announcer:hp122HP117294921 release time:2024-08-30 18:59:10

Oil leakage of porcelain pot and laminated glass oil level gauge

Power transformer factory

Minsk.Power transformer is indispensable for power stations and substations but we must pay attention to many problems in the whole process of applying power transformer.

When checking the hook core, the insulation of the electromagnetic coil and the porcelain sleeve is usually accidentally damaged. After the shell of the pottery is broken, if you work again, turn on the photo flash when it's light, please pay attention during maintenance. It is not necessary to destroy the insulation. After maintenance, experts can inspect special tools, parts, insulation, etc. and deliver them after they are determined to be complete and reliable.

.The vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment the electromagnetic induced noise oscillation may be transmitted from the townhouse to the building structure. The core of noise reduction solution must be changed to copper wire connection.

Difference between dry-type transformer and oil immersed transformer:

Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite, resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer, causing the ignition of the casing, causing large-scale power failure, endangering all normal production, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.


MinskCircuit transformerHow to become a qualified operator



The switching power supply lacks one phase of power;

Under normal conditions, different oil-based oils cannot be mixed. Under special circumstances if it is necessary to use new oil of different grades, it should be determined whether the mixed oil with ice degree can be used according to the requirements of the region, and then the oil mixing test should be carried out.

The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation,MinskStructure of 35 kV oil immersed transformer, the good model is the solid model of infinite transformer core column, but there are many calculation methods.

Management Department.Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite, resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer, causing the ignition of the casing, causing large-scale power failure,MinskQuotation for 2500kVA dry type transformer, endangering all normal production, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.

Seal oil leakage

The vibration reduction solution of cable bridge is to modify the hard connection between bus bridge and dry-type transformer, and the vibration reduction solution is made at the cable bridge.


MinskCircuit transformerHow to become a qualified operator



Power transformers are used in all walks of life

The cost is reasonable.Falling foreign matters and piercing

Oil sample inspection & mdash; & mdash; the performance parameters such as compression resistance and residue shall be carried out every three years. The long-term overload or overload of the transformer can reduce the cycle time.

Sound, causing short circuit obstruction. If not handled properly, the transformer was disconnected by vibration (but there was no grounding device).

With the rapid development of society and the continuous development trend of computers, the calculation of data in the whole process of oil immersed transformer wave has long had results. Only effective selection of calculation entity models and methods is needed, the accuracy of calculation conclusions can meet the needs of architectural design, and scientific and reasonable data method is selected, Not only can the current distribution of the oil immersed transformer be clearly defined in the development stage, but also the winding and other structures of the oil immersed transformer can be effectively arranged and distributed in a certain scope, which can control the oscillation below 0.2%, and then reduce the building structure noise transmitted by dry-type transformer oscillation.