HenanFixed boarding bridgeWhat are the calculation methods of bearing capacity

announcer:hp161HP196399230 release time:2024-09-08 18:22:02

The user department of the hydraulic boarding bridge should scientifically analyze the equipment and reasonably determine the investment in the equipment. At the same time, according to the characteristics of the work, ensuring timely loading and unloading of supplied materials; The normal operation of equipment needs to be guaranteed by institutional measures, improve relevant management systems, strengthen dynamic management of equipment faults, monitor the status of key parts, and analyze the patterns of faults through maintenance; It is necessary to ensure the supply of maintenance accessories, establish a spare parts warehouse for vulnerable and commonly used parts, and purchase channels to avoid situations where inadequate preparation may lead to extended downtime and increased repair costs; Users should maintain a close relationship with survival manufacturers, strengthen the professional quality and professionalism of lifting platform maintenance personnel, so that they can handle faults in a short period of time.

Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating, motor reverse, motor phase loss (motor not moving and buzzing), indicator light on press the up button, motor rotates but lifting platform does not rise, lowering valve is open, overflow valve pressure is low, oil level is too low oil pump is empty, oil suction filter is blocked, oil suction section is leaking,HenanContainer fixed boarding bridge, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power, check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at 100% rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.

Henan.High altitude work platform vehicles are mainly divided into four types: scissor type, straight arm type, curved arm type, it should be checked in advance before use, mainly including whether the buttons are effective; Whether the power cord and socket are intact; Whether the oil pipeline is intact; The stability of the guardrail; The tightness of bolts at each junction point; The appearance quality is intact. But when the power is turned on and the indicator light is on, press the up button, the motor rotates but the lifting table does not rise. This may be due to the reverse connection of the three-phase power supply and the motor reversing. Only the power supply needs to be corrected, so it is not a major problem.

Open the manual valve, slowly lower the boarding bridge, scientific processes it is necessary to have production technology, and strict management to ensure production. When in use, people, the environment,HenanMobile Yard Ramps , and machines are the three major links of high-altitude operations, Jiuyi briefly describes the precautions for using high-altitude operation platform vehicles: high-altitude operators must hold a health certificate. Individuals with mental illness, hypertension, or mental illness are not allowed to engage in high-altitude work tasks. Staff are not allowed to engage in high-altitude work while drinking alcohol or feeling mentally drained.

The safety valve of the mobile hydraulic boarding bridge can also generate high noise. When air is mixed into hydraulic oil, the relief valve gets stuck or severely worn and the fatigue deformation of the relief valve spring leads to unstable pressure regulation of the relief valve. The pressure release time of the relief valve is too short, which can easily lead to local stability of the pilot valve performance of the relief valve. Noise is generated by the vibration of the pilot valve's air. Therefore, we should regularly clean the safety valve, and replace it if it is damaged or severely worn.

Customer first.The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.

  1. Before use, check the boarding bridge for obvious damage such as cracks and broken wires.

For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.


HenanFixed boarding bridgeWhat are the calculation methods of bearing capacity



Common&quo; Streamline” Open joint planning, with a welding area more than three times that of other traditional pipeline joints,HenanVehicle boarding bridge, greatly extending the service life and protection life.

knowledge.During excavation, if unidentifiable items or unforeseeable situations are found, the operation should be stopped in a timely manner and reported to the person in charge of the hydraulic boarding bridge for handling. The fixed boarding bridge is an auxiliary equipment for loading and unloading in conjunction with the storage platform. This equipment is integrated with the platform and can be adjusted up or down according to the different heights of the truck carriage, making it convenient for forklifts to enter the carriage. The equipment adopts an imported hydraulic pump station with anti rolling skirts on both sides, making work safer and improving work efficiency.

(5) Each mechanism in the elevator should be checked for normal operation and any noise or other malfunctions. If any, they should be promptly addressed and resolved. All wires and cables in the mobile boarding bridge should be checked for any damage or damage, and if any, they should be promptly wrapped or replaced with new ones.

During use, close attention should be paid to the condition of the equipment, and if there are any problems, the use should be stopped immediately.

Henan.The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.

Operation degree: There are two types of operations that can be used to raise and lower the boarding bridge. One is a manual pump station, which uses manual hydraulic lifting, which is labor-intensive and somewhat labor-intensive. Advantages: It can be operated and used in any situation. Two types of electric pump stations use electric hydraulic lifting and lowering, it will not be able to be used, but now there are both manual and electric boarding bridges that are more convenient to use.

What should I pay attention to when choosing a boarding bridge? The selection and purchase of the boarding bridge involves paying attention to three issues, including its range of use, rated load, and other factors; Their understanding of the manufacturer of the boarding bridge, whether their enterprise qualifications, special equipment licenses are complete, how many after-sales service outlets are there in the country, how about their after-sales service attitude, and whether they are timely; The important point is whether the quality is good or not, and whether the price is reasonable. If both of these situations are reasonable, you can choose the products of the manufacturer.