks in large components, and using resonance peaks with higher peaks and lower frequencies for aging can achieve optimal results. The resonance frequency needs to be determined by trial vibration, which slowly increases the speed of the excitation motor from 0, and determines the relationship curve between the amplitude of the workpiece and the motor speed to determine the resonance point of the workpiece. According to the scanning curve, a large acceleration was obtained at 5366r/min, so 5366r/min was determined as the aging frequency.

Prov.According to calculations, when the support points of the beam type components are located along the length of 1/9L on both sides, the vibration resistance is relatively small, making it easy to obtain resonance and vibration effects with larger amplitudes. The geometric shape of the structure on the lifting foundation is similar to a long beam type component, and the structure is complex. Therefore, two support points should be taken on each side for time treatment.

The safety control voltage of 18 is selected with rolling guide shoes,ProvSelf propelled curved arm lifting platform, high accuracy, wear resistance,ProvMobile boarding bridge, and stable lifting. The characteristics of the Jinchuang lifting platform are as follows: 1. There is no need for a machine room above the shaft. 2. The hydraulic elevator is not equipped with a counterweight device to improve the utilization rate of the shaft area. 3. The load and load cylinder of the hydraulic elevator directly act on the foundation pit, and the strength requirements of the shaft are low, Brick or brick concrete structure hoistway can be used for Jinchuang lifting platform safety and stability advantages. Overflow valve: It can prevent system pressure from being too high during upward movement. Emergency manual valve: In case of power failure, it can make the elevator emergency descend to the nearest floor position and open the door.

02 The lifting platform adopts a fully hydraulic lifting mechanism, which can be operated inside the platform bucket and on the elevator body. 03 The working arm of the lifting platform can rotate 360 degrees. 04 The hydraulic system is equipped with a safety valve to prevent the main arm oil cylinder oil pipe from cracking. 05 The hydraulic legs are equipped with a hydraulic locking device to prevent the leg oil cylinder from retracting. 06 The hydraulic system is equipped with an automatic platform overload protection device In order to ensure the safety of operators, each section of the working arm on the platform 07 is equipped with safety limit devices. The hydraulic system seals on the platform 08 are all well-known domestic and foreign brands, and the power of the entire vehicle 09 is a diesel engine with its own power supply. The power supply can also be used. The hydraulic lifting platform is equipped with an emergency lowering device in case of power outage. The 11 folding arm lifting platform product can also use a 50Hz, 380V power motor, and diesel engine dual power.