YongjiSingle rail lifting platformStable quotes

announcer:hp275HP127226562 release time:2024-04-12 11:36:37

According to calculations, when the support points of the beam type components are located along the length of 1/9L on both sides, the vibration resistance is relatively small, making it easy to obtain resonance and vibration effects with larger amplitudes. The geometric shape of the structure on the lifting foundation is similar to a long beam type component, and the structure is complex. Therefore, two support points should be taken on each side for time treatment.

When the lifting base plate descends, the safety net below immediately stops running and descends when encountering obstacles.

Yongji.Check the oil level of the gearbox and make up for new oil if necessary

Now with the arrival of summer, the aluminum alloy lifting platform will certainly suffer from high temperature and rainstorm in summer. It is easy to rust after a long time under this condition, which will seriously shorten the service life of the equipment and cause safety problems. So how should we prevent equipment rust?

.Jinchuang lifting platform product feature 01 is mainly used for high-altitude cargo transportation between floors. With a load capacity of 1-50 tons and a lifting height of 1-25 meters, a guide rail elevator, also known as a hydraulic elevator can be installed indoors and outdoors. The lifting height is high and uses a side mounted oil cylinder, which runs smoothly, has low noise, is convenient for maintenance, and has a long service life. In case of a power outage manual emergency descent can be used, which is safe, convenient, fast, and practical. The pit depth is generally 15cm-30cm, and the top layer height is not affected, The 04 pump station can be customized according to the on-site environment,YongjiGuide rail type lifting platform Lifting platform, suitable for 2-3 floors of steel structures or concrete factories. Both the internal and external parts can be used. The 05 pump station adopts a joint venture pump station and an imported pump station from Italy. If the speed requirement is too high, a joint venture customized pump station can be used to meet the ideal delivery requirements. The 06 oil cylinder and seals are made of imported components, solving the problem of unstable oil pressure for customers, The oil leakage problem of components 07. The oil cylinder is built into the platform 08. The heavy-duty steel wire rope wheel or weighted special chain ensures safety 09. The automatic insurance during the lifting process ensures vehicle safety 10. The synchronous device during the lifting process ensures that the vehicle may not overturn 11. The alarm setting before falling to the ground ensures the safety of the operator 12. The chain or steel wire rope fracture protection device 13. The hydraulic system pressure loss prevention protection device 14. The elevator special flat layer permanent magnet switch is selected, The leveling effect is good. 15. The distance between heavy and empty loads is small, and the leveling accuracy is high. 16. Standard elevator boards, LCD display call boxes, relevant wiring harnesses, and connectors are selected. Beautiful appearance, visual display of the position of the elevator car on the floor, wiring harness connected using connectors, with automatic and manual options.

The selection of vibration pickup points refers to the placement point of the sensor, which is used to measure the vibration amplitude of the workpiece. According to GB/T25712-2010, the acceleration sensor should be placed on the workpiece with a certain rigidity and a large amplitude, and its testing direction should be adjusted to be perpendicular to the plane where the effective zone of the vibration mode is located. Considering the complex structure of the lifting foundation workpiece and the uneven thickness of each component, the vibration pickup point is set in a thick area in the middle of the component.

According to calculations,YongjiMobile boarding bridge 10 tons, when the support points of the beam type components are located along the length of 1/9L on both sides, the vibration resistance is relatively small, making it easy to obtain resonance and vibration effects with larger amplitudes. The geometric shape of the structure on the lifting foundation is similar to a long beam type component, and the structure is complex. Therefore, two support points should be taken on each side for time treatment.


YongjiSingle rail lifting platformStable quotes



According to calculations, when the support points of the beam type components are located along the length of 1/9L on both sides, the vibration resistance is relatively small, making it easy to obtain resonance and vibration effects with larger amplitudes. The geometric shape of the structure on the lifting foundation is similar to a long beam type component, and the structure is complex. Therefore, two support points should be taken on each side for time treatment.

Check the fastening status of the wall bracket, and bolts and retaining rings between the lifting cargo elevator and the bridge. If they are loose or displaced, they should be checked and tightened

Emergency stop: Press the emergency button switch to raise or lower the machine.

How much does it cost?.During aging treatment, the equipment prints the vibration aging curve online. According to the curve, the front end of the a-t curve shows an upward trend, so the amplitude gradually increases; Since then, the amplitude change has been basically stable, indicating that the structure of molecules inside the component tends to be stable, which conforms to the judgment standard of curve observation strip, thus it can be determined that the workpiece has reached the effect. The precautions for using an electric lifting platform are as follows: the user unit should arrange a dedicated person to operate the lifting platform and develop details and safety precautions for the use of the lifting platform based on their own unit's situation, and hang it in a prominent position. When working on an electric lifting platform, professional drivers and operators must be equipped, and they must undergo specialized training and be qualified. They must hold relevant certificates and take on corresponding responsibilities according to the actual situation of the work. After the construction is completed, the lifting platform needs to be moved on the site and should be operated by a professional driver. Before daily work, and mechanical systems of the platform hydraulic, check the working range of the lifting platform truck, and remove obstacles that hinder the rotation and walking of the lifting platform truck. And empty the platform up and down several times to check for any faults or abnormal phenomena. It is also necessary to pay attention to the accuracy of the platform platform landing station for any obvious abnormal differences. Professional improvement of quality assurance for aircraft manufacturers. The promotional activity is ongoing, and new and old customers are welcome to come for consultation

Emergency stop: Press the emergency button switch to raise or lower the machine.

Drivers should be responsible for supervising the uniform distribution of items transported by the platform on the platform as much as possible to prevent partial loading and prohibit overloading. flat


YongjiSingle rail lifting platformStable quotes



02 The lifting platform adopts a fully hydraulic lifting mechanism, which can be operated inside the platform bucket and on the elevator body. 03 The working arm of the lifting platform can rotate 360 degrees. 04 The hydraulic system is equipped with a safety valve to prevent the main arm oil cylinder oil pipe from cracking. 05 The hydraulic legs are equipped with a hydraulic locking device to prevent the leg oil cylinder from retracting. 06 The hydraulic system is equipped with an automatic platform overload protection device, In order to ensure the safety of operators, each section of the working arm on the platform 07 is equipped with safety limit devices. The hydraulic system seals on the platform 08 are all well-known domestic and foreign brands, 380V power motor, and diesel engine dual power.

Honest service.Low failure rate: Due to the use of advanced hydraulic systems and good methods, the failure rate of elevator operation can be minimized. Low power consumption: When the hydraulic elevator descends, it is driven by the pressure generated by its own weight, which greatly saves energy.

Drop test to check if the braking interval of the safety governor meets the requirements of the rules. Equipment transfer maintenance: Check the coupling between the electric motor and the worm gear reducer, and dismantle the gearbox. Clean all components and seals replace excessively worn and deformed parts and smooth oil

Drivers should be responsible for supervising the uniform distribution of items transported by the platform on the platform as much as possible to prevent partial loading and prohibit overloading. flat

Yongji.Thermal aging stress relief is generally suitable for small workpieces,YongjiMobile boarding bridge manufacturer, while the lifting foundation structure has a large volume and does not have a large enough annealing furnace. Using natural aging takes one year and the production cycle is too long, so neither of these two methods is feasible. After research and understanding by the manufacturer, it was found that selecting appropriate support points for large welded structural components can perform vibration aging stress relief. Therefore the manufacturer has decided to use vibration aging for stress relief of the platform lifting foundation. Long term promotion of downgrading manufacturers, 20 year old brand, with price advantages and guaranteed quality!

The lifting foundation of the platform is a large structural component made of alloy steel plates with different thicknesses that are welded together. The welding amount is large, the structural shape is complex, and residual stress is inevitably generated during the manufacturing process. In order to prevent deformation of the components due to changes in residual stress during use, it is necessary to perform stress relief treatment on the completed components.

Now with the arrival of summer, the aluminum alloy lifting platform will certainly suffer from high temperature and rainstorm in summer. It is easy to rust after a long time under this condition, which will seriously shorten the service life of the equipment and cause safety problems. So how should we prevent equipment rust?