Billy sennyStructural diagram of dry-type transformerWhat technologies and materials should be available before construction

announcer:hp122HP117294921 release time:2024-09-12 16:30:21

(II) the height width ratio of dry-type transformer pier installed on the ground is generally 0.5m, and a guardrail of no less than 7m shall be installed around it, and a warning sign shall be hung at a prominent position.

The plastic shells of electrical products and office supplies are equipped with grounding wires. If the insulation layer is damaged and the shell is energized,Billy sennyWhat are the protections for oil immersed transformers, the electric flow will leak into the earth along the installed grounding wires, so as to achieve the purpose of safety, otherwise it will have an adverse impact on life safety.

Billy senny.After the power transformer has been used for a long time, common faults of iron core will occur. Don't worry. Contact the transformer manufacturer, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:

Difference between dry-type transformer and oil immersed transformer:

.Oil immersed transformer

Power transformer is an idealized supporting facility transformer for medium cabinet and high-voltage cabinet at the present stage, and can be equipped with safety protective casing according to different waterproof grades. It is applicable to key or unique natural environment sites such as multi-storey buildings, commerce, airports,Billy sennyOn load voltage regulation of power transformer, tunnel construction, chemical enterprises and factories.

Power transformers are used in all walks of life


Billy sennyStructural diagram of dry-type transformerWhat technologies and materials should be available before construction



The representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side), and English letters indicate the wiring on the secondary side (or secondary side). Y (or y) is star wiring, and D (or D) is triangular wiring.

Maintenance contents of power transformer

The noise of dry-type transformer comes from

How many?.The vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment, the electromagnetic induced noise oscillation may be transmitted from the townhouse to the building structure. The core of noise reduction solution must be changed to copper wire connection.

When sampling in bulk gasoline barrels, samples shall be selected according to 5% of the number of gasoline barrels, but not less than 2 barrels. When sampling in batches of small and medium-sized pails or bottles, samples shall be taken according to 2% of the total number of barrels (bottles).

The sampling container is a colorless glass bottle with a wide mouth ground glass plug with a volume of 0.5kg or 1kg. 2-3 bottles shall be collected at a time for analysis and experiment. Labels shall be attached during sampling. Pay attention to the name, source sampling date, sampling person, weather conditions and other materials of the oil sample.


Billy sennyStructural diagram of dry-type transformerWhat technologies and materials should be available before construction



Sound, causing short circuit obstruction. If not handled properly, it will cause great damage.

Professional is king.Oil leakage at looper flange

Transformer inspection nose sniffing method

The key reason for oil leakage is that there are defects in cast iron parts

Billy senny.Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.

The insulating layer in the middle of the silicon steel plate is aging,Billy sennyDry type transformer scb14, the iron core causes large vortex, temperature rise, and the aging of the insulating layer is accelerated. The core insulation compressive strength of power transformer must be measured on time and accurately. If it is found that the insulation compressive strength is less than the index value, please remove and replace the anchor bolt cover or carry out insulation for the copper core cable.

After no-load test run is normal for 24h, it can be transferred to on-load operation, and the load shall be gradually increased from 25%, 50% and 75% by grade.